Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.4 LAdmitted-Finance | -2.94% | ₹13.4 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹13.8 L
EMD Value
₹28,000
Closing Date
10 Aug 2026, 2:00 pmClosed
Executive Engineer CMD BHEP
Office of the Executive Engineer CMD BHEP Chanderkote Ramban
Repair of Uplift Pressure Measurement Devices Phase 1 by way of drilling of choaked holes upto Rock Bed level and replacement of damaged Bourdon Gauges and Gate Valves in 714.50 Gallery of Dam BHEP Chanderkote including consultation from a reputed c
2026_SPDC_318902_1
ENIT 13 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Dam Site BHEP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
CPAO BHEP
₹28,000
18 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
1 Aug 2026 - 10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Redrilling of choaked uplift pressure pipes inclusive of carriage of equipoments, diesel, all complete. (To be as per actual at site) | 129.81 | meter | 6,830 | ₹8,86,602.3 |
| 2 | Providing and fixing Bourdon pressure gauge for measuring the uplift pressure. | 16 | each | 30,000 | ₹4,80,000 |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | - | cum | 1,725.2 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | cum | 7,275.25 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work.Foundations, footings, bases of columns etc. for mass concrete. | 12.96 | sqm | 286.35 | ₹3,711.1 |
| 6Carriage of material By Mechanical Transport including loading, unloading and stacking (To be paid as per actual) | |||||
| 6.01 | Cement avg 15 km | 0.59 | MT | 306.18 | ₹180.65 |
| 6.02 | Sand avg 125 km | 0.61 | cum | 1,569.14 | ₹957.18 |
| 6.03 | Aggregate avg 15 km | 1.23 | cum | 344.49 | ₹423.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
SBDChoked.pdf
Tender Documents • 0.68 MB
BOQ_1053486.xls
BOQ • 0.38 MB
Corrigendum1Nit13.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .