Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance V P O MAJRA PAONTA SAHIB DISTT SIRMOUR HP | ₹1.6 L | L1 | Accepted-Finance Due to L1 |
| 2 | L2₹1.7 LRejected-Finance NOT SPECIFIED | ₹1.7 L | L2 | Rejected-Finance Due to L2 |
| 3 | L2₹1.7 LRejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | ₹1.7 L | L2 | Rejected-Finance Due to L2 |
Tender Value
₹1.6 L
EMD Value
₹1,573
Closing Date
16 Apr 2026, 11:00 amClosed
Sr. Executive Engineer ED HPSEBL Nahan
Sr. Executive Engineer ED HPSEBL Nahan
E-Tender for pre-monsoon maintenance of prior to the rainy season of 33 KV, 11 kV HT LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles Electrical Section Burma-Papri
2026_HPSEB_133757_1
NED-04/2026-27
Open Tender
Electrical Works
90 days
Kala Amb
A Class Electrical License
3 documents required · 3 mandatory
₹590
₹1,573
23 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
16 Apr 2026
9 Apr 2026
9 Apr 2026 - 13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1E-Tender for pre-monsoon maintenance of prior to the rainy season of 11 kV HT & LT lines, including cutting/looping of tree branches, bush cutting, stay tightening, strengthening/straightening of poles, conductor sagging, tightening, jumpering, etc., complete in all respects, to ensure smooth power supply in Electrical Section Suketi under ESD Kala Amb. | ||||||
| 1.01 | Tender for pre-monsoon maintenance of 33 KV, 11 kV HT and LT lines by carrying out cutting and looping of tree branches, bush cutting, and general line maintenance prior to the rainy season. The scope of work includes stay tightening, jumpering, conductor sag correction, straightening of poles, and all other allied works required to ensure proper functioning of the electrical network. The work shall be executed by providing a maintenance gang comprising 95 man-days to ensure smooth and uninterrupted power supply to the consumers in Electrical Section Burma-Papri under Electrical Sub-Division (ESD) Kala Amb. All works shall be carried out under the supervision of HPSEBL line staff. The contractor/firm shall arrange all necessary T&P (Tools & Plants), including transportation (vehicle), at their own cost, and execute the work to the satisfaction of the Engineer-in-Charge. (Item wise detail attached in tender document as per Annexure "A") | - | Job | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_197753.xls
BOQ • 0.30 MB
SBD.rar
Tender Documents • 8.78 MB
Download all tender documents and submit your bid