Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance | -3.60% | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
31 Mar 2026, 5:00 pmClosed
GM JAL
Sector-5, Noida
Strengthening of Sewerage (Construction of Sumpwell at DSC Road, Green Area, Village-Barolla), Noida.
2026_NOIDA_1130134_1
32/SM-JAL-III/2025-26
Open Tender
Civil Works - Others
180 days
NOIDA
Please refer to tender document
3 documents required · 3 mandatory
₹5,310
NOIDA
₹5.6 L
24 Apr 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
31 Mar 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Cutting road and making good the same i/c supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. | - | - | - | - | |
Bituminous portion. | - | Cum | - | - | |
Water wound macadam. | - | Cum | - | - | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of E/I. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | - | Cum | - | - | |
Earth work in excavation by mecanical means (hydraulic excavater)/ manual means in over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) i/c disposal of excavated earth, lead up to 50 m and lift up 1.5, disposed earth to be levelled and neatly dressed in all kind of soil.The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of E/I. | - | Cum | - | - | |
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | - | - | |
Extra for every additional lift of 1.5 or part thereof in all kind of soil. | - | - | - | - | |
1.50 - 3.00 m | - | Cum | - | - | |
3.00 - 4.50 m | - | Cum | - | - | |
4.50 - 6.00 m | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_2108263.xls
BOQ • 0.44 MB
TD.pdf
Tender Documents • 1.71 MB
C32.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid