Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAdmitted-Fee/PreQual/Technical/Finance ERATTUPETTA BLOCK PANCHAYATH KERALA | ₹20.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.8 L+₹11,433.72 (0.55%)Admitted-Fee/PreQual/Technical/Finance | ₹20.8 L+₹11,433.72 (0.55%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Denny Jose L1 | VINOD BHASKAR L2 |
|---|---|---|---|---|---|
| 1.00Appendix A - DR Masonry & Bed Level beam | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 99.7 | cum | 255 ₹25,422.74 Lowest | 257.63 ₹25,684.94 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 39.48 | cum | 2,314 ₹91,356.72 | 757.52 ₹29,906.89 Lowest |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 27.64 | cum | 1,698 ₹46,925.93 Lowest | 1,715.88 ₹47,420.06 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 14.43 | cum | 2,937 ₹42,380.91 Lowest | 2,967.19 ₹42,816.55 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 85.01 | cum | 3,956 ₹3,36,315.38 Lowest | 3,993.46 ₹3,39,500.01 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.79 | cum | 9,143 ₹3,18,057.54 Lowest | 9,235.97 ₹3,21,291.69 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 196.24 | sqm | 382 ₹74,962.15 Lowest | 386.16 ₹75,778.49 |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 5.76 | metre | 112 ₹645.12 Lowest | 113.08 ₹651.34 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,609.03 | kilogram | 111 ₹2,89,601.78 Lowest | 112.43 ₹2,93,332.68 |
Tender Value
₹20.9 L
EMD Value
₹50,000
Closing Date
21 Jul 2026, 11:00 amClosed
Executive Engineer
Executive Engineer Minor Irrigation Division,Kottayam
Construction of protection wall and providing covering slab to Vayala thodu along the NSS Karayogam
2026_Irrig_860693_1
IRR/IA/TR/1606/2026_5_1_1/2
Open Tender
Civil Works - Others
Item Rate
360 days
vayala
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
23 Jul 2026
16 Jul 2026
22 Jul 2026
16 Jul 2026
21 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - DR Masonry & Bed Level beam | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.8 | cum | - | - |
| 1.002 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - |
| 1.003 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 1 | cum | - | - |
| 1.004 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.005 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.6 | cum | - | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 0.4 | sqm | - | - |
| 1.008 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 1 | metre | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.02 MB
finance_1455522.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 4.48 MB
BOQ_1455522.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .