Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC KARIMPANAKKAL HOUSE P O PIACHIKKARA 671534 KASARAGOD DT KERALA STATE | PIACHIKKARA | KASARAGOD | KERALA | 671534 | ₹21.1 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | MUKESH VARKEY L1 |
|---|---|---|---|---|
| 1.00Road work | ||||
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 93.75 | cum | 3,514.28 ₹3.3 L |
| 1.00 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 625 | sqm | 76.34 ₹47,712.50 |
| 1.00 | 5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 625 | sqm | 16.5 ₹10,312.50 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 589.6 | sqm | 384.66 ₹2.3 L |
| 1.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 4,563 | sqm | 13.79 ₹62,923.77 |
| 1.01 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 5,188 | sqm | 275.4 ₹14.3 L |
| 1.01 | 3.7:Removal of Unsuitable Soil with Disposal upto 1000 m <br> Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 | 30 | cum | 51.16 ₹1,534.80 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
21 Mar 2026, 6:00 pmClosed
Assistant Execurtive Engineer
Office of the Executive Engineer LID AND EW DIVISION, KASARAGOD P.O. VIDYANAGAR
ROAD MAINTENANCE
2026_LSGD_838840_2
224/25-26
Open Tender
Civil Works - Roads
365 days
KINANOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
22 May 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
21 Mar 2026
13 Mar 2026
Road work
4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
5.2.3a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65)
5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65)
3.7:Removal of Unsuitable Soil with Disposal upto 1000 m <br> Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1431735.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd224.pdf
Tender Documents • 1.64 MB
BOQ_1431735.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid