Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC Accepted being L1 |
| 2 | L2₹2.7 Cr+₹28.6 L (11.9%)Rejected-Finance | ₹2.7 Cr+₹28.6 L (11.9%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹2.7 Cr+₹30.5 L (12.7%)Rejected-Finance 9TH MILE NAMLI PO RANIPOOL DIST GANGTOK | GANGTOK | GANGTOK | SIKKIM | 737135 | ₹2.7 Cr+₹30.5 L (12.7%) | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹3.1 Cr+₹66.5 L (27.6%)Rejected-Finance RHENOCK BAZAR EAST SIKKIM PIN 737133 | RHENOCK | EAST SIKKIM | SIKKIM | 737133 | ₹3.1 Cr+₹66.5 L (27.6%) | L4 | Rejected-Finance Rejected being L4 |
| 5 | L5₹3.6 Cr+₹1.2 Cr (47.9%)Rejected-Finance LADAKHI MANSION BALUWAKHANI GANGTOK SIKKIM PIN 737103 | GANGTOK | EAST DISTRICT | SIKKIM | 737103 | ₹3.6 Cr+₹1.2 Cr (47.9%) | L5 | Rejected-Finance Rejected being L5 |
| Sl No | Description | Qty | Unit | LADAKHI INFRASTRUCTURE AND DEVELOPER L5 | Ambar Singh Subba L3 | Swastik Engineering L1 | M/s Maa Jagdamba Trading L4 | SURESH KUMAR MITTAL L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00BETWEEN KM 45.00 TO KM 53.00 (DESIGNED CHAINAGE BETWEEN KM 45.79 TO KM 55.44) ON RISHI-RONGLI-KUPUP ROAD | ||||||||
| 1.01 | Supply and stacking of stone aggregates of size 40 mm all as specified | 1,097.15 | Cum | 3,974 ₹43,60,074.1 | 3,156 ₹34,62,605.4 | 2,880 ₹31,59,792 | 2,751 ₹30,18,259.65 Lowest | 3,000 ₹32,91,450 |
| 1.02 | Supply and stacking of stone aggregates of size 20 mm all as specified | 2,655.8 | Cum | 3,974 ₹1,05,54,149.2 | 3,156 ₹83,81,704.8 | 2,880 ₹76,48,704 Lowest | 3,131 ₹83,15,309.8 | 3,500 ₹92,95,300 |
| 1.03 | Supply and stacking of stone aggregates of size 10 mm all as specified | 1,537.39 | Cum | 3,974 ₹61,09,587.86 | 2,575 ₹39,58,779.25 | 2,340 ₹35,97,492.6 Lowest | 2,751 ₹42,29,359.89 | 3,200 ₹49,19,648 |
| 1.04 | Supply and stacking of stone dust (dry) all as specified | 4,734.96 | Cum | 3,091 ₹1,46,35,761.36 | 2,400 ₹1,13,63,904 | 2,050 ₹97,06,668 | 3,211 ₹1,52,03,956.56 | 2,000 ₹94,69,920 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹3.6 L
Closing Date
29 May 2026, 12:00 pmClosed
Chief Engineer Project Swastik
HQ Chief Engineer Project Swastik, Gangtok
SUPPLY AND STACKING OF CRUSHED STONE AGGREGATES OF VARIOUS SIZES AND STONE DUST (DRY) BETWEEN KM 45.00 TO KM 53.00 (DESIGNED CHAINAGE BETWEEN KM 45.79 TO KM 55.44) ON RISHI-RONGLI-KUPUP ROAD FOR PMT WORKS UNDER 130 RCC/764 BRTF UNDER PROJECT SWASTIK
2026_BRO_763192_1
80636
Open Tender
Civil Works - Roads
Item Rate
BETWEEN KM 45.00 TO KM 53.00 (DESIGNED CHAINAGE )
As per tender document
8 documents required · 8 mandatory
₹0
₹3.6 L
Yes
HQ Chief Engineer Project Swastik, Gangtok
8 Jul 2026
2 May 2026
30 May 2026
4 May 2026
29 May 2026
12 May 2026
4 May 2026 - 9 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BETWEEN KM 45.00 TO KM 53.00 (DESIGNED CHAINAGE BETWEEN KM 45.79 TO KM 55.44) ON RISHI-RONGLI-KUPUP ROAD | |||||
| 1.01 | Supply and stacking of stone aggregates of size 40 mm all as specified | 1,097.15 | Cum | - | - |
| 1.02 | Supply and stacking of stone aggregates of size 20 mm all as specified | 2,655.8 | Cum | - | - |
| 1.03 | Supply and stacking of stone aggregates of size 10 mm all as specified | 1,537.39 | Cum | - | - |
| 1.04 | Supply and stacking of stone dust (dry) all as specified | 4,734.96 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tender636.pdf
Tender Documents • 0.98 MB
BOQ_854870.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .