Tender ID
Tender Value
₹4.2 Cr
EMD Value
₹4.2 L
Closing Date
11 Feb 2026, 6:00 pmClosed
Executive Engineer’s office, Valsad (R&B) Division,
Construction & Widening of Four lane road & bridge on Tithal Valsad Dharmpur Nasik road k.m 8/0 to 31/4 in valsad District in state of Gujarat
268863
40 of 2025-26
Open
Civil - All
Works
Valsad
8 documents required · 8 mandatory
₹6,000
Yes
Executive Engineer, Valsad (R&B)Division, Valsad
₹4.2 L
Yes
23 Jan 2026
23 Jan 2026
23 Jan 2026
11 Feb 2026
23 Jan 2026
NAME OF WORK :- Construction & Widening of Four lane road & bridge on Tithal Valsad Dharmpur
Nasik road k.m 8/0 to 31/4 in valsad District in state of Gujarat.
BILL OF QUANTITIES
Item Description of Item (with brief specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) figures
1 Dismantling of existing structures including stacking of
serviceable materials and disposal of unserviceable
materials with all lead and lift.
i) R.C.C. work 1001.10 Cu.m. 1053.42
i) Rubble Masonry work 126.00 Cu.m. 373.60
2 Clearing and grubbing road land including uprooting 1.80 Hectare 28393.04
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials (C) By
mechanical means in area of light jungle
3 Excavation for foundation in sand , gravel , clay soft 6195.00 Cu.m. 501.09
soils & murrum etc. including sorting and strutting and
dewatering as necessary and disposing of excavated
stuff as directed. With all lead & lift.
4 Providing & filling in foundation as base course with 2849.30 Cu.m. 3610.58
ordinary cement concrete of M 15 mix and providing
necessary vertical pin headers including formwork
vibrating ramming & curing complete.
5 Providing and casting in situ controlled cement 1295.42 Cu.m. 5171.20
concrete M-25 for R.C.C. box, Approach slab & Retaing
Wing wall as per drawings including centering
huttering, scaffolding where necessary, laying
vibrating, curing and finishing complete.
6 Providing and laying Stone Pitching on slopes laid over 317.00 Cu.m. 1051.41
prepared filter media including boulder apron laid dry in
front of toe of embankment complete as per drawing
and Technical specifications
7 Providing and laying rubble for apron (each stone 1910.80 Cu.m. 1041.05
weighing not less than 40 Kg.) including hand packing
and filling in the interstices with quarry spall.
8 Providing & laying weep hole in Abutments, and returns 1034.00 Each 84.95
by using P.V.C pipe of 100mm including laying in
proper grade and jointing the completed as per detailed
9 Providing and fixing in position CRS Fe-550D TMT bar 108.54 M.T. 77073.50
reinforcement including cutting, bending, hooking,
tying and welding complete and including forming the
cage and lowering it in position.
BILL OF QUANTITIES
Item Description of Item (with brief specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) figures
10 Reinforced Cement Concrete Crash Barrier (Provision of 386.00 Rmt 5056.57
an Reinforced cement concrete crash barrier at the
edges of the road, approaches to bridge structures and
medians, constructed with M-40 grade concrete with
CRS Fe- 550D TMT reinforcement conforming to IRC:21
expansion joints filled with pre-moulded asphalt filler
board, keyed to the structure on which it is built and
installed as per design given in the enclosure to MOST
circular No. RW/NH - 33022/1/94-DO III dated 24 June
1994 as per dimensions in the approved drawing and at
locations directed by the Engineer, all as specified).
11 Providing G.I. 100 mm. diameter water spouts 72.00 Each 536.03
including necessary iron gratings as per drawings.
12 Providing and laying Filter Media 600mm Thick directed 2786.77 Sq.m. 1248.74
at the back of Abutment, return and wing walls as per
detailed specification.
13 Filling available excavated earth/wethered rock in 481.75 Cu.m. 130.39
trenches,sides of foundations etc. in layers not
exceeding 20 cm in depth consolidating each disposited
layer by ramming and watering.
14 Drilling with core cutting machine / Drilling machine 928.00 NO. 288.86
plus cleaning & fixing, 16mm Anchor Bar using
Chemical per anchor including all the arrangements and
measures for installing Anchor bar safely at site as per
details specified in the drawing .
Note: The pull out test at all location shall be done by
concern agency as per selected location of
client/Engineer incharge.No extra payment shall be
15 Earthwork for embankment including breaking 175.00 Cu.m. 176.97
clods,dressing with all lead and lift (excluding watering
and consolidation)(A) From Borrow pits within land
16 Supplying and fixing reinforced concrete heavy duty 553.75 Rmt 6595.90
non- pressure pipes with collars for culverts including
setting and joining the pipes in C.M. 1:2 watering and
laying (To level of slopes of I.S. 458 I 1971 Class NP4
casted by vertically vibrated technology of following
internal diameter. 1200mm dia.
BILL OF QUANTITIES
Item Description of Item (with brief specification and Rate In
Quantity Unit Amount
No. reference to book of specifications) figures
Four Crores Fifteen Lacs Four Thousand one Hundred Fifty Three & Thirty Six Only.
I/We am/are willing to carry out the work at ….................................…% above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note 1:-The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Note 2-The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3-GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4-In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Note 5:-An amount of Rs. 1,96,463.00 ( Rs. One lakh Ninty Six Thousand Four Hundred Sixty Three Only ) towards estimated credit
value of dismentaling shall be recovered from the R.A. Bill of this work irrespective of the quantity actually received on site.
Deputy Executive Engineer Divisional Account Executive Engineer
Valsad (R & B) Sub Division Panchayat(R&B)Division Panchayat (R & B) Division
Valsad Valsad Valsad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Notice inviting Tender.pdf
9.0GRs - SBD with Index-compressed (1).pdf
BOQ.pdf
SBD.pdf
Spe. Conditions -.pdf
SPE.INDEX.pdf
specification.pdf
TST SCH.pdf
BOX CULVERT - (RECONSTRUCTION)-DATA SHEET.pdf
BOX CULVERT - (RECONSTRUCTION)-Model.pdf
BOX CULVERT-WIDENING.pdf
BOX CULVERT-WIDENING-DATA SHEET.pdf
DETAIL OF ANCHOR BAR-Model.pdf
RETAINING WALL-Model.pdf
TYPICAL DRAWING DOUBLE ROW PIPE CULVERT NORMAL (RECONST)-DATA SHEET.pdf
TYPICAL DRAWING DOUBLE ROW PIPE CULVERT NORMAL (RECONST)-GAD.pdf
TYPICAL DRAWING double ROW PIPE CULVERT WIDENING-DATA SHEET.pdf
TYPICAL DRAWING double ROW PIPE CULVERT WIDENING-GAD.pdf
TYPICAL DRAWING SINGLE ROW PIPE CULVERT NORMAL (RECONST)-DATA SHEET.pdf
TYPICAL DRAWING SINGLE ROW PIPE CULVERT NORMAL (RECONST)-GAD.pdf
TYPICAL DRAWING SINGLE ROW PIPE CULVERT WIDENING-DATA SHEET.pdf
TYPICAL DRAWING SINGLE ROW PIPE CULVERT WIDENING-GAD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .