Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -22.23% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹98,289.12 (21.5%)Admitted-Finance | -5.51% | ₹5.6 L+₹98,289.12 (21.5%) | L2 | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹11,760
Closing Date
6 Aug 2026, 6:00 pmClosed
Executive Engineer PWD Electrical Div. Ist Jodhpur
Executive Engineer PWD Electrical Div. Ist Jodhpur
Electric Repair and Maintenance of Various Transformers in MG Hospital Jodhpur.
2026_CEPWD_581544_2
NIT No.18/2026-27 of EE PWD Elect.Dn.I Jodhpur
Open Tender
Electrical Works
Percentage
20 days
Executive Engineer PWD Electrical Div. Ist Jodhpur
Please refer Tender documents
3 documents required · 3 mandatory
₹500
Secretary, RREIS Executive Engineer PWD Electrica
₹11,760
Yes
Executive Engineer PWD Electrical Div. Ist Jodhpur
11 Aug 2026
4 Aug 2026
7 Aug 2026
4 Aug 2026
6 Aug 2026
4 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Collection , Filtration and dehydration of existing transformer oil with the help of high vaccum filtration machine and cleaning of core-coil assembly by hot oil for removal of sludge / dust particles etc. as required. | 2,800 | P.Ltr | 19.47 | ₹54,516 |
| 2 | Supply and filling of fresh transformer oil as per IS: 335 in existing transformer along with submission of oil test report for its physical and chemical properties.The oil shall be clear and free from any suspended matter or sediments complete as required complete in all respect. . | 1,000 | Liter | 169.92 | ₹1,69,920 |
| 3 | Replacement of existing transformer oil confirming to IS: 335 after removing of old oil and remove from site (old oil shall be retained by the contractor) | 900 | Liter | 141.6 | ₹1,27,440 |
| 4 | Repairing of LT/HT bushings of Distribution Transformers including replacement of brass studs , porcelain insulators , nut bolts , oil seals , gaskets etc. complete as required complete in all respect. . | - | - | - | - |
| 5 | LT Bushing Set | - | - | - | - |
| 6 | 63 KVA | 1 | Set | 2,236.1 | ₹2,236.1 |
| 7 | 160 KVA | 1 | Set | 3,025.52 | ₹3,025.52 |
| 8 | 250 KVA | 1 | Set | 4,078.08 | ₹4,078.08 |
| 9 | 315 KVA | 1 | Set | 4,472.2 | ₹4,472.2 |
| 10 | 630 KVA | 4 | Set | 6,840.46 | ₹27,361.84 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 20.11 MB
Tendernotice_3.pdf
PDF • 1.91 MB
Tendernotice_4.pdf
PDF • 0.79 MB
BOQ_1033300.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .