| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC MOH BIRIYAGANJ TILHAR SHAHJAHANPUR UP | SHAHJAHANPUR | UTTAR PRADESH | 242001 | ₹7.5 Cr | L1 | Accepted-AOC Financial bid is Accepted at the price of Rs. 74551707.50 by the Employer |
| 2 | L2₹8.7 Cr+₹1.3 Cr (16.8%)Rejected-Finance GRAM SHEKHAPUR BADGAON DISTRICT GONDA | GONDA | UTTAR PRADESH | 271001 | ₹8.7 Cr+₹1.3 Cr (16.8%) | L2 | Rejected-Finance Due to L2 Rate |
Tender Value
Refer Docs
EMD Value
₹19.5 L
Closing Date
1 Mar 2024, 12:00 pmClosed
Superintending Engineer
SE STP Kheri PWD Sitapur
Strengthing of remaining part of Chandan Chowki Gauriphanta road (ODR) Ch.-6.300 to 8.640 and 20.340 to 23.570.
2024_CEUCZ_904644_1
413/352C/E.TEND/STP-LMP/23-24 Dt.23.01.2024
Open Tender
Civil Works
Item Rate
365 days
Lakhimpur Kheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹19.5 L
Yes
SE STP Kheri PWD Sitapur
10 Apr 2024
24 Feb 2024
1 Mar 2024
24 Feb 2024
1 Mar 2024
24 Feb 2024
26 Feb 2024
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. For Cartage earth 3 Km. Distance.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.For Cartage earth 3.00 Km. distance.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.
Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.As per S.I. no-4.1.8
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Brick Masonry Work in Cement Mortar 1:4 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Providing and Laying of interlocking concrete block pavements having thickness 80 mm as per drawing and technical Specifications.( 50%TATA RED 445/445 M-40 Grade)
Cement concrete with 2 cm gauge approved stone ballast, approved soars sand and cement in the proportion of 1:2:4 including supply of all material, labour and T & P etc, required for proper competion of the work.as per S.I no-4.2.3
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Providing and laying of weephole in brick massonary in abutment and wing wall with 100mm dia PVC pipe extending through the full width of the structuer with slope of 1v:20 H towarddrawing force complete as per drawing and technical specification (MORTH &H-13.8/2706&2200)
Providing and laying reinforced cement concrete in super structure as per drawing and technical specifications clause 800, 1205.4 and 1205.5 (M-25)
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Supply & laying 600 mm. Dia NP3 R.C.C. Hume Pipe
Boring with 100 mm dia casing pipe for dewatering including cost of pipes , other materials, labour charges etc. complete.
Dewatering of water if necessary at the time of excavation, concreting, massonary work upto sub soil water level including hire charges of 5HP Pump.
M/S CHANDRA MAULI MISHRA CONTRECTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .