| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC 101 1 10 68 4 PLOT NO 52 SRINIVASA NILAYAM CHIKOTI GARDENS BEGUMPET HYDERABAD TELANGANA 500016 | MEDCHAL MALKAJGIRI | TELANGANA | 500016 | ₹3.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.7 Cr+₹13.5 L (3.81%)Rejected-Finance DELHI DELHI 110015 | WEST DELHI | DELHI | 110015 | ₹3.7 Cr+₹13.5 L (3.81%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.9 Cr+₹35.3 L (9.97%)Rejected-Finance 2277 RAJA PARK RANI BAGH RANI BAGH NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹3.9 Cr+₹35.3 L (9.97%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Finance J 219 LANE W 15 WESTERN AVENUE SAINIK FARMS NEW DELHI | - | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹3.5 Cr
EMD Value
₹1 L
Closing Date
24 Feb 2024, 5:00 pmClosed
Chairman and Managing Director KPHCC
KERALA POLICE HOUSING AND CONSTRUCTION CORPORATION LTD CHANDRASEKHARAN NAIR STADIUM, PALAYAM, THIRUVANANTHAPURAM - 695033
CONSTRUCTION OF SYNTHETIC TRACK CUM FOOTBALL GROUND KANNUR CITY (PHASE_1) (DSR 2018)
2024_KPHCC_658285_1
NIT NO 232/KPHCC/2023-24
Open Tender
Civil Works - Buildings
Item Rate
210 days
KANNUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹8,850
₹1 L
22 Mar 2024
14 Feb 2024
26 Feb 2024
14 Feb 2024
24 Feb 2024
14 Feb 2024
Amount
SUB-GRADE PREPARATION AND KERB
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>
3.19.1 : Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction.
od29184/2023_2024 : SKF_ODMORTH 1/2022-2023 Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed and placed in foundation
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
SUB-BASE PREPARATION FOR SYNTHETIC TRACK AND D-AREA
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b : Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.3.2.a : Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.<br> For Grading II - (19 mm nominal size)<br>
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a : Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grading - II (13.2 mm Nominal Size)<br>
SYNTHETIC TRACK AND JUMPING PIT
od29174/2023_2024 : Supplying and filling in landing area of long/triple jump with fine sand including<br>levelling, conveyance, labour charges etc according to IAAF specification and methodology complete.
od29175/2023_2024 : Providing ,Laying, spreading and compacting stone aggregate of specified size 20mm downgraded metal as filter media around the drainage pipes in the sides of trench without damaging the drainage pipes as per the directions of Engineer-in-charge. Rate inclusive of all materials,transportation and labour charges complete.The work has to be executed as per detailed specifications, and or as approved by Engineer-in charge.
od29177/2023_2024 : Providing and fixing PVC pipes with 5 mm dia perforations, minimum 125 perforations per running metre, in trenches at required slope, as per specifications etc complete including the cost of all materials, labour etc. and as directed by the Engineer-in-charge.Care should be taken while laying so that the perforations shall be along the bottom side of the pipe. The rate includes cost of all materials, covering the pipe with Geo Textile Cloth,labour charges for trenching carriage of surplus earth to a lead of 50m etc complete. including jointing of pipes with one step PVC solvent cement etc complete as per direction of Engineer-in-Charge 110 mm dia 6 Kgf/cm2.
od29180/2023_2024 : SKF_OD 5/2022-2023 Supply of full PUR , World Athletics ( former IAAF) approved Synthetic Track Surfacing system in accordance with World Athletics standard suitable for conducting World Athletics approved international Athletic events. Total thickness of the synthetic track surfacing system shall be 14 to 15mm comprising 9.4 to 10.0 mm force reduction layer comprising 4.7mm Bottom Layer made with Black SBR granules embedded in PUR coating ,4.7mm Middle Layer(s): Black SBR granules embedded in PUR coating and final resilient wearing layer of granular texture, red-brown. Full PUR coating with EPDM granules embedded 5.0 mm. In high stress areas thickness should be as per World Athletics requirement. Laying and installation according to World Athletics specifications and approved methodology and drawings including provisions of installation of sleeves for throwing events, inlay equipment for pole vault, long & triple jump and steeple chase. This rate also include lane marking.
50.18.9.9.1 : Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of Joints complete as per direction of engineer in charge.110 mm dia 6Kgf/cm2
shiv naresh sports pvt ltd
ADVANCED SPORT TECHNOLOGIES LLP
Bidder Name
shiv naresh sports pvt ltd
Great SportsTech Limited
ADVANCED SPORT TECHNOLOGIES LLP
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .