Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-Finance | 1 | Accepted-Finance OK | |
| 2 | 2₹4.3 L+₹10,250 (2.42%)Accepted-Finance | 2 | Accepted-Finance OK | |
| 3 | 3₹4.4 L+₹21,500 (5.09%)Accepted-Finance 67D EXECUTIVE PO IZZAT NAGAR SUNCITY VISTAR BAREILLY UTTAR PRADESH 243122 | BAREILLY | UTTAR PRADESH | 243122 | 3 | Accepted-Finance OK |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
4 Feb 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E., E.T.C., Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Pilfer Proofing Metering of 132KV Budaun TSS Bay alongwith other associated works at 220KV Substation Budaun under E.T.D., Budaun
2021_UPTCL_546256_1
E-Tender No. 48/W/ETC(B)/ 2020-21
Open Tender
Electrical Works
Item Wise
45 days
Budaun
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹5,000
15 Sept 2021
16 Jan 2021
5 Feb 2021
16 Jan 2021
4 Feb 2021
16 Jan 2021
16 Jan 2021 - 4 Feb 2021
120 days
Amount
Following Works are Required to be carried out for Pilfer Proof metering of 132KV Budaun TSS Feeder Bay at 220KV Substation Budaun under ETD, Budaun with all Cost of Men, Materials, Misc. Consumables, T&Ps for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer, as per details below :
Providing & Laying of following sizes G.I. Pipes from CT/PT Junction Boxes in switchyard to metering cubicle box in control room. Laying of control cable through G.I. Pipe as per cable schedule on cable rack along the wall of cable trenches as per site requirement alongwith associated work such as Cutting, making Threads for fitting Socket, Elbow & dressing etc. Determination of all internal connections at each equipment, laying of Control Cables in G.I. Pipes and its Re-termination including all internal connection at each equipment including correct Ferruling as per drawing on each core of cable. Control cable will be fully covered by G.I. Pipe up to termination point at both ends. All required material (G.I. Pipe, Socket, Bands, Nipples & T-joints), labour, electrician, etc. will be arranged by the contractor himself at his own cost.
Pilfer Proofing by using 21/2 " Dia Pipe.
Pilfer Proofing by using 1 " Dia Pipe.
SHRI BALAJI ENGG. WORKS
EMC Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .