| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance 1 102 UNION OFFICE ROAD VEPPUR POST KUNNAM TALUK PERAMBALUR 621 717 | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621717 | L1 | Admitted-Finance | |
| 2 | L2₹4.0 Cr+₹3.0 L (0.76%)Admitted-Finance 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | L2 | Admitted-Finance | |
| 3 | L3₹4.0 Cr+₹4.5 L (1.12%)Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L3 | Admitted-Finance | |
| 4 | L4₹4.1 Cr+₹6.3 L (1.58%)Admitted-Finance NO 137 TRICHY MAIN ROAD PIDAGAM POST VILLUPURAM TK 605 401 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605401 | L4 | Admitted-Finance | |
| 5 | L5₹4.2 Cr+₹22.6 L (5.67%)Admitted-Finance NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | bharaniengineeringworks L6 | petchimuthu L5 | Vidhyut Nirman Corporation L2 | K.S.MANJU L3 | K Rajkumar L4 | K DHINAKARAN L7 | SS BUILDERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||||||
| 1.01 | Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, liftetc complete . | 6,850 | Sqm | 6.36 ₹43,566 | 1 ₹6,850 Lowest | 1 ₹6,850 Lowest | 7.89 ₹54,046.5 | 1 ₹6,850 Lowest | 3 ₹20,550 | 3 ₹20,550 |
| 2.00 | Site grading and levelling and sectioning by earth moving machineries as per the direction of site engineer including cost of all labour ,lead, lift etc complete | 30 | Hr | 1,000 ₹30,000 | 100 ₹3,000 Lowest | 500 ₹15,000 | 1,234.56 ₹37,036.8 | 1,201 ₹36,030 | 2,000 ₹60,000 | 900 ₹27,000 |
| 3.00 | Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer. | 9,572 | cum | 650 ₹62,21,800 | 100 ₹9,57,200 Lowest | 465 ₹44,50,980 | 234.56 ₹22,45,208.32 | 251 ₹24,02,572 | 1,000 ₹95,72,000 | 625 ₹59,82,500 |
| 4.00Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | ||||||||||
| 4.01 | HGS | 557 | cum | 203 ₹1,13,071 | 160 ₹89,120 | 150 ₹83,550 Lowest | 234.56 ₹1,30,649.92 | 201 ₹1,11,957 | 300 ₹1,67,100 | 250 ₹1,39,250 |
| 4.02 | SDR not requiring blasting | 557 | cum | 300 ₹1,67,100 | 200 ₹1,11,400 | 155 ₹86,335 Lowest | 234.56 ₹1,30,649.92 | 201 ₹1,11,957 | 300 ₹1,67,100 | 300 ₹1,67,100 |
| 4.03 | MR & DMR with blasting | 139 | cum | 800 ₹1,11,200 | 10 ₹1,390 Lowest | 160 ₹22,240 | 234.56 ₹32,603.84 | 301 ₹41,839 | 300 ₹41,700 | 450 ₹62,550 |
| 4.04 | HR with blasting | 111 | cum | 1,000 ₹1,11,000 | 10 ₹1,110 Lowest | 165 ₹18,315 | 234.56 ₹26,036.16 | 501 ₹55,611 | 300 ₹33,300 | 550 ₹61,050 |
| 4.05 | Removal of hard rock by wedging and chiseling.. | 28 | cum | 1,000 ₹28,000 | 10 ₹280 Lowest | 170 ₹4,760 | 234.56 ₹6,567.68 | 1,001 ₹28,028 | 300 ₹8,400 | 550 ₹15,400 |
Tender Value
Refer Docs
EMD Value
₹4.6 L
Closing Date
26 Mar 2026, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Construction of control room building with electrification septic tank ,Providing foundation concrete for structure , equipment plinth and other related civil works for the proposed 110 KV SS at Manapparai SIPCOT
2026_EB_674025_1
CE/TP-II/TRY/C-122/25-26
Open Tender
Civil Works
Works
180 days
MANAPPARAI
Construction of control room building with electrification septic tank ,Providing foundation concrete for structure , equipment plinth and other related civil works for the proposed 110 KV SS at Manapparai SIPCOT
4 documents required · 4 mandatory
₹0
₹4.6 L
Yes
4 Jul 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
26 Mar 2026
16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, liftetc complete . | 6,850 | Sqm | - | - |
| 2 | Site grading and levelling and sectioning by earth moving machineries as per the direction of site engineer including cost of all labour ,lead, lift etc complete | 30 | Hr | - | - |
| 3 | Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer. | 9,572 | cum | - | - |
| 4Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | |||||
| 4.01 | HGS | 557 | cum | - | - |
| 4.02 | SDR not requiring blasting | 557 | cum | - | - |
| 4.03 | MR & DMR with blasting | 139 | cum | - | - |
| 4.04 | HR with blasting | 111 | cum | - | - |
| 4.05 | Removal of hard rock by wedging and chiseling.. | 28 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.12 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 0.58 MB
BOQ_810139.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .