| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC FINANCIAL BID ACCEPTED | |
| 2 | L2₹8.7 L+₹12,365 (1.43%)Rejected-AOC | L2 | Rejected-AOC FINANCIAL BID ACCEPTED | |
| 3 | L3₹9.3 L+₹71,682 (8.31%)Rejected-AOC | L3 | Rejected-AOC FINANCIAL BID ACCEPTED | |
| 4 | L4₹9.9 L+₹1.3 L (14.8%)Rejected-AOC | L4 | Rejected-AOC FINANCIAL BID ACCEPTED | |
| 5 | L5₹10.1 L+₹1.5 L (17.7%)Rejected-AOC VINOD VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | L5 | Rejected-AOC FINANCIAL BID ACCEPTED |
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
14 Aug 2020, 10:00 amClosed
EXECUTIVE ENGINEER
EE MGCCD4 AMROHA
CONSTRUCTION OF V.R.B AT KM 0.350 OF TARARA MINOR MADHYA GANGA CANAL PROJECT STAGE-II IN DIST - AMROHA LOT 06
2020_UPIDC_499346_1
01/EE/20-21 LOT 06
Open Tender
Civil Works - Canal
Item Rate
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
EEMGCCD4
₹34,000
26 Oct 2020
8 Aug 2020
14 Aug 2020
8 Aug 2020
14 Aug 2020
8 Aug 2020
Amount
cutting of existing metalled road as per requirement and disposal of dismantled material upto any lead or as directed by Engineer-in-Charge for proper complition of work including of all labour T&P etc.
Earthwork in foundation in all type of soil including all lead & lift as required and also including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying of C.C M-10 A-40 (1:3:6) in foundation of abutment and wing walls including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying of C.C M-7.5 A-40 (1:4:8) in between abutment and wing walls traingilar portion including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Ist class Brick work Cement, Corase 1:4 Sand mortar in abutment, wing walls and parapets etc. including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Struck pointing 1:2 Cement corase sand mortar on all open surface of brick masonary work including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing Centring & shuttering for bridge slab, bed block, dirt wall or in foundation etc. for cement concrete work in foundatio
RCC M-20 A20 (1:1.5:3) in slab including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
RCC M-25 A20 (1:1:2) in bed block, dirt wall etc. including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S/L of two coat tarfelt painting as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Fixing 20mm thick expenssion joint with bitumen stone dust & corase sand including angle iron on both side including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Filling of local sand as back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P/F of 75 mm dia PVC pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P / Fixing year plate including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
P/F of BM plate including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S/Fixing wheel guard stone size (150mmx150mmx1500mm) including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
E/W for making approaches and diverson of VRB including all lead lift compaction dressing including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
S/L RBM on diverson / Approaches of VRB including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
M/S Vishnu Raghav Construction
SAKSHAM POWER CONSTRUCTION
Amarpal singh
SUNIL KUMAR CONTRACTOR
Gaurav Kumar Agarwal Contractor
Unique Project
M/s Jitendra Yadav Contractor
S K CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .