Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC GOSAIPUR MOHAV CHOLAPUR VARANASI | CHANDAULI | UTTAR PRADESH | 221009 | L1 | Accepted-AOC aoc | |
| 2 | L2₹4.8 L+₹3,944.30 (0.83%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹5.4 L+₹63,627.20 (13.4%)Rejected-Finance SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L3 | Rejected-Finance Reject | |
| 4 | L4₹5.9 L+₹1.2 L (24.5%)Rejected-Finance NADIHAR RAJGARH MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | L4 | Rejected-Finance Reject | |
| 5 | L5₹6.3 L+₹1.5 L (32.1%)Rejected-Finance | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SHARDA CONSTRUCTION L5 | M/S KRISHNA NAND SINGH L4 | MS SHREYA CONSTRUCTION L3 | M/S INDRAJEET SINGH L1 | M/S GUFRAN CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance:- Cutting of behya/sarpat, gondi/elephanta grass and other weeds including cost of all labour T&P etc. for proper dispsal and completion of work. | 21,440 | M2 | 2.7 ₹57,888 | 2.31 ₹49,526.4 | 2.2 ₹47,168 | 1.32 ₹28,300.8 | 0.1 ₹2,144 Lowest |
| 2.00 | Scrapping:- Earth work in correcting internal section/silt clearence of Canal by hydraulic excavator (Poclain) with side cutting at required slope including all lead and lift in all type of soil with proper disposal, compaction and dressing of bank and daula as per directed by site in charge. | 11,190 | Cum | 51 ₹5,70,690 | 48.51 ₹5,42,826.9 | 44 ₹4,92,360 | 40 ₹4,47,600 Lowest | 42.69 ₹4,77,701.1 |
Tender Value
₹7.7 L
EMD Value
₹15,380
Closing Date
8 Nov 2025, 3:00 pmClosed
Ex.Eng. Belan Canal Division Prayagr
Office of the Ex.Eng. Belan Canal Division, Govindpur, Prayagraj
Silt Clearance/Scraping of Upraudh Dy From Km. 2.800 to Km. 16.200 By Hydralick Excavator (Poclain).
2025_UPIDC_1086955_7
04/E.E./2025-26
Open Tender
Miscellaneous Services
Item Wise
30 days
Prayagraj
Please refer tender documents.
2 documents required · 2 mandatory
₹766
₹15,380
28 Dec 2025
30 Oct 2025
8 Nov 2025
30 Oct 2025
8 Nov 2025
30 Oct 2025
Amount
Jungle clearance:- Cutting of behya/sarpat, gondi/elephanta grass and other weeds including cost of all labour T&P etc. for proper dispsal and completion of work.
Scrapping:- Earth work in correcting internal section/silt clearence of Canal by hydraulic excavator (Poclain) with side cutting at required slope including all lead and lift in all type of soil with proper disposal, compaction and dressing of bank and daula as per directed by site in charge.
M/S GUFRAN CONSTRUCTION (BID ID -5661776)
MS SHREYA CONSTRUCTION (BID ID -5662100)
M/S KRISHNA NAND SINGH (BID ID -5662235)
SHARDA CONSTRUCTION (BID ID -5658723)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
doc4.pdf
Tender Documents • 1.33 MB
BOQ_1993315.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .