Tender Value
₹32.8 L
EMD Value
₹66,000
Closing Date
20 May 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
EE RED SECOND FLOOR VIKAS BHAWAN BAREILLY
In Mo. Jawahar Nagar, construction of CC road and drain from R.K. Rupanwal s house to J. Construction of a CC road and drain from Anil Patwa s house to Vaishnavi Beauty Parlor in Shriram Vihar Colony (BLOCK-City Area).
2026_REDUP_1145537_1
25/10/EE/RED/NIVIDA/2026-27 DATE 01-04-2026
Open Tender
Civil Works
180 days
NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹66,000
4 Jun 2026
5 May 2026
20 May 2026
5 May 2026
20 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - | - |
| 1 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 71.86 | cum | 198.55 | ₹14,267.8 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 |
| 2 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 26.13 | cum | 3,519.75 | ₹91,971.07 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. |
| 3 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 52.76 | cum | 5,225 | ₹2,75,671 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) |
| 4 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 4 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 281.4 | Sqm | 206.15 | ₹58,010.61 | Supply & Laying of Polythene sheet 125 Micron for separation layer Including all Material, Labour T&P ……..Complete . |
| 5 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 9.55 | CUM | 7,441.35 | ₹71,064.89 | Making contraction joint in C.C. Road 0.80 kg maxphalt , 0.01 kg cement & 0.0025 m³ coarse sand Complete as per directed by E/I (senctioned by S.E. Bareilly). |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 155.55 | cum | 2,950.99 | ₹4,59,026.49 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405. | 116.66 | cum | 3,844.56 | ₹4,48,506.37 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 8 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed amd plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of concrete slabs for 14- days, using curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 (Excluding dowel bars & others) Clause 1501 | 233.32 | cum | 7,307.78 | ₹17,05,051.23 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.. As per S.I. No. 283 A. | 0.84 | cum | 8,436.95 | ₹7,087.04 | R.C.C. Work with cement approved coarse sand and 2cm. Gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and necessary centering and shuttering etc. and also inculding supply of all Material, Labour and T & P etc. required for proper completion of the work. As per S.I. No. 283. |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
10T1.pdf
Tender Documents • 1.66 MB
BOQ_2141450.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid