Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.4 L+₹45,974.90 (2.43%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹21.7 L
EMD Value
₹50,000
Closing Date
15 Feb 2024, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD ROADS DIVISION Kalpetta
GENERAL RM 2023 24 Cluster II One year RC Zone II phase I For four road of 16.390 km under PWD roads section Panamaram One year RC 2 Phase 1 Zone II For four road of 16.390 km under PWD roads section Panamaram General Civil Work
2024_PWD_656165_1
PWD/RB/TR/11937/2023_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Panamaram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
8 Apr 2024
8 Feb 2024
17 Feb 2024
8 Feb 2024
15 Feb 2024
8 Feb 2024
Amount
Appendix-A : Initial Rectification Works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD68374/2023-2024:Hiring hydraulic excavator 1 cum bucket capacity to remove accumulated earth and rock materials from the road as per the direction of Engineer in charge
OD68376/2023-2024:Engaging Tipper for conveying the removed materials loading and unloading etc complete.
OD68378/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD
Appendix-B : Premonsoon Works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD68381/2023-2024:Engaging Mazdoor for clearing chocked culvert and drains,for loading and unloading of various materials at site,removing thick thorny bushes etc complete as per the direction of departmental officers at site.
OD215377/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.
OD68383/2023-2024:Hire charges for tractor trolley for disposing various materials from site etc. complete.
3.24.A:Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
Appendix-C : Preventive Maintenance Works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD68384/2023-2024:Mix seal surfacing: Providing laying and rolling of close graded premix surfacing material of 13.2 mm to 0.9 mm aggregate using penetration grade bitumen to required lines grade and prepared base including mixing in a suitable plant laying and rolling with a three wheel 8 to 10 KN static roller and finishing to required level and grade as per technical specification clause 509 of MORD
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
OD68397/2023-2024:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days throughout the agreement period of the running contract as directed by the departmental officer at site.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
Appendix-D : Emergency Works
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
OD215385/2023-2024:Engaging wood cutter for removing dangerous trees and branches etc complete as per the direction of deparmental officers at site.
OD68407/2023-2024:Engaging Mazdoor for various works
P A Moidutty
Bidder Name
k v john
P A Moidutty
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1013092.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .