Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.2 LAccepted-AOC 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹13.2 L | L1 | Accepted-AOC AOC Completed |
| 2 | L2₹14.0 LRejected-Finance | ₹14.0 L | L2 | Rejected-Finance As Per Highest Rate |
| 3 | L3₹14.4 LRejected-Finance | ₹14.4 L | L3 | Rejected-Finance As Per Highest Rate |
| 4 | L4₹15.1 LRejected-Finance | ₹15.1 L | L4 | Rejected-Finance As Per Highest Rate |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
13 Apr 2026, 12:00 pmClosed
Executive Engineer
EE CD-3 PWD Lakhimpur Kheri
Reconstruction of Bheera Palia road to Itkuti Mithu Tanda link road.
2026_CEUCZ_1131835_1
485/e-tender/2026 Dated 24-03-2026
Open Tender
Civil Works - Roads
60 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.9 L
Yes
EE CD-3 PWD Lakhimpur Kheri
29 May 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density. | - | Cum | - | - |
| 2 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. | - | Cum | - | - |
| 3 | Construction of shoulder with approved material obtained from borrow pits(carted earth) with a lift upto 1.5m & lead up to 1000 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 . as per Technical Specification clause 301.5 | - | Cum | - | - |
| 4 | 5 Years Maintenance Charge | - | JOB | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
T1.pdf
Tender Documents • 1.34 MB
BOQ_2112129.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid