Tender ID
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59.3 L PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | L1 | - | |
| 2 | L2₹60.1 L+₹83,712.86 (1.41%) PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | L2 | - | |
| 3 | L3₹61.6 L+₹2.3 L (3.89%) PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | L3 | - | |
| 4 | L4₹62.8 L+₹3.6 L (5.99%) PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | L4 | - | |
| 5 | L5₹64.1 L+₹4.8 L (8.05%)Financial bid opened PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). | L5 | Financial bid opened |
Tender Value
₹85.4 L
EMD Value
₹1.7 L
Closing Date
11 Feb 2026, 3:00 pmClosed
EE-Mussoorie
Bajrang Singh
cpwd office
PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE BY MAKING PROVISIONS FOR CHAJJAS OVER THE WINDOWS OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ON STEEL WORK ETC.), RESTORATION WORK ON THE COLLAPSED RETAINING WALL AND FOOTPATH DUE TO A LANDSLIDE NEAR THE VIDHYANSHAL BUILDING AT MALACOFF, LBSNAA, MUSSOORIE, PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE FROM THE GROUND FLOOR TO THE BASEMENT FLOOR OF THE MONASTERY HOSTEL ALONG WITH CLOSING ALL GREEN AREA LYING NEAR THE GLASS HOUSE OF THE MONASTERY HOSTEL, LBSNAA, MUSSOORIE. (SH:- APP (ATACTIC POLYPROPYLENE POLYMER)- MODIFIED, PREFABRICATED FIVE-LAYER, 3 MM THICK WATERPROOFING MEMBRANCE WORK, GRANITE WORK, ETC.) AND PREVENTIVE MEASURES AGAINST SEEPAGE/LEAKAGE INCLUDE MAKING PROVISIONS FOR CHAJJA OVER THE WINDOWS OF THE TYPE-V QUARTERS OF THE MAPPLEHAYS BUILDING LBSNAA, MUSSOORIE. (SH:- FIXING ALUMINUM COMPOSITE PANELS ONTO STEEL WORK ETC.). Subwork/Packages: WORKS
142196
75/EE/MUSSOORIE/2025-26
OPEN
Civil Works - Others
NCB
3 months
Dehradun, Uttarakhand
7 documents required · 7 mandatory
₹1.7 L
Not Applicable
11 Feb 2026
3 Feb 2026
11 Feb 2026
11 Feb 2026
11 Feb 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
75NITandSCHEDULEPREVENTIVEMEASURES.pdf
document • 1.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .