| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC First lowest tenderer |
| 2 | 2₹1.6 Cr+₹11.9 L (8.26%)Rejected-AOC | ₹1.6 Cr+₹11.9 L (8.26%) | 2 | Rejected-AOC Second lowest tenderer |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
18 Mar 2024, 3:00 pmClosed
Executive Engineer, Transmission Division, Thiruva
Office of the Executive Engineer, Tranmission Division TVM, 66kV GIS Substation, LA Complex, Vikas Bhavan
Proposed 110kV Switching Cum Substation, Panthalacode - Construction of Foundation of Yard Structures and Equipments, Cable Trench etc and related Works
2024_KSEB_650329_1
TDT/12/2023-24/dtd 23.01.2024
Open Tender
Civil Works - Others
Item Rate
90 days
Panthalacode
As Per BID Conditions
7 documents required · 7 mandatory
₹5,900
Yes
₹50,000
Yes
Office of the Executive Engineer, Transmission Div
23 Sept 2024
29 Jan 2024
30 Mar 2024
29 Jan 2024
18 Mar 2024
1 Feb 2024
29 Jan 2024 - 15 Mar 2024
5 Feb 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches for Column (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all class soil etc. complete as per the direction of Board staff. For all class of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches for Column (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m to 3 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in all class soil etc. complete as per the direction of Board staff.
Providing and laying in position cement concrete of 1:4:8 using 40mm nominal size hard granite broken stone for foundation leveling course including cost of all materials and labour, watering, curing etc.complete as per the standard specifications and direction of Board staff.
Centering and shuttering including strutting, propping etc. and removal of form work for foundations, footings, base of columns as per the standard specifications and direction of Board staff.
Centering and shuttering including strutting, propping etc. and removal of formwork for any thickness of walls as per the standard specifications and direction of Engineer - in- charge
Centering and shuttering including strutting, propping etc. and removal of formwork for any thickness of Lintels, beams, plinth beams, girders, bressumers and cantilever as per the standard specifications and direction of Engineer - in- charge
Centering and shuttering including strutting, propping etc. and removal of formwork for any thickness of Columns, Pillars, Piers, Abutments, Posts and Strut as per the standard specifications and direction of Engineer - in- charge
Providing and laying in position specified grade (M20) of 1:1.5:3 reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)- All work up to plinth level :
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with M20 grade 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). Code Description Unit Quantity Rate Amount
Steel reinforcement for R.C.C. work using TMT steel bars including straightening, cutting, bending, placing in position and binding all complete upto plinth level etc. complete as per the direction of Board staff. Thermo-Mechanically Treated bars
Stub setting in correct alignment for 110 kV yard columns, surveying and fixing the stubs with template for the set including removing the template after the expiry of the pre-determined time etc. complete as per the direction of Engineer - in- charge
Stub setting in correct alignment for Isolators surveying and fixing the stub using template for the set including removing the template after the expiry of the pre-determined time etc. complete as pet the directon of Engineer - in- charge
Fixing foundation bolt for yard equipment supporting structres of CT, LA, , NCT, CB etc. and other equipment, using template into concrete structures at the time of concreting as per directions of the departmental officers at site.
Supplying, cutting, levelling and carefully placing Class III 52kg or nearest size rails in lines and levels , welded to ISMC 100 placed at 1m.(one meter) interval prior to concreting including providing angle iron parallel to the rails as edge support etc as per the direction of departmental staff at site. As per approved drawings(LMR)
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per the direction of departmental officers at site..GI Angles will be supplied departmentally
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m etc. complete as per the standard specifications and direction of Board staff.
Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymermodified adhesive mortar all complete as per direction of Engineer-in-Charge. (Thepayment of RCC band and reinforcement shall be made for seperately).
Plastering with cement mortar 1:3, 12 mm thick one coat, floated hard and trowelled smooth with a neat cement flushing coat, floor finish etc complete to the exposed portion of foundation structures including cost of all materials and labour etc. complete as per the standard specifications and direction of Board staff. Cement mortar 1:3 (1 cement : 3 fine sand).
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
Shifting and placing in position/ rearrangement of precast RCC slab over the trench as per the direction of Engineer - in- charge.
Red Star Constructions
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .