| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -0.20% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance | +3.00% | ₹6.1 L | L2 | Admitted-Finance |
| 3 | L3₹6.2 LAdmitted-Finance | +5.00% | ₹6.2 L | L3 | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹11,864
Closing Date
28 Jul 2026, 6:00 pmClosed
A.M.A. BALLIA
ZILA PANCHAYAT BALLIA
Gram Panchayat chhitauna mein Bhanu Singh ke ghar ke pass pokhare ke Ghat ka sundarikaran AVN returning walon ka karya
2026_UPPRD_1168289_12
329-ZPBA-2026-27Dte-06.07.26
Open Tender
Civil Works
Percentage
90 days
BALLIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹700
A.M.A.
₹11,864
31 Jul 2026
10 Jul 2026
29 Jul 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift up to 1.50 M and lead up to 30M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenhes or into the plint hand removal and disposal of surplus earth as directed by the Engineer- incharge upto a distance of 30M. from the foundation trenches including all T&P Phowarah and basket etc. complete Sl. No. 251 | 11.52 | cum | 115 | ₹1,324.8 |
| 2 | Concrete with 4 cm gauge brick ballast Fine sand of 1.25 F.M and cement in proportion of 8:4:1 in foundation and under floor including supply of all materials labour T & P etc. required for proper completion of the work. S.I.No. 275 | 1.44 | cum | 3,495 | ₹5,032.8 |
| 3 | R.C.C.Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in Coloumn excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G. G.I. binding wire and including necessary centering and shuttering etc.and supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Binding wire to be supplied by Contractor free of cost. S.I.No 288 | 17.36 | cum | 8,680 | ₹1,50,684.8 |
| 4 | Mild steel iron in plain work such as in reinforced concrete or rein force brick work wrought to required shape as necessary cutting. bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured required to proper completion of the work S.I.No. 504 | 17.03 | Qtl | 5,650 | ₹96,219.5 |
| 5 | (WBM.GRADE-3) Providing laying and spreading and compacting stone ballast of specific Sizes to Water bound mecadam speci. Inc. spreading in uniform thickness, hand packing, rolling with theree wheel 8-10 ton static roller in stages 2 proper grade and camber, applying and brooming stone screening / binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical spec. clause 405.3 compacted thickness 75 mm | 7.76 | cum | 4,837.1 | ₹37,535.9 |
| 6 | Construction of plain Cement concrete pavements thickness 15 cm , over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30(Grade) coarse sand fine aggregates conforming to IS .383.Maximum size of coarse aggregates not exceeding 25mm. mixed in a concrete not exceeding 25mm. mixed in a concrete mixer of not less than 0.1 cum. capacity and appropriate weight batcher using approved mxi design . laid in approved fixed side formwork & 125 micron thikness polythene film including levelling the formwork as per drawing spreading the concrete with sholvels rackes compated using meedle,screed and plate vibrater and finishing in continuous operation including provision of construction and expension curing of concrete slabs for 14 days curing compound and water finishing to lines and grade as per drawing and Technical specification clause 1501. | 13.5 | cum | 9,548.1 | ₹1,28,899.35 |
| 7 | S/O Hand rail and balustrade modular system passie ss-304 grade decorative railing system comprising of hand rail 50mm and 1.5mm thick of equal spacing with balustrade of SS pipe of 38mm and 1.5mm thick @ 1200mm C/C of passivated SS 304 grade and fix duly on the floor with specialy desing rivet expansion bolt and finish the surface foood and covering with steel shoe with all visible stainless steel metal of 304 grade in satin finish height of railing is 900 mm as per detailed specification .items no 20 of material.(SOR Ballia 30.05.2015) | 37 | Rm | 4,500 | ₹1,66,500 |
| 8 | S/F of granite Signboard including supply of all materials labour T & P etc.required for proper completion of the work. | 1 | Job | 7,000 | ₹7,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2191461.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].