Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹39.8 L
EMD Value
₹50,000
Closing Date
17 Oct 2026, 3:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
O/o Executive Engineer PWD Building Division Alappuzha
GENERAL-General Education Department - Annual Plan 2023-24- Construction of school building for Government U.P. School, Aryad North, Alappuzha-Construction of First Floor Class rooms-General Civil Work
2026_PWD_878079_1
PWD/BLDG/TR/12791/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
450 days
Alappuzha District
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
₹50,000
9 Oct 2026
9 Oct 2026
19 Oct 2026
9 Oct 2026
17 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DETAILED ESTIMATE | |||||
| 1.001 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 112.5 | sqm | - | - |
| 1.002 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 245.47 | sqm | - | - |
| 1.003 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 162.41 | sqm | - | - |
| 1.004 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 19.47 | sqm | - | - |
| 1.005 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 68.62 | metre | - | - |
| 1.006 | OD78567/2023-2024:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Detailed mix design to be supplemented. Note:- Minimum cement content to be adopted is 350kg/cum. (Cost of excess/less cement used as per design mix will not be payable or recoverable seperately).All work above plinth level upto floor V level | 62.52 | cum | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 7,084.14 | kg | - | - |
| 1.008 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 47.17 | cum | - | - |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 713.81 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagt.pdf
Tender Documents • 0.21 MB
affidavit.pdf
Tender Documents • 0.02 MB
epay.pdf
Tender Documents • 0.14 MB
BOQ_1492323.xls
BOQ • 0.34 MB
viewsbd.pdf
Tender Documents • 2.42 MB
tenderform.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .