Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Finance | -0.03% | ₹4.6 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 LAdmitted-Finance | +2.00% | ₹4.7 L | L2 | Admitted-Finance |
| 3 | L3₹4.7 LAdmitted-Finance | +3.10% | ₹4.7 L | L3 | Admitted-Finance |
Tender Value
₹4.6 L
EMD Value
₹10,000
Closing Date
2 Mar 2026, 1:00 pmClosed
EE/IGWTP
OFFICE OF THE EE/IGWTP, MONIRAMPORE, BARRACKPORE
MAINTENANCE THE JETTY STRUCTURE BY CLEANING OF WATER HYACINTHS AND OTHER FLOATING BODIES ALONG WITH UPLIFTMENT OF THE AIR PURGING AREA ATTACHED WITH THE SUCTION LINES OF NEW PALTA RAW WATER PUMPING STATION,IGWTP.
2026_KMC_1008654_1
KMC/IGWTP/159/25-26, DT-12/02/2026
Open Tender
CIVIL WORKS
240 days
IGWTP/KMC
AS PER NIET
4 documents required · 4 mandatory
₹0
₹10,000
IGWTP/KMC
14 May 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
2 Mar 2026
24 Feb 2026
21 Feb 2026
CUTTING, CLEANING & REMOVING OF THE WATER HYACINTH, DEAD BODIES & OTHER FLOATING PARTICLES ETC FROM THE RIVER ACCUMULATED BENEATH THE INTAKE PUMPING STATION JETTY OF IGWTP AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.ESTIMATE PURPOSE RATES APPROVED BY DG(W/S) ON 21.05.2018
BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 19) Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar (a) 20 mm thick plaster
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface : With other than hi-gloss of approved quality-(iv) Two coats (with any shade except white)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
techbid.pdf
Tender Documents • 1.33 MB
BOQ_2475815.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid