Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
12 Jun 2026, 2:00 pm5d left
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
Addl. Chief Engineer cum CHD Irrigation, BTC Kokrajhar
Construction of Dhansiri Project Division and Sub-Division Office building under Dhansiri CAD Project
2026_ID_52562_1
ACE/CHDI/10/2025/24 dated 27/05/2026
Open Tender
Civil Works
180 days
Udalguri
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,300
₹5.2 L
Yes
30 May 2026
30 May 2026
12 Jun 2026
30 May 2026
12 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of Dhansiri Project Division Office Building-Civil Part (As per Sub-estimate A1)
CIVIL WORKS
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. | 186.84 | Cum | 693.77 | ₹1,29,623.99 | 1 |
| 2 | River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified. | 191.56 | Cum | 2,210.47 | ₹4,23,437.63 | 2 |
| 3 | Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing. | 556.78 | Sqm | 802.2 | ₹4,46,648.92 | 3 |
| 4 | (A) P.C.C. (With hard broken stone aggregate 6 mm to 20 mm
(iii) CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). | 10.48 | Cum | 11,098.41 | ₹1,16,311.34 | 4 |
| 5 | (A) C.C. (With hard broken stone aggregate 6 mm to 20 mm
(iii) CC work in proportion 1:1½:3 with hard broken river stone aggregate from river boulder of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 173.74 | Cum | 11,123.15 | ₹19,32,536.08 | 5 |
| 6 | Centering and shuttering including propping etc where necessary and removal of forms after completion of C.C. and RCC works complete as directed. (Measurement to be taken on the face area timbered). | 523.21 | Sqm | 369.38 | ₹1,93,263.31 | 6 |
| 7 | Centering and shuttering including propping etc where necessary and removal of forms after completion of C.C. and RCC works complete as directed. (Measurement to be taken on the face area timbered).
(i) Shuttering (Beam) without prop | 464.66 | Sqm | 220.95 | ₹1,02,666.63 | 7 |
| 8 | Centering and shuttering including propping etc where necessary and removal of forms after completion of C.C. and RCC works complete as directed. (Measurement to be taken on the face area timbered). | 373.48 | Sqm | 543.35 | ₹2,02,930.36 | 8 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 21,311.1 | Kg | 107.85 | ₹22,98,402.14 | 9 |
| 10 | 1st class brick work in cement mortar in abutment and wing wall, parapet wall etc, including racking out joints and curing etc, complete as directed. | 83.26 | Cum | 13,321.8 | ₹11,09,173.07 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
SBD.pdf
Tender Documents • 1.83 MB
BOQ_83046.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid