Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹9.3 L−₹1.8 L (16.4%)Accepted-AOC | ₹9.3 L−₹1.8 L (16.4%) | 2 | Accepted-AOC L1 |
| 2 | 1₹11.1 LRejected-AOC | ₹11.1 L | 1 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOOSA K L1 | Dorall Infrastructures and Developers Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.0Construction of Anganvadi building | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 24.45 | cum | - | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 3.23 | cum | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 cement : 1½ coarse sand :3 graded stone aggregate 20 mm nominal size).All work up to plinth level. | 3.2 | cum | - | - |
| 1.04 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars. | 355.86 | kg | - | - |
| 1.05 | Random rubble masonry with hard stone in foundation and plinth including velling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone agregate 20 mm nominal size) upto plinth level with.Cement mortar 1:6 (1 cement : 6 coarse sand) | 26.62 | cum | - | - |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - 1:1½:3 (1 cement : 1½ coarse sand :3 graded stone aggregate 20 mm nominal size) up to floor five level excluding cost of centering, shuttering, finishing and reinforcement. | 13.59 | cum | - | - |
| 1.07 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars. | 1,122.4 | kg | - | - |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. forma ss concrete. | 1.8 | sqm | - | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 8.9 | sqm | - | - |
Tender Value
₹12 L
EMD Value
₹30,000
Closing Date
7 Dec 2016, 5:00 pmClosed
Assitant Engineer- Moonniyoor GP
Assistant Engineer, LSGD Section, Moonniyoor, Velimukku(PO)
BUILDING CONSTRUCTION
2016_LSGD_89005_1
1.11/AE/E TENDER-1/2016-17
Open Tender
Civil Works - Buildings
Item Rate
180 days
Moonniyoor GP
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,625
online
₹30,000
26 Jun 2026
28 Nov 2016
13 Dec 2016
28 Nov 2016
7 Dec 2016
28 Nov 2016
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_106767.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .