Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -25.70% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 L+₹1,726.33 (0.93%)Admitted-Fee/PreQual/Technical/Finance | -25.01% | ₹1.9 L+₹1,726.33 (0.93%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 L+₹2,001.54 (1.08%)Admitted-Fee/PreQual/Technical/Finance | -24.90% | ₹1.9 L+₹2,001.54 (1.08%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.9 L+₹7,755.96 (4.17%)Admitted-Fee/PreQual/Technical/Finance | -22.60% | ₹1.9 L+₹7,755.96 (4.17%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.0 L+₹13,035.02 (7.01%)Admitted-Fee/PreQual/Technical/Finance | -20.49% | ₹2.0 L+₹13,035.02 (7.01%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
27 Jul 2026, 4:00 pmClosed
Executive Engineer IFCD Ganderbal
Irrigation and FC DIvision Ganderbal
Constt. of R/Wall of Irrigation Khul from main khul to onwards at Batsar Kurg
2026_IFC_316958_1
eNIT NO 12 OF 2026-27
Open Tender
Civil Works
Percentage
21 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Irrigation and FC DIvision Ganderbal
₹7,500
12 Aug 2026
20 Jul 2026
28 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by
Engineer-in-Charge. All kinds of soil. | 19.92 | Cum | 187.3 | ₹3,731.02 |
| 2 | Providing and Laying of stone soling hand packed in horizontal on level including cost of stones. | 3.45 | Cum | 937.9 | ₹3,235.76 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 3.83 | Cum | 5,202.9 | ₹19,927.11 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 25.85 | Cum | 5,733.6 | ₹1,48,227.89 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 137.88 | Sqm | 286.35 | ₹39,481.94 |
| 6 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 88.09 | Sqm | 283.8 | ₹24,999.94 |
| 7Carriage of different materials by Mechanical Transport including loading ,unloading and stacking from different sources upto site of work. | |||||
| 7.1 | Sand for an average lead of 07 km. | 14.55 | Cum | 232.06 | ₹3,376.47 |
| 7.2 | 40mm stone aggregate for an average lead of 07 km. | 3.45 | Cum | 252.25 | ₹870.26 |
| 7.3 | 20mm stone aggregate for an average lead of 07 km. | 23.27 | Cum | 232.06 | ₹5,400.04 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.07 MB
BOQ_1036467.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .