Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC 17 BIPIN GANGULY ROAD KOL 30 | ₹2.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 LRejected-AOC 0 PANANDHRO PANANDHRO LAKHAPAT PANANDHRO KACHCHH GUJARAT 370627 UDYAM GJ 13 0010841 | KACHCHH | GUJARAT | 370627 | ₹2.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹2.4 LRejected-AOC MOHITNAGAR PASCHIM PARA MOHITNAGAR JALPAIGURI WB 735102 | JALPAIGURI | JALPAIGURI | WEST BENGAL | 735102 | ₹2.4 L | L3 | Rejected-AOC L3 |
Tender Value
₹2.4 L
EMD Value
₹4,836
Closing Date
30 Jun 2026, 6:00 pmClosed
Executive EngineerAI SWI Division IV
Office of the Executive EngineerAI SWI Division IV
Periodical Monitoring of Permanent Hydrograph Stations for measurement of ground water level and preparation of Hydrogeological and Groundwater Resource condition
2026_WRDD_1028802_1
1/26-27/SWI Div IV
Open Tender
CIVIL WORKS
Percentage
270 days
under Geological Division No IV Jalpaiguri
As per NIT
6 documents required · 6 mandatory
₹4,836
14 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire Charges for Hiring of Vehicle for Field Visit and Official Work (Inspection for Permit, Issuance of Certificate of Registration, Industry Visit, Revisit, Meeting Attendance and Sample Collection)
Sample Collection from all Stations (April / November) – 2 times in a year
Darjeeling – 930 km
Dakshin Dinajpur – 2040 km
Sub-total (Sample Collection) – 2970 km
Site Maintenance in all Stations (January / August) – 2 times in a year
Darjeeling – 870 km
Dakshin Dinajpur – 0 km
Sub-total (Site Maintenance) – 870 km
Total run per cycle – 3840 km
Number of cycles per year – 2
Total annual run – 7680 km | - | km | 13 | - |
| 2 | Surface Dressing of the ground in any kind of soil including removal of vegetation, inequalities not exceeding 15 cm in depth and disposal of rubbish within a lead up to 75 m, as directed.
Darjeeling – Total area = 50 × 9 Sqm × 2 times = 900 Sqm
Dakshin Dinajpur – Total area = 57 × 9 Sqm × 2 times = 1026 Sqm
Total Area = 1926 Sqm | - | SQM | 10 | - |
| 3 | Clearing compound premises of shrubs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary).
Payment to be made on area cleared.
Area = 3 m × 3 m = 9 Sqm (twice a year)
Darjeeling – Total area = 50 × 9 Sqm × 2 times = 900 Sqm
Dakshin Dinajpur – Total area = 57 × 9 Sqm × 2 times = 1026 Sqm
Total Area = 1926 Sqm | - | SQM | 11 | - |
| 4 | Charges for collection of water sample as per direction in double-capped “Alkathene Bottle” of 500 ml capacity, i.e., supply thereof and delivery of sample bottle at office.
Darjeeling – Total samples = 50 nos × 2 times = 100 nos
Dakshin Dinajpur – Total samples = 57 nos × 2 times = 114 nos
Total = 214 nos | - | nos | 18.86 | - |
| 5 | Labour charges for measuring water level from P. Tube / Dug Well / Tube Well by water level indicator / sounding / tape, etc., including hiring and carrying charges of tools, as directed.
Measurement must be taken as per direction of Engineer-in-Charge.
For DW and P-Tube without DWLR
Darjeeling District – 50 nos stations × 4 times = 200 nos
Dakshin Dinajpur – 57 nos stations x 4 times = 228 nos
No. of measurements = 428 nos | - | nos | 14.14 | - |
| 6 | Supply of G.I. pipes of TATA make including necessary socket.
Darjeeling District – 3 nos stations × 1 time = 3 nos
Dakshin Dinajpur – 57 nos stations × 1 time = 57 nos
Total No. of TW stations = 60 nos
Considering 0.5 m per 2 points = 30 nos × 0.5 m = 15 m | - | m | 402 | - |
| 7 | Labour for fitting and fixing G.I. pipes above ground (exposed) in structure with holder bat clamps including cost of jointing materials, holder bat clamps etc as necessary , inlcuding cutting pipes, making threads, etc complete in all respect with two coats of painting with approved paint any height, (Payment will be makde on the centre line measurement of the total pipeline including specials. Payment of painting will be paid seperately). a) 50mm dia
Length of pipe = | - | m | 93 | - |
| 8 | Supply of galvanised iron socket with ISI mark
i) 50mm dia" | - | m | 92 | - |
| 9 | Supply of galvanised iron jamnut
i) 50mm dia" | - | m | 60 | - |
| 10 | Taking photograph of ground water level depth measurement using GPS-enabled Android mobile or other similar devices, with real-time GPS time, longitude, latitude and ID of P.H.S.
Location details shall be stamped on the photograph.
The agency shall email the water level data in Excel format along with photographs taken for each site to the official email ID within the specified time, as directed by the Engineer-in-Charge.
Darjeeling District – 50 nos stations × 4 times = 200 nos
Dakshin Dinajpur – 57 nos stations × 4 times = 228 nos
No. of measurements = 428 nos | - | nos | 100 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
Tendernotice_2.pdf
PDF • 0.75 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_2526795.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].