Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LQualified 8 A I R LANE NEAR COMMUNITY HALL DELANIPUR PORT BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | ₹8.0 L | L1 | Qualified MSE, Category: OBC |
| 2 | L2₹10.0 L+₹2.0 L (24.5%)Qualified SEA SHORE ROAD HADDO HADDO SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | ₹10.0 L+₹2.0 L (24.5%) | L2 | Qualified MSE, Category: General |
| 3 | L3₹10.6 L+₹2.6 L (32.8%)Qualified | ₹10.6 L+₹2.6 L (32.8%) | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
29 Mar 2025, 5:00 pmClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC546; HA1001 Lift up the Craft on cradle Craft pulled upon slipway for carrying out under water work package and making sure that bearing surfaces are adequately cushio..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC546; HA1002 Immediately after docking clean the marine growth with wooden scraper Carry out cleaning with emery paper and fresh water hydro jet washing of complete und..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC546; HA1003 i Carry out Surface preparation and painting of entire under water hull including all appendages Remove clean and paint all under water gratings Examine pl..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC546; HB1014 02 in Nos Boat cradle corroded deteriorated at Various places Same to be replaced as per sample Scope of jobs are as follows a Cradle to be painted with na..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EA3002 Following jobs to be carried out in steering system MatSpares yard supply a Renew all flexible hoses b Renew glands 02 in Nos of Rudders c Renew flexible ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - HC546; EA3012 The following under water valves to be overhaul and pressure tested up to 5 Kg a ME Sea chest valves 02 Nos SDNR 80 MM b ME sea chest interconnecting valve..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EB3014During SME Vibration analysis test carried out by Ms Roshni ship repairers Port Blair It was observed that SME vibration was excessive The SME vibration ana..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EB3015 Following machineriesEquipment to be carried out during pre refit and post refit Vibration measurement are to be taken on the equipment bearing points in t..
7660397
GEM/2025/B/6070262
Two Packet Bid
Repair
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
5 documents required · 5 mandatory
1 yrs
₹3
Exempted
20 Mar 2025
20 Mar 2025
29 Mar 2025
and Installation of Plant Systems/Equipments (Version 2) - HC546; HA1001 Lift up the Craft on cradle Craft pulled upon slipway for carrying out under water work package and making sure that bearing surfaces are adequately cushio..
and Installation of Plant/Systems/Equipments (Version 2) - HC546; HA1002 Immediately after docking clean the marine growth with wooden scraper Carry out cleaning with emery paper and fresh water hydro jet washing of complete und..
and Installation of Plant/Systems/Equipments (Version 2) - HC546; HA1003 i Carry out Surface preparation and painting of entire under water hull including all appendages Remove clean and paint all under water gratings Examine pl..
and Installation of Plant Systems/Equipments (Version 2) - HC546; HB1014 02 in Nos Boat cradle corroded deteriorated at Various places Same to be replaced as per sample Scope of jobs are as follows a Cradle to be painted with na..
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EA3002 Following jobs to be carried out in steering system MatSpares yard supply a Renew all flexible hoses b Renew glands 02 in Nos of Rudders c Renew flexible ..
and Installation of Plant Systems/Equipments (Version 2) - HC546; EA3012 The following under water valves to be overhaul and pressure tested up to 5 Kg a ME Sea chest valves 02 Nos SDNR 80 MM b ME sea chest interconnecting valve..
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EB3014During SME Vibration analysis test carried out by Ms Roshni ship repairers Port Blair It was observed that SME vibration was excessive The SME vibration ana..
and Installation of Plant/Systems/Equipments (Version 2) - HC546; EB3015 Following machineriesEquipment to be carried out during pre refit and post refit Vibration measurement are to be taken on the equipment bearing points in t..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7660397.pdf
GEM_BID
1742381423.pdf
OTHER
1742381430.pdf
OTHER
atc_3f6a4927-ece0-4717-a1221742381547844_DTO14.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .