Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹6.4 L (4.59%)Admitted-Finance | ₹1.5 Cr+₹6.4 L (4.59%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Applicant not fulfill the eligibility criteria |
| Sl No | Description | Qty | Unit | Parksons Engineering Company Pvt Ltd L2 | CHOUDHARY ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Material and labour for Preventive and comprehensive maintenance including servicing of central AC chiller Plant of 03 Nos of 180 TR capacity each unit (screw type chiller compressor unit complete of make Carrier Model No 30 KA0700A Qty -03 Nos). The work shall be carried out through OEM (M/s Carrier) / Authorised channel Partner of Carrier. Chiller plants and equipments by checking the functioning of chiller unit, compressor, condensers, control panels, sensors, entire spare parts associated with chillers unit. Preventive maintenance of chiller comprising replenishing of refrigrant gas R134a and compressor oil leakage arresting in the system replacement of all defective parts as per site requirement and technical functional point of view of plant. Servicing/ descaling / cleaning of chiller evaporator oils, pre filters etc as per site requirement and OEM technical mannual instructions. Material & labour (incl T&P) and replacing of any unserviceable spare parts as and when required related to compressors thermostal, cut outs, micro processor unit control panel, control boards transducers of packed unit, chiller condensing unit, eavaporators expansion valves, Air cooled condencers, oil and refrigerant pipe lines, oil and refrigerant filters, solanaide, automatic control valves etc complete installed items as per existing quantities for above mentioned mooels of make Carrier with the followings complete all as specified and directed by Engr-in-Charge. | 4 | Each Qtr | 8,61,978 ₹34,47,912 | 4,74,000 ₹18,96,000 Lowest |
| 1.01(a) Chiller unit Model No 30KA0700A-03 Nos of 180 TR capacity each make Carrier Note (i) The unit rates quoted by contractor shall be included M&L for servicing replacement of defective parts, calibration of temperature realative humidity sensors of chiller plants. (ii) The certificate of testing & checking of plants shall be produced every quarterly after physical servicing of plant carried out by OEM x 04 times in a year. (iii) For the purpose of payment Comprehensive/ Preventive maintenance including servicing all the 03 Nos chiller plant on one occassion (quarterly basis) shall be counted as one job. (iv) The time interval between two servicing will be intimated by Engineer-in-charge as per requirement. (v) The complete report wrt each Comprehensive/ Preventive maintenance shall be submitted to Engineer-in-charge before payment. (vi) Comprehensive, preventive maintenance includes spare parts such as Solonoide valves, HP/LP cut outs swithces, Liquid line core dyrers, Oil seprationn dryers, compressor oil, Refrigerant 134a, (PCB) mother board, supply board, fan cards, Heater relay board, contractors, relays Fuzes, Connectors conntrol panels with wiring, Pressure guages, Pressure switches, Waer flow switches, leakage arresting of an oil any refrigerant etc. Any spare parts other than specified but reqd technically for functional point of view of chiller plant the same shall be provided by the contractor without any extra cost. (viii) The comprehensive maintenance does not include the items such as replacement of complete unit of screw type chiller compressor, Fan assembly, AHU's, Pumps etc. (viii) The unit rates demed to be included of necessary T&P reqd for comprehensive maintenance and taxes & cost of spare parts etc, visit charges of OEM rep complete all as specified and directed by Engr-in-Charge. | |||||
| 1.02(b) The work shall be carried out by authorized chanel Partner of OEM and service report of work carried by OEM to be submitted after every visit. (c) Checking and leakage, arresting of oil & gas including with Oil and refregerant (R134A) as per site requirement as and when required. (d) Checking the central AC plant or Refrigeration system and equipment such as compressors and its electrical controls on the respective equipments etc. (e) Lubrication of all necessary points in the system & its components in line as per reqmt. (f) Changing of spare parts as specified and technically reqd (not whole units) such as chiller screw compressor, control panel, Fan assembly, Pumps, AHU's) but repairing/ rewinding or re-calibration of items shall be carried out as per site reqmt. (g) Checking & servicing of plant shall be carried out - 4 times in ayear on quarterly basis in contract period. (h) Oil & lubrication shall be carried out as per schedule or site requirement. (j) Attending to breakdown/ faults/ defects in the AC Plant system by registering the complaints verbally/ teleponically/ via email/ or any other mode of communication with 24 hrs Any break down, any nos of time within a contract period shall be attended by rep of OEM within 24 hrs and cost of same deemed to be included in the quoated rate. (k) Rs 10000/- (Rupees Ten thousands) shall be recovered for not attending the defects/ faults/ breakdown of AC Plant within 24 hrs from lodging the complainnts by telephonically/email/verbally/letter etc. Thereafterr Rs 10000/- will be added for every subsequent 24 Hrs period till rectification of defects and making the plant functional or submission of report/ reason of defects of the plant. (l) M&L for one coat of painting with syntheitic enamel paint after rubbing of existing syrface and applying one soat of primer inside and outside complete of iron surface of channel/ iron parts of Chiller Units (03 Nos). (m) The rectification cost if any at the time of taking over the Chiller plant BY Vendor/ OEM is deemed to be included in tem rate. | |||||
| 2.00Material and labour for Preventive and comprehensive maintenance including servicing of AHU's/CSU's of make ; Edgetech, including servicing/ cleaning of pre filter/ fine filter pads completely by removing from AHU's/ CSU's and making dust free by air pressure/watering, drying and refixing the same to its position including checking and serviceabilit of dehumidifier, fan belt, tightness, servicing of blower motor complete, Servicing shall be carried out quterly bases or 4 times in a year complete all as specified & directed by Engineer-in-charge for the following items:- Note : The following work are included in the preventive maintenance:- (i) Servicing of cooling coils and air filter of AHU's/CSU's with air blower, water and cleaning agent, cleaning of cooling coil with wire brush/ chemical suitable for aluminium fins, cleaning of bottom tray, drain pipe complete (4 time in ayear or contract period). (ii) The time interval between two servicing will be intimated by Engineer-in-charge as per requirement. (iii) The complete report wrt each Comprehennsive/ Preventive maintenance shall be submitted to Enginneer-in-charge before payment. (iv) One coat of painting with synthetic enamel paint after rubbing of existing surface and applying one coat of primer inside and outside complete. (once in a contract period for rusted iron surface) as directed by Engr-in-charge. (v) Cleaning/ replacement of U/S Valves of any size. (vi) Cleaninng/ replacement of U/S of Y-Stainers. (vii) Checking & repairing of control panel wiring if reqd. (viii) Checking & replacement of contractors, relay, MCB/MCCB's of any size, VFD etc complete all as per site reqmt. (ix) All other necessary parts which are not specified but reqd to rn the AHU/CSU's and cost of spare parts/ items incl T&P are deemed to be included in the quoted rates. (x) The rectification cost if any at the time of taking over the Chiller plant by Vendor/ OEM is deemed to be included in quoted rate. | |||||
| 2.01 | Building No1 , No2 & No3 - (24 Nos CSU's in each bldgs = 72 Nos CSU's) of capacity 3 TR, 1200CFM, 1 HP Motor complete all as specified and directed by Engr-in-Charge.
MAKE EDGETECH MODEL ETU-012C
Note:- For the purpose of payment Preventive maintenance including servicing of all the 72 Nos CSU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 2,97,000 ₹11,88,000 Lowest | 7,16,000 ₹28,64,000 |
| 2.02 | Building No 4 - (A & B) = 04 Nos AHU's each of capacity 25 TR, 8000 CFM (7.5 HP blower motor) complete all as specified and directed by Engr-in-Charge
Make EDGETECH Model ETU-080H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 04 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 1,98,000 ₹7,92,000 | 1,03,000 ₹4,12,000 Lowest |
| 2.03 | Building No 4 - (A & B) = 02 Nos AHU's each of capacity 15 TR, 5000 CFM (5 HP blower motor) complete all as specified and directed by Engr-in-Charge.
Make EDGETECH Model ETU-050H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 02 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 1,58,400 ₹6,33,600 | 48,000 ₹1,92,000 Lowest |
| 2.04 | Building No 5 = 02 Nos AHU's each of capacity 30 TR, 12000 CFM, 10 HP blower motor complete all as specified and directed by Engr-in-Charge.
Make EDGETECH Model ETU-120H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 02 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 99,000 ₹3,96,000 Lowest | 1,01,000 ₹4,04,000 |
| 3.00 | Material and labour for Preventive and Comprehensive maintenance including servicing of Make :- Emerald Airtech (India) Hot water generator (Total 3 Nos) of 90 KW capacity complete by opening the existing assembly and drain out complete water, cleaning the container, checking/ replacement of u/s heating element, pressure gauge etc and resembling the same and testing after servicing complete all as specified and as directed by Engr-in-Charge.
Note:- For the purpose of payment Preventive maintenance including servicing of all the 3 Nos Hot water Generator on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 79,200 ₹3,16,800 | 66,000 ₹2,64,000 Lowest |
| 4.00 | Material and labour for Preventive and Comprehensive maintenance including servicing of Make :- Emerald Airtech (India)Hot water generator generator (Total 4 Nos) of 45 KW capacity complete by opening the existingh assembly and drain out complete water, cleaning the container, checking/ replacement of u/s heating element, pressure gauge etc and resembling the same and testing after servicing complete all as specified and as directed by Engr-in-Charge.
Note:- For the purpose of payment Preventive maintenance including servicing of all the 04 Nos Hot water Generatore on each quarter, shall be counted as one unit job. | 4 | Each Qtr | 59,400 ₹2,37,600 | 39,500 ₹1,58,000 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
25 Aug 2026, 6:00 pmClosed
CWE (AF) BHISIANA
HQ CWE (AF) BHISIANA
COMPREHENSIVE MAINT OF VARIOUS EQUIPMENT AND AC PLANT AT TF AT AF STN HALWARA UNDER GE (AF) HALWARA
2026_MES_780432_1
CWE(BHI)/HAL-48/2026-27
Open Tender
Civil Works
Works
365 days
Halwara
As per tender documents
8 documents required · 8 mandatory
₹1,000
GE (AF) HALWARA
₹2.2 L
Yes
15 Sept 2026
23 Jul 2026
27 Aug 2026
23 Jul 2026
25 Aug 2026
13 Aug 2026
23 Jul 2026 - 30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for Preventive and comprehensive maintenance including servicing of central AC chiller Plant of 03 Nos of 180 TR capacity each unit (screw type chiller compressor unit complete of make Carrier Model No 30 KA0700A Qty -03 Nos). The work shall be carried out through OEM (M/s Carrier) / Authorised channel Partner of Carrier. Chiller plants and equipments by checking the functioning of chiller unit, compressor, condensers, control panels, sensors, entire spare parts associated with chillers unit. Preventive maintenance of chiller comprising replenishing of refrigrant gas R134a and compressor oil leakage arresting in the system replacement of all defective parts as per site requirement and technical functional point of view of plant. Servicing/ descaling / cleaning of chiller evaporator oils, pre filters etc as per site requirement and OEM technical mannual instructions. Material & labour (incl T&P) and replacing of any unserviceable spare parts as and when required related to compressors thermostal, cut outs, micro processor unit control panel, control boards transducers of packed unit, chiller condensing unit, eavaporators expansion valves, Air cooled condencers, oil and refrigerant pipe lines, oil and refrigerant filters, solanaide, automatic control valves etc complete installed items as per existing quantities for above mentioned mooels of make Carrier with the followings complete all as specified and directed by Engr-in-Charge. | 4 | Each Qtr | - | - |
| 1.01 | (a) Chiller unit Model No 30KA0700A-03 Nos of 180 TR capacity each make Carrier
Note (i) The unit rates quoted by contractor shall be included M&L for servicing replacement of defective parts, calibration of temperature realative humidity sensors of chiller plants.
(ii) The certificate of testing & checking of plants shall be produced every quarterly after physical servicing of plant carried out by OEM x 04 times in a year.
(iii) For the purpose of payment Comprehensive/ Preventive maintenance including servicing all the 03 Nos chiller plant on one occassion (quarterly basis) shall be counted as one job.
(iv) The time interval between two servicing will be intimated by Engineer-in-charge as per requirement.
(v) The complete report wrt each Comprehensive/ Preventive maintenance shall be submitted to Engineer-in-charge before payment.
(vi) Comprehensive, preventive maintenance includes spare parts such as Solonoide valves, HP/LP cut outs swithces, Liquid line core dyrers, Oil seprationn dryers, compressor oil, Refrigerant 134a, (PCB) mother board, supply board, fan cards, Heater relay board, contractors, relays Fuzes, Connectors conntrol panels with wiring, Pressure guages, Pressure switches, Waer flow switches, leakage arresting of an oil any refrigerant etc. Any spare parts other than specified but reqd technically for functional point of view of chiller plant the same shall be provided by the contractor without any extra cost.
(viii) The comprehensive maintenance does not include the items such as replacement of complete unit of screw type chiller compressor, Fan assembly, AHU's, Pumps etc.
(viii) The unit rates demed to be included of necessary T&P reqd for comprehensive maintenance and taxes & cost of spare parts etc, visit charges of OEM rep complete all as specified and directed by Engr-in-Charge. | - | - | - | - |
| 1.02 | (b) The work shall be carried out by authorized chanel Partner of OEM and service report of work carried by OEM to be submitted after every visit.
(c) Checking and leakage, arresting of oil & gas including with Oil and refregerant (R134A) as per site requirement as and when required.
(d) Checking the central AC plant or Refrigeration system and equipment such as compressors and its electrical controls on the respective equipments etc.
(e) Lubrication of all necessary points in the system & its components in line as per reqmt.
(f) Changing of spare parts as specified and technically reqd (not whole units) such as chiller screw compressor, control panel, Fan assembly, Pumps, AHU's) but repairing/ rewinding or re-calibration of items shall be carried out as per site reqmt.
(g) Checking & servicing of plant shall be carried out - 4 times in ayear on quarterly basis in contract period.
(h) Oil & lubrication shall be carried out as per schedule or site requirement.
(j) Attending to breakdown/ faults/ defects in the AC Plant system by registering the complaints verbally/ teleponically/ via email/ or any other mode of communication with 24 hrs Any break down, any nos of time within a contract period shall be attended by rep of OEM within 24 hrs and cost of same deemed to be included in the quoated rate.
(k) Rs 10000/- (Rupees Ten thousands) shall be recovered for not attending the defects/ faults/ breakdown of AC Plant within 24 hrs from lodging the complainnts by telephonically/email/verbally/letter etc. Thereafterr Rs 10000/- will be added for every subsequent 24 Hrs period till rectification of defects and making the plant functional or submission of report/ reason of defects of the plant.
(l) M&L for one coat of painting with syntheitic enamel paint after rubbing of existing syrface and applying one soat of primer inside and outside complete of iron surface of channel/ iron parts of Chiller Units (03 Nos).
(m) The rectification cost if any at the time of taking over the Chiller plant BY Vendor/ OEM is deemed to be included in tem rate. | - | - | - | - |
| 2Material and labour for Preventive and comprehensive maintenance including servicing of AHU's/CSU's of make ; Edgetech, including servicing/ cleaning of pre filter/ fine filter pads completely by removing from AHU's/ CSU's and making dust free by air pressure/watering, drying and refixing the same to its position including checking and serviceabilit of dehumidifier, fan belt, tightness, servicing of blower motor complete, Servicing shall be carried out quterly bases or 4 times in a year complete all as specified & directed by Engineer-in-charge for the following items:- Note : The following work are included in the preventive maintenance:- (i) Servicing of cooling coils and air filter of AHU's/CSU's with air blower, water and cleaning agent, cleaning of cooling coil with wire brush/ chemical suitable for aluminium fins, cleaning of bottom tray, drain pipe complete (4 time in ayear or contract period). (ii) The time interval between two servicing will be intimated by Engineer-in-charge as per requirement. (iii) The complete report wrt each Comprehennsive/ Preventive maintenance shall be submitted to Enginneer-in-charge before payment. (iv) One coat of painting with synthetic enamel paint after rubbing of existing surface and applying one coat of primer inside and outside complete. (once in a contract period for rusted iron surface) as directed by Engr-in-charge. (v) Cleaning/ replacement of U/S Valves of any size. (vi) Cleaninng/ replacement of U/S of Y-Stainers. (vii) Checking & repairing of control panel wiring if reqd. (viii) Checking & replacement of contractors, relay, MCB/MCCB's of any size, VFD etc complete all as per site reqmt. (ix) All other necessary parts which are not specified but reqd to rn the AHU/CSU's and cost of spare parts/ items incl T&P are deemed to be included in the quoted rates. (x) The rectification cost if any at the time of taking over the Chiller plant by Vendor/ OEM is deemed to be included in quoted rate. | |||||
| 2.01 | Building No1 , No2 & No3 - (24 Nos CSU's in each bldgs = 72 Nos CSU's) of capacity 3 TR, 1200CFM, 1 HP Motor complete all as specified and directed by Engr-in-Charge.
MAKE EDGETECH MODEL ETU-012C
Note:- For the purpose of payment Preventive maintenance including servicing of all the 72 Nos CSU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
| 2.02 | Building No 4 - (A & B) = 04 Nos AHU's each of capacity 25 TR, 8000 CFM (7.5 HP blower motor) complete all as specified and directed by Engr-in-Charge
Make EDGETECH Model ETU-080H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 04 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
| 2.03 | Building No 4 - (A & B) = 02 Nos AHU's each of capacity 15 TR, 5000 CFM (5 HP blower motor) complete all as specified and directed by Engr-in-Charge.
Make EDGETECH Model ETU-050H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 02 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
| 2.04 | Building No 5 = 02 Nos AHU's each of capacity 30 TR, 12000 CFM, 10 HP blower motor complete all as specified and directed by Engr-in-Charge.
Make EDGETECH Model ETU-120H-TB50
Note:- For the purpose of payment Preventive maintenance including servicing of all the 02 Nos AHU's on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
| 3 | Material and labour for Preventive and Comprehensive maintenance including servicing of Make :- Emerald Airtech (India) Hot water generator (Total 3 Nos) of 90 KW capacity complete by opening the existing assembly and drain out complete water, cleaning the container, checking/ replacement of u/s heating element, pressure gauge etc and resembling the same and testing after servicing complete all as specified and as directed by Engr-in-Charge.
Note:- For the purpose of payment Preventive maintenance including servicing of all the 3 Nos Hot water Generator on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
| 4 | Material and labour for Preventive and Comprehensive maintenance including servicing of Make :- Emerald Airtech (India)Hot water generator generator (Total 4 Nos) of 45 KW capacity complete by opening the existingh assembly and drain out complete water, cleaning the container, checking/ replacement of u/s heating element, pressure gauge etc and resembling the same and testing after servicing complete all as specified and as directed by Engr-in-Charge.
Note:- For the purpose of payment Preventive maintenance including servicing of all the 04 Nos Hot water Generatore on each quarter, shall be counted as one unit job. | 4 | Each Qtr | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_874194.xls
BOQ • 0.90 MB
TENDER48PRINT.pdf
Tender Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .