Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.5 Cr
EMD Value
₹9.5 L
Closing Date
16 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE R AND B DIVISION BHAVNAGAR
Construction of Resurfacing of Hatab - Padva Road (MDR) Km/ 2+000 to 8+000 Ta. Dist. Bhavnagar
369216
18 For 2026-27
Open
Civil Works - Roads
Works
Bhavnagar
19 documents required · 19 mandatory
₹12,000
Executive Engineer, Bhavnagar (R&B) Division, Bhavnagar
₹9.5 L
25 Nov 2026
25 Nov 2026
25 Nov 2026
16 Dec 2026
25 Nov 2026
120 days
All Measurements shall be made in metric system. Different items of work shall be measured in
accordance with the procedures set forth in relevant sections read in conjunction with General
Conditions of contract. The same shall not however apply in the case of lump-sum items. All
measurements and computations ; unless other wise indicated, shall be carried nearest to be following
(i) Length and breadth………………………………………..10mm
(ii) Height, depth or thickness of earthwork,
Sub-base, bases surfacing, and structural members……….5mm
(iii) areas…………………………………………………… 0.01 Sq.Metre.
(iii) Cubic contents……………………………………………..0.01 Cubic Metre.
In recording dimensions of work the sequence of length, width and height or depth or thickness
shall be followed.
2.0. Measurement of lead for Materials :
Where lead is specified in the contract for construction materials, the same shall be measured as
described hereunder.
Lead shall be measured over the shortest practicable route and not the one actually taken and the
decision of the Engineer-in-charge in this regards shall be taken as final. Distance up to and including
metres shall be measured in units of 50 metres, exceeding 100 metes but exceeding 1 Km. in units of
metres, and exceeding 1 Km. in units of 500 metres. The half and greater than half of the units shall be
reckoned as one and less than half of the units ignored. In this regard, the source of the materials shall be
divided into suitable blocks and for each block the distance from the centre of the block to the centre of
placing pertaining to that block shall be taken as the lead distance.
3.0 Surface Regularity of sub grade and Pavement courses :
The surface regularity of completed sub-base courses and wearing surface in the longitudinal and
transverse direction shall be within the tolerances indicated in Table below. The longitudinal profile shall
be checked with a 3 metre long straight edge, at the middle of each traffic lane along a line parallel to the
centre line of the road. The transverse profile shall be checked with a set for three camber boards at
intervals of 10 metres.
PERMITTED TOLERANCES OF SUB REGULARITY FOR PAVEMENT COURSE.
Sr. Type of Longitudinal Profile with 3 metre straight edge. Cross Profile
construction Maximum Maximum number of undulation Maximum
permissible permitted in any 300 m. length permissible variation
undulation exceeding in from specified profile
in mm 18 12 10 6 camber themplate
1 Earth sub grade 36 30 - - -
2 Granular/lime 23 - 30 - -
Cement stabilized
3 Water Bound 18 - - 30 -
nominal size metal
4 Semi Dense carpet 15 - - - 20
1. These are for machine laid surfaces. If laid manually, due to unavoidable reason, tolerance up to
50 percent above these values in the columns may be permitted. However, this relaxation does not apply
to the values of maximum undulation for longitudinal and cross profiles mentioned in columns 3 and 8 in
2. Surface evenness requirements in respect of both the longitudinal and profiles should be
simultaneously satisfied.
3. Rectification : Where the surface irregularity of sub grade and the various pavement courses fall
out side the specified tolerances, the contractor shall be liable to rectify these in the manner described
below and to the satisfaction of the Engineer- in-Charge at this own cost.
(I) Sub grade; Where the surface in high, it shall be trimmed and suitably compacted. Where
the same in low, the deficiency shall be corrected by adding frees material. The degree of compaction and
the type of material to be used shall confirm to the specified requirements.
(ii) Granular/Sub Base: Same as at (i0 above except that the degree of compaction and the
type of material to be used shall conform to the specified requirements.
(iii) Lime/Cement stabilized soil sub-Base: For lime/ cement treated materials where the
surface is high, the same shall be suitably trimmed while taking care that the material below is not
disturbed due to this operation. However where the surface is low, the same shall be corrected as
described here in below.
For cement treated material, when the time elapsed between detection of irregularity and the time
of mixing of the material, is less than 2 hours, the surface shall be scarified to a depth of 50mm,
supplemented with freshly mixed material as necessary and recomposed to the relevant specification.
When this time is more than 2 hour, the full depth of the layer shall be removed from the pavement and
replaced with fresh material, to specification. In either case, the area treated shall not be less than
metres wide. This also applies to lime treated material except that the time criterion shall be 3 hours
instead of 2 hours.
(iv) Water Bound Macadam Base. : Where the surface is high or low, that top 75mm shall be
scarified, reshaped with added material as necessary and re compacted. The area treated at a place shall
not be less than 5 metres long and 2 metres wide.
(v) Bituminous Construction : For bituminous construction other than wearing course,
where the surface is low, the deficiency shall be corrected by adding fresh material and re compaction to
specifications, Where this surface is high, the full depth of the layer shall be removed and replaced with
fresh material and compacted to specifications. For wearing course, where the surface is high or low, the
full depth of the layer shall be removed and replaced with fresh material and compacted to specifications
in all cases where the removal and replacement of a bituminous layer is involved, the area treated shall
not be less than 5 metre long and not less than 1 lane wide.
4.0 Quality Control Test during Construction. :
The materials supplied and the works carried out by the Contractor shall conform to the enclosed
relevant specifications. For ensuring the requisite quality of construction, the materials and works shall
be subjected to quality control test as described hereinafter, by the Engineer-in-charge. The testing
frequencies set forth are the desirable minimum and the Engineer-in-charge shall have the full authority
to carry out test as frequently as he may deem necessary to satisfy that the materials at work comply
with the appropriated specification. Test procedures for the various quality control tests are indicated in
the respective sections of the specification or for certain tests within this section. Where no specific
testing procedure in mentioned, the test shall be carried out as per prevalent accepted engineering
practice to the directions of the Engineer-in-charge.
5.0 Tests of Earthwork foe Embankment Construction :
5.1 Borrow Materials:
(a) Sand content (IS: 2720 Part IV)
Two test per 8000 Cubic metres of soil.
(b) Plasticity Test (IS: 2720 Part-V)
Each type to be tested. Two tests per 8000 Cubic Metres of soil.
(c) Density test (IS: 2720 part-VII)
Each soil type to be tested. Two test per 8000 Cubic Metres of Soil.
(d) Moisture Content Test (IS: 2720 Part-II)
One test for every 250 Cubic Metres of soil.
5.2 Compaction Control :
Control shall be exercised by taking at least one measurement of density for each 1000 square
metres of compacted area, or closer as required to yield the maximum number of test results for
evaluating day’s work on statistical basis. The determination of density shall be accordance with IS:
(Part XXVIII). Test locations shall be chosen only through random sampling techniques. Control shall be
not being based on the result of any one test but on the mean value of set of 5-10 density determinations.
The number of tests in one set of measurements shall be 5 as long as it is felt that sufficient control over
borrow material and the method of compaction is being exercised. If considerable variations are
observed between individual density results, the minimum number of tests in one set of measurement
shall be increase to 10. The acceptance of work shall be subject to the condition that the mean dry density
equals or exceeds the specified density and the standard deviation for any set of result is below
gm/cc. However for earthwork in shoulders and in top 500 mm portion of the embankment below the
sub grade, at least one density measurement shall be taken for every 500 square metres of the compacted
area provided further that the number of the test in each set of measurement shall be at least 10. In other
respects, the control shall be similar to that described earlier.
6. Following materials shall conform to the Indian Standards shown against them;
(2) Sand for masonry IS:
(3) Sand for concrete IS:
(4) Course aggregate. IS:
(5) Mild Steel. IS:
(6) High yield strength deformed bars
(a) Hot Rolled. IS:
(b) Cold Twisted. IS:
7. Barrel thickness of pipes of different class shall be under:
Sir No Internal Diametre of pipes in Barrel thickness (in mm)
Clearing and grubbing of road land incl.uprooting trunk vegetation, grass, bushes, shurbs,
saplings and trees girth upto 300mm removal of stumps of trees cut earlier and disposal of
unserviceable materials © By mechanical means in area of Light jungle.
Clearing and grubbing shall be performed less than one month in advance of earthwork operations and
shall consist of cutting, trimming, removing and disposing of all materials such as trees, tree branches, bushes,
shrubs, stumps roots, grass, weeds, anthills, jungle top organic soil not exceeding 150 mm in thickness, rubbish,
loose stones, boulders, etc. which are undesirable and unsuitable for use in the works, from the designated area
of road land, embankment slopes, drains, cross-drainage structures and such other areas as specified on the
drawings or from areas as directed by the Engineer. It shall include grubbing, necessary excavation, backfilling
of pits resulting from uprooting of trees and stumps to required compaction, handling, salvaging, removal and
disposal of cleared materials in accordance with the requirements of these Specifications.
Reclearing of the site of any vegetation, grass shrubs before commencement of work shall be carried out
as directed by the Engineer and shall be incidental to the work of clearing and grubbing.
201.2. Preservation of Property / Amenities
Roadside trees, shrubs, any other plants, pole lines, fences, signs, monuments, buildings, pipelines,
sewers and all highway facilities within or adjacent to the road which are not to be disturbed shall be protected
from injury or damage by providing and installing suitable safeguards as shown in the drawing or as approved
by the Engineer.
During clearing and grubbing the Contractor shall take all adequate precautions for preservation of all
vegetation adjacent to road land against soil erosion, water pollution, etc. and where required, shall undertake
additional works to that effect. Before start of operations, the Contractor shall submit to the Engineer for
approval, his work plan including the procedure to be followed for disposal of waste materials, etc. and the
schedule for carrying out additional work where required.
201.3. Conservation of Top-soil
The top-soil removed during clearing and grubbing of site, if suitable for re-use shall be transported,
conserved and stacked as directed by the Engineer. This shall be incidental to the work.
201.4. Methods, Tools and Equipments
Only such methods, tools and equipment as are approved by the Engineer shall be adopted for the work.
If the area has thick vegetation/roots/trees, a crawler or dozer shall be used for clearance purposes. All trees,
stumps, etc. falling within excavation and fill line shall be cut to such depth below ground level that in no case
these fall within 500 mm of the sub grade. Also, all vegetation such as roots, under-growth, grass and other
deleterious matter unsuitable for re-use in the embankment/sub grade shall be removed between fill lines to the
satisfaction of the Engineer. On areas beyond these clearing limits trees and stumps required to be removed
shall be cut down to 500 mm below ground level so that these do not present an unsightly appearance.
All branches of trees extending above the roadway shall be cut or trimmed so as to provide a clear
height of 5 m above the road surface and shoulders.
All excavations below the general ground level arising out of the removal of trees, stumps etc. shall be
filled with material conforming to prescribed requirements and compacted to specified density, given by the
201.5. Removal of Ant-hills
Ant-hills both above and below the ground, as are liable to collapse and obstruct free subsoil water flow
shall be removed by excavating to a suitable depth as directed by the Engineer. The excavated ant-hills material
shall be carted away from the site. Cavities in the ground due to removal of ant-hills shall be filled with
approved material and compacted to specified densities, as directed by the Engineer.
201.6 Disposal of Materials
All materials including trees, stumps, etc. arising from clearing and grubbing operations shall be the
property of Government and shall be disposed off by the Contractor as here-in-after provided or as directed by
Trunks, branches and stumps of trees shall be cleaned of limbs and roots and stacked. Also boulders,
stones and other materials usable in road construction shall be neatly stacked as directed by the Engineer.
Stacking of stumps, boulders, stones etc. shall be done at specified spots with all lifts and upto a lead of 1000 m.
All products of clearing and grubbing which cannot be used or auctioned shall be cleared away from the
roadside in a manner as directed by the Engineer. Care shall be taken to see that unsuitable waste materials are
disposed off in such a manner that there is no likelihood of these getting mixed up with the materials meant for
embankment, sub grade and road construction or cause undesirable environmental conditions.
201.7. Measurements for Payment
Clearing and grubbing for road embankment, drains and cross-drainage structures shall be measured on
area basis in terms of hectares. Clearing and grubbing of borrow areas shall be incidental to embankment
construction and the rates quoted for the embankment construction shall be inclusive of it.
Cutting of trees upto 300 mm in girth including removal of stumps and roots, and cutting/trimming of
branches of trees extending above the roadway shall be considered incidental to the clearing and grubbing
operations. Removal of stumps of trees upto 300 mm girth left over after trees have been cut by any other
agency of the Contractor or Government shall also be considered incidental to the clearing and grubbing
Cutting, including removal of stumps and roots of trees of girth above 300 mm and backfilling to
required compaction and removal of stems and roots of trees of girth above 300 mm diametre left over after
trees have been cut by any other agency or the government shall be measured in terms of number according to
the sizes given below:
(i) Above 300 mm to 600 mm
(ii) Above 600 mm to 900 mm
(iii) Above 900 mm to 1800 mm
(iv) Above 1800 mm to 2700 mm
(v) Above 2700 mm to 4500 mm
(vi) Above 4500 mm
For this purpose, the girth shall be measured at a height of 1 m above ground or at the top of the stump,
if the height of the stump is less than 1 m from the ground.
Where the proposed work site passes through dense forest area, clearing and grubbing including cutting
of trees of all girths and removal of their roots and stumps, etc. for construction of road embankment, drains and
cross-drainage structures shall be measured on area basis.
201.8 Acceptance
Acceptance of clearing and grubbing shall be based on visual inspection of the work for compliance
with the above specifications to the satisfaction of the Engineer.
201.9.1. The Contract unit rates for the various items of clearing and grubbing shall be paid/payable in
full for carrying out the required operations including full compensation for all labour, materials, tools,
equipment and incidentals necessary to complete the work. These will also include removal of stumps and roots
of trees less than 300 mm in girth as well as stumps left over after cutting of trees carried out by another agency
of the Contractor or Government, excavation and backfilling to required density, where necessary, and
handling, salvaging, piling and disposing of the cleared materials with all lifts and upto a lead of 1000 m.
201.9.2. The Contract unit rate for cutting (including removal of stumps and roots) of trees of girth
above 300 mm and removal of stems and roots of trees of girth above 300 mm left over after trees have been cut
by any other agency or the government shall include excavation and backfilling to required compaction,
handling, salvaging, piling and disposing of the cleared materials with all lifts and upto a lead of 1000 m as
directed by the Engineer.
201.9.3. Where a Contract does not include separate items of clearing and grubbing, the same shall be
considered incidental to the earthwork items and the Contract unit prices for the same shall be considered as
including clearing and grubbing operations.
Earthwork for embankment including breaking clods, dressing with all lead and lift and
including watering rolling and consolidation of subgrade in layers at O.M.C. to required dry
density including filling the depression which occur during the process using power roller 8T to
10T. (E) From Borrow area within 3.0KM. lead.
1. The land width on which the earth work is to be done shall be cleared of all trees having a girth of 30cm
and loss, loose stones, vegetation, bushes, stumps and all other objectionable materials. All the materials cleared
will be the property of Government. Useful material shall be arranged in convenient stack the road boundary or
as directed at places within 50 metres lead, and handed over to the department in convenient section. Unsuitable
material shall be brunt or other wise disposed off by the contractor at own cost without causing any nuisance
inconvenience or damage to the works property or people in the neighborhood. In all cases the materials shall
be disposed off in a neat manner.
2. After cleaning the site, the alignment of the road shall be properly set out true to line, curves, slopes
grade sand sections as shown on then plan or directed by the Engineer-in-charge. The contractor shall provide
all labors and materials such as lime, string, pegs, nails, bamboos, stones, mortar, concrete etc. Required for
setting out, establishing. Bench Marks and giving profiles. The contractor shall be responsible for maintaining
the B.M.S. profiles alignment and other marks long they are required for the work in the opinion of the
Engineer-in-charge. If the contractor defaults in this respect they may be restored by the department at the cost
of the contractor.
3. When an existing embankment is to be widened, continuous, horizontal benches, each at least 0.3 metre
wide shall be cut into the existing slope for ensuring adequate bond with the fresh embankment materials to be
added. The material obtained from the cutting of benches can be utilized in the widening of the embankment.
The dumping of material from trucks for widening operation shall be avoided except in difficult circumstances
when the extra width is too narrow to permit the movement of any other type of hauling equipment.
4. The soil to be used for embankment shall be free from trees, stumps, root, rubbish or any other
objectionable materials. Only materials considered suitable by the Engineer-in-charge shall be used for the
construction and that considered unsuitable shall be disposed off as directed by him. The selection of materials
to be used in the construction of embankment shall be made after soil survey and investigations are carried out
by the Department. The embankment shall consist of earth available from road-side borrow pits on either side
with all lead and lifts. And within land width in the manner specified in Para 11. Below. The road, if any
required for the purpose of haulage of earth by men, animals or vehicles will be constructed. (If not existing)
and maintained by the contractor at his own cost.
5. Department is extended all necessary co-operations in helping contractor to get borrow from near by
Government or Panchayat land, if available. However department is not responsible if not such area is made
available to the contractor and in the case, contractor will have to make his own arrangement to get borrow area
for borrowing earth of the quantity even by making temporary arrangement with the private land owners.
6. The Embankment shall be constructed in uniform layer not exceeding 250mm in loose thickness. The
soil shall be spread uniformly over the entire width of the embankment unless otherwise directed by the
Engineer-in-charge. All clods of hard lumps of earth shall be broken to have maximum size of 15 cm. When
being placed in the embankment a maximum of size 5 cm when being placed in the top 45 cm. of embankment.
The work of next layer shall be allowed only after the first layer has been thoroughly compacted.
7. Where an embankment is to be placed on sloping ground shall be balanced in the step of trenches of
broken up in such a manner that the new material shall have perfect bond with the existing surface. Where the
embankment is to be placed over an existing road surface, the surface shall be scarified to minimum depth of a
5 cm. so as to provide ample bond between the old and new material. However when the embankment is to be
placed over and old concrete pavement and lies within 1 metre of new sub grade level, the pavement shall be
broken up in pieces not to exceed 0.1 m and may be metre of new sub grade left under the new embankment. If
the existing road surface is of granular or bituminous type and lies within 1 mt. of the new sub grade level, the
same shall be scarified to a depth of minimum 50mm. so as to provide ample bond between the old and the new
8. To avoid interference with contraction of abutment, wing walls or return walls of culvert/bridge
structures, the contractor shall at point to be determined by the Engineer-in-charge, suspend work on
embankment forming approaches to such structures, until such time as the construction of the latter is
sufficiently advanced to permit the completion of approaches without the risk of interference of damage to the
bridge work, unless directed otherwise the filling around culverts, bridge and other structures upto a distance of
twice the height of the embankment from the back of the embankment shall be carried out independent of the
work on the main embankment. The fill material shall not be placed against any abutment or wing wall unless
permission has been given by the Engineer-in-charge but in any case not until the concrete or masonry has been
in permission has been given by the Engineer-in-charge but in any case not until the concrete or masonry has
been in position for 14 days, the embankment shall be brought up simultaneously in equal layer on each side of
the structure to avoid displacement and unequal pressure. The sequence of work in this regard shall be got
approved from the Engineer-n-charge. Where the provision of any filter medium is specified behind the
abutment, the same shall be laid in layers with the laying of fill material. The material used for the filter shall
conform to the requirements for filler medium and will be paid extra in the relevant item.
9. The embankment shall be finished in conformity with the alignment, level, cross section and dimensions
shown on the plans or as directed by the Engineer-in-charge. Where the alignment of the road is in a curve, the
top of the embankment shall be formed with the super elevation and the increased width shown on the drawing
or as the Engineer-in-charge may direct. Finishing operation shall include the work of shaping and dressing the
shoulder, road bed and the slopes to conform to the cross section.
10. The earthwork measurement shall be paid on cross sectional measurements and computing the
volumes of earth work in cubic metres by average area method. The contractor shall sign day to day
leveling work and also original cross sections, longitudinal section etc. in token of his acceptance. The working
section both longitudinal and cross of the ground shall be taken by the Engineer-in-charge before the actual
work has started. The contractor or his authorized representative shall attend day to day leveling work and sign
with date the field book daily, in token of his acceptance, if there is any disagreement, the contractor shall
inform of it in writing to the officer concerned with specific reference to the sections before starting further
work. Once the work is started, no cognizance of any complaint will be taken merelay not signing to level book
shall not be deemed as disagreement. The Executive Engineer shall also verify leveling work to the extent of
5% before commencement of earth work and on finalization. The contractor shall maintaining the embankment
by filling in ruts, rain cuts, depression due to shrinkage etc. to proper formation and grade till this item is finally
measured and accepted by the Department. The measurements shall be the on compacted earth work. Deduction
of 15% for shrinkage shall be made from gross measured quantity if measured before first monsoon and 10% if
measured after one or more monsoon have been passed over the earth embankment. However the contractor
shall have to bear loss of deformation etc. If any due to all settlements as well as other type of deformation etc.
if any, that might have taken place at the time of taking measured of the item.
11. If usable approved material is available within the land width of road, the same shall be permitted for
used in the road embankment subject to the following conditions:-
(i) The borrow pits will be so excavated as to form a road side longitudinal gutter to drain the
water, interrupted by such gutter.
(ii) The width of the drain shall be restricted to 1.5mts. only the depth will be restricted to such
grade so as to drain the water efficiently. All balance quantity of earth shall be brought from
distant borrow areas only.
(iii) If there is top layer of black cotton or other objectionable soils, the same shall be removed
and disposed off elsewhere and usable material found at the lower level will only be used in
the earthen embankment, if the contractor choose to utilize this material.
(iv) the drain should be aligned along the boundry of the land width of the road. Not pit, other
than this drain shall be dug within 5 metres of the toe to the final section of the road
(v) No borrow pits shall be allowed in the length in which earth obtained for cutting from
cutting is specified to be used in embankment.
12 The rate of earthwork includes cleaning jungles, dog belling fixing profiles, erecting necessary pillars or
stones for bench mark for leveling purpose, excavating earth from borrow pits, bracking clods, conveying and
spreading earth in layers with all lead and lift, finishing the entire embankment and incidentals necessary to
complete the work to the specifications. The cutting stuff of cutting in ordinary soil, soft murrum, soft rock,
hard murrum and hard rock shall utilised in embankment costruction under this item within the lead specified in
the particulars item. No Payment shall be made under this item for the cutting stuff used in embankment but
labour for cutting will be paid as per specifications in the particulars item, and only balance quantity of
earthwork from borrow areas will be pain in this item.
Scarifying graveled macadam or Bitumen macadam surface 6cm to 10cm depth including stacking
useful materials on road side and disposing off remaining stuff.
1.0 The layer of the existing layer metaling shall be excavated and shall be screened on site of work.
Stacking of 75 % of metal obtained from screening shall be done by filling in the standard steel boxes of 2m x
1.5m x 0.5 m size deductions for voids shall be made form the gross measurements. Where any doubt exist as
to whether the quantity of stack of material in any hectormetre is not confirming with cubical content of the
standard pharas ( 2m x 1.5m x 0.5m) shall be got corrected by the Engineer-in-charge for which no extra
payment shall be claimed by the cont6racotr. If the quantity of metal in any stack in a particular hectometre is
found to be less then the standard measurements viz. 1.5 cmt. the entire collection in the hectometre shall be
paid on the be is of the quantity so found. Regular stack shall be done by you the contractor on a fairly level
ground stacking of the metal shall be done in a manner as directed by the Engineer-in-charge.
2.0 The remaining material except 75 % of metal obtained from screening process shall be used in
embankment with all lead and lit. It shall be directly deposited at the required location in specified layers No.
handling or conveyance change shall be paid if the material is temporarily deposited else where and
subsequently convey to site of duposition. The sequence of operations should be arranged property. M material
not required for any use what so ever may be disposed off by the contractor at his own cost in manner approved
by the Engineer-in-charge. The material utilised in the embankment it will be deducted from the net quantity of
earthwork in embnkment arrived at within the chainage measured.
3.0 The payment shall be made on sq.mt. basis, the contractor shall maintain all stacks in regular
and proper size till thw hole materials shall not be measured and finally accepted by the Department. The
spreading of materials shall not be allowed till the materials are fully stacked and completed kilometre wise.
4.0 The rate includes the cost of scarifying macadam, screeing, diposting, conveyance with all lead
and lift filling the boxes including all labour, tools, equipments and all other incidental expenses.
Construction of granular sub-base 250 mm thick layer by providing machine crushed B.T. material
satisfying MORT&H specification (Fifth revision) of grading I including spreading in uniform
layer with motor grader on prepared surface, mixing by mix in place method with rotavator at
OMC and compacting with vibratory roller to achieve the desired density etc. complete.
401. GRANULAR SUB-BASE
This work shall consist of laying and compacting well-graded material on prepared subgrade in
accordance with the requirements of these Specifications. The material shall be laid in one or more layers as
sub-base or lower sub-base and upper sub-base (termed as sub-base here-in-after) as necessary according to
lines, grades and cross-sections shown on the drawings or as directed by the Engineer.
401.2. Materials
401.2.1. The material to be used for the work shall be natural sand, gravel, crushed stone, depending
upon the grading required. The material shall be free from organic or other deleterious constituents and conform
to one of the three gradings given in Table 400.1. The grading to be adopted for a project shall be as specified in
TABLE 400.1 : GRADING FOR GRANULAR SUB-BASE MATERIALS
IS Sieve Designation Per cent by Weight Passing the IS Sieve
Grading I Grading II Grading III
Notes: (1) The material passing 425 micron (0.425 mm) sieve for all the three gradings when tested
according to IS:2720 (Part 5) shall have liquid limit and plasticity index not more than 25 and
per cent respectively.
(2) On clayey subgrades, the per cent passing IS Sieve 0.075 mm shall not exceed
401.3. Strength of Sub-base
When directed by the Engineer, this shall be verified by performing CBR tests in the laboratory as
required on specimens remoulded at field dry density and moisture content and any other tests for the “quality”
of materials, as may be necessary.
401.4. Construction Operations
401.4.1. Preparation of subgrade: Immediately, prior to the laying of sub-base, the subgrade already
finished to Clause 303 shall be prepared by removing all vegetation and other extraneous matter, lightly
sprinkled with water if necessary and rolled with two passes of 80-100 kN smooth wheeled roller.
The sequence of construction operations shall be such that the construction of granular subbase layer
shall match the construction of the adjoining layer in the shoulders, as per Clause 407.4.1.
401.4.2. Spreading and compacting: The sub-base material of grading specified in the Contract shall
be spread on the prepared subgrade with the help of suitable tractor-towed appliances, for maintaining the
required slope and grade during the operation or other means as approved by the Engineer.
When the sub-base material consists of combination of materials mentioned in Clause 401.2.1, mixing
shall be done mechanically by the mix-in-place method or by an approved mixing plant.
Manual mixing shall be permitted only where the width of laying is not adequate for mechanical
operations, as in small-sized jobs. The equipment used for mix-in-place construction shall be a tractor-towed
rotavator or similar approved equipment capable of mixing the material to the desired degree. If so desired by
the Engineer, trial runs with the equipment shall be carried out to establish its suitability for the work.
Moisture content of the loose material shall be checked in accordance with IS:2720 (Part 2) and suitably
adjusted by sprinkling additional water from a truck mounted or trailer mounted water tank and suitable for
applying water uniformly and at controlled quantities to variable widths of surface or other means approved by
the Engineer so that, at the time of compaction, it is from 1 per cent above to 2 per cent below the optimum
moisture content corresponding to IS:2720 (Part 7). While adding water, due allowance shall be made for
evaporation losses. After water has been added, the matiral shall be processed by mechanical or other approved
means, like, tractor-towed disc harrows, rotavators until the layer is uniformly wet.
Immediately thereafter, rolling shall start. If the thickness of the compacted layer does not exceed
mm, a smooth wheeled roller of 80 to 100 kN weight may be used. For a compacted single layer upto 225 mm
the compaction shall be done with the help of a vibratory roller of minimum 80 to 100 kN static weight. Rolling
shall commence at the lower edge and proceed towards the upper edge longitudinally for portions having
unidirectional crossfall and superelevation and shall commence at the edges and progress towards the centre for
portions having crossfall on both sides.
Each pass of the roller shall uniformly overlap not less than one-third of the track made in the proceding
pass. During rolling, the grade and crossfall (camber) shall be checked, with the help of templates and straight
edge, and any high spots or depressions, which become apparent, corrected by removing or adding fresh
material. The speed of the roller shall not exceed 5 km per hour.
Rolling shall be continued till the density achieved is atleast 100 per cent of the maximum dry density
for the material determined as per IS:2720 (Part 7). The surface of any layer of material on completion of
compaction shall be well closed, free from movement under compaction equipment and from compaction
planes, ridges, cracks or loose material. All loose, segregated or otherwise defective areas shall be made good to
the full thickness of layer and re-compacted.
401.5. Aggregate Plugs
When the granular sub-base is extended over the full formation, as shown on the drawings, the exposed
edges shall be protected with suitable aggregate plugs, 200 to 300 mm wide, as specified on the drawings.
401.6. Surface Finish and Quality Control of Work
The surface finish of construction shall conform to the requirements of Clause
Control on the quality of materials and works shall be exercised by the Engineer in accordance with
401.7. Arrangements for Traffic
During the period of construction, arrangement of traffic shall be maintained in accordance with Clause
401.8. Measurements for Payment
Granular sub-base shall be measured as finished work in position in cubic metres.
The protection of edges of granular sub-base extended over the full formation as shown in the drawing
shall be considered incidental to the work of providing granular sub-base and as such no extra payment shall be
made for the same.
The Contract unit rate for granular sub-base shall be payment in full for carrying out the required
operations including full compensation for:
(i) making arrangements for traffic to Clause 111 except for initial treatment to verges, shoulders
and construction of diversions;
(ii) furnishing all materials to be incorporated in the work including all royalties, fees, rents where
necessary and all leads and lifts;
(iii) all labour, tools, equipment and incidentals to complete the work to the Specifications;
(iv) carrying out the work in part widths of road where directed; and
(v) carrying out the required tests for quality control.
Providing and laying wet mix macadam base course 125 mm thick as per MORTH specification
using machine crushed B.T. chips as per required gradation, mixing with required optimum
quantity of water, conveying the mix to site of work, spreading in to grade and camber with
paver/mechanical means and consolidation each layer with vibratory roller to adhesive the desired
density including cost of material labour plant and equipment etc. complete.
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared subgrade/sub-base/base or existing pavement as
the case may be in accordance with the requirements of these Specifications. The material shall be laid in one or
more layers as necessary to lines, grades and cross-sections shown on the approved drawings or as directed by
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When
vibrating or other approved types of compacting equipment arc, used, the compacted depth of a single layer of
the sub-base course may be increased to 200 mm upon approval of the Engineer.
406.2. Materials
406.2.1. Aggregates
406.2.1.1. Physical requirements: Coarse aggregates shall be crushed stone. If crushed gravel/shingle
is used, not less than 90 per cent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at
least two fractured faces. The aggregates shall conform to the physical requirements set forth in Table 400-10
TABLE 400-10. PHYSICAL REQUIRMENTS OF COARSE AGGREGATES
FOR WET MIX MACADAM FOR SUB-BASE/BASE COURSES
Test Test Method Requirements
1 * Los Angeles IS:2386 40 per cent (Max)
Abrasion value (Part-4)
* Aggregate IS:2386 30 per cent (Max)
Impact value (Part-4) or
Flakiness and IS:2386 30 per cent (Max)**
Elongation (Part-1)
Indices (Total)
* Aggregate may satisfy requirements of either of the two tests.
** To determine this combined proportion, the flaky stone from a representative sample should first be
separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample. Only
the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index is
weight of elongated particles divided by total non-flaky particles. The value of flakiness index and
elongation index so found are added up.
If the water absorption value of the coarse aggregate is greater than 2 per cent, the soundness test shall be
carried out on the material delivered to site as per IS:2386(Part-5).
406.2.1.2. Grading requirements : The aggregates shall conform to the grading given in Table 400-11.
TABLE 400-11. GRADING REQUIREMENTS OF AGGREGATES FOR
WET MIX MACADAM
IS Sieve Designation Per cent by weight passing the IS sieve
600.00 micron 8-22
75.00 micron 0-8
Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be well graded from coarse to fine and shall not
vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
406.3. Construction Operations
406.3.1. Preparation of base : Clause 404.3.1. shall apply.
406.3.2. Provision of lateral confinement of aggregates: While constructing wet mix macadam,
arrangement shall be made for the lateral confinement of wet mix. This shall be done by laying materials in
adjoining shoulders along with that of wet mix macadam layer and following the sequence of operations
described in Clause 407.4.1.
406.3.3. Preparation of mix: Wet Mix Macadam shall be prepared in an approved mixing plant of
suitable capacity having provision for controlled, addition of water and forced/positive mixing arrangement
like pugmill or pan type mixer of concrete batching plant. For small quantity of wet mix work, the
Engineer may permit the mixing to be done in concrete mixers.
Optimum moisture for mixing shall be determined in accordance with IS:2720 (Part-8) after replacing
the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size. While adding
water, due allowance should be made for evaporation losses. However, at the time of compaction, water in the
wet mix should not vary from the optimum value by more than agreed limits. The mixed material should be
uniformly wet and no segregation should be permitted.
406.3.4. Spreading of mix : Immediately after mixing, the aggregates shall be spread uniformly
and evenly upon the prepared subgrade/sub- base/bass in required quantities. In no case should these be dumped
in heaps directly on the area where these are to be laid nor shall their hauling over a partly completed stretch be
The mix may be spread either by a paver finisher or motor grader. For portions where mechanical means
cannot be used, manual means as approved by the Engineer shall be used. The motor grader, shall be capable of
spreading the material uniformly all over the surface. Its blade shall have hydraulic control suitable for initial
adjustments and maintaining the same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hoppers and suitable distribution mechanism
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the layer as it
is spread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the finished
surface is free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low spots
remedied by removing or adding aggregate may be required. The layer may be tested by depth blocks during
construction. No segregation of larger and fine panicles should be allowed. The aggregates as spread should be
of uniform gradation with no pockets of fine materials.
406.3.5. Compaction: After the mix has seen laid to the required thickness, grade and crossfall/camber
the same shall be uniformly compacted, to the full depth with suitable roller. If the thickness of single
compacted layer does not exceed 100 mm, a smooth wheel roller of 80 to 100 kN weight may be used. For a
compacted single layer upto 200 mm, the compaction shall be done with the help of vibratory roller of
minimum static weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not exceed
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge
and progress gradually towards the upper edge. Thereafter, roller should progress parallel to the centre line of
the road, uniformly over-lapping each preceding track by at least one-third width until the entire surface has
been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward
until the edges have been firmly compacted. The roller shall then progress gradually towards the centre parallel
to the centre line of the road uniformly overlapping each of the preceding track by at least one-third width until
the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause
shall be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without scarifying the
surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion
in the sub-base/base course or subgrade. If irregularities develop during rolling which exceed 12 mm when
tested with a 3 metre straight edge, the surface should be loosened and premixed material added or removed as
required before rolling again so as to achieve a uniform surface conforming to the desired grade and crossfall.
In no case should the use of unmixed material be permitted to make up the depressions.
Rolling shall be continued till the density achieved is at least 98 per cent of the maximum dry density for
the material as determined by the method outlined in IS: 2720 (Part-8)
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose, segregated or
otherwise defective areas shall be made good to the full thickness of the layer and recompacted.
406.3.6. Setting and drying: After final compaction of wet mix macadam course, the road shall be
allowed to dry for 24 hours.
406.4. Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface
till it has dried and the wearing course laid.
406.5. Surface Finish and Quality Control of Work
406.5.1. Surface evenness : The surface finish of construction shall conform to the requirements of
406.5.2. Quality control : Control or, the quality of materials and works shall be exercised by the
Engineer in accordance with Section
406.6. Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or
where the course is otherwise defective due to subgrade soil getting mixed with the aggregates, the full
thickness of the layer shall be scarified over the affected area, reshaped with added premixed material or
removed and replaced with fresh premixed material as applicable and recompacted in accordance with Clause
406.3. The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall
depressions be filled up with unmixed and ungraded material or fines.
406.7. Arrangement for Traffic
During the period of construction, arrangement of traffic shall be done as per Clause
406.8. Measurements for Payment
Wet mix macadam shall be measured as finished work in position in cubic metres
Providing and laying Semi Dense Bituminous Concrete with B.T. aggregate as per MORTH
gradation and bulk asphalt grade VG-30 for mixing @ 50.00 KG. / M.T. i.e. 5.0% by weight of total
mix including heating and mixing the aggregate and asphalt by continuous of drum mix plant and
hot laid process laying with paver finisher and consolidation with roller as per MORTH
specification to achieve desire density, including cost all materials equipment, tools and plants,
oil, kerosene, firewood, labour charges etc. complete using contractor's own machineries drum mix
plant and paver finisher etc. completed as directed by Engineer in charge.
This clause specifies the construction of Semi Dense Bituminous Concrete, for use in wearing/binder
and profile corrective courses. This work shall consist of construction in a single or multiple layers of semi
dense bituminous concrete on a previously prepared bituminous bound surface. A single layer shall be 25mm to
100mm in thickness.
508.2. Materials
508.2.1. Bitumen: The bitumen shall be paving bitumen of Penetration grade complying with Indian
Standard Specification for Paving Bitumen, IS: 73 and of the penetration indicated in Table 500-15, for semi
dense bituminous concrete, or this bitumen as modified by one of the methods specified in Clause 521, or as
otherwise specified in the Contract. Guidance on the selection of an appropriate grade of bitumen is given in
The Manual for Construction and Supervision of Bituminous Works.
508.2.2. Coarse aggregates: The coarse aggregates shall be generally as specified in Clause 507.2.2,
except that the aggregates shall satisfy the physical requirements of Table 500-14.
508.2.3. Fine aggregates: The fine aggregates shall be all as specified in Clause 507.2.3.
508.2.4. Filler: Filler shall be generally as specified in Clause 507.2.4. Where the aggregates fail to
meet the requirements of the water sensitivity test in Table 500-14 then 2 per cent by total weight of aggregate,
of hydrated lime shall be added without additional cost.
508.2.5. Aggregate grading and binder content: When tested in accordance with IS:2386 Part 1 (Wet
sieving method), the combined grading of the coarse and fine aggregates and added filler shall fall, within the
limits shown in table 500-15 for gradings 1 or 2 as specified in the Contract.
508.3. Mixture Design
508.3.1. Requirements for the mixture: Apart from conformity with the grading and quality
requirements for individual ingredients the mixture shall meet the requirements set out in Table 500-16.
TABLE 500-14. PHYSICAL REQUIREMENTS FOR COARSE AGGREGATE FOR SEMI
DENSE BITUMINOUS CONCRETE PAVEMENT LAYERS
Property Test Specification
Cleanliness (dust) Grain size analysis1 Max5%passing
Panicle shape Flakiness and Elongation Index Max 30%
Strength* Los Angeles Abrasion Value3 Max 35%
Aggregate Impact Value4 Max 27%
Polishing Polished Stone Value5 Min
Durability Soundness:6
Sodium Sulphate Max 12%
Magnesium Sulphate Max 18%
Water Absorption Water absorption7 Max 2%
Stripping Coating and Stripping of Bitumen Minimum Retained
Aggregate Mixtures9 Coating 95%
Water Sensitivity** Retained Tensile Strength8 Min80%
Notes: 1. IS: 2386 Part 1 6. IS: 2386 Part
2. IS: 2386 Part 1 7. IS: 2386 Part
(the elongation test may be done only on non-flaky aggregates in the sample)
3. IS: 2386 Part 4* 8. AASHTOT283**
4. IS: 2386 Part 4* 9. IS:
5. BS: 812 Part
* Aggregate may satisfy requirements of cither of these two tests.
** The water sensitivity test is only required if the minimum retained coating in the stripping test is
The requirements for minimum per cent voids in mineral aggregate (VMA) are set out in Table 500-12.
508.3.2. Binder content: The binder content shall be optimised to achieve the requirements of the
mixture set put in Table 500-16 and the traffic volume as specified in the Contract. The Marshall method for
determining the optimum binder content shall be adopted as described in the Asphalt Institute Manual MS-2,
replacing the aggregates retained on the 26.5mm sieve and retained on the 22.4mm sieve, where approved by
TABLE 500-45. COMPOSITION OF SEMI DENSE BITUMINOUS CONCRETE
PAVEMENT LAYERS
Nominal aggregate size 13mm 10mm
Layer Thickness 35-40 mm 25-30 mm
IS Sieve (mm) Cumulative % by weight of total aggregate passing
Bitumen content % by mass of
total mix3 Min 4.5 Min
Bitumen grade (pen) 65* 65*
Notes: 1. The combined aggregate grading shall not vary from the low limit on one
sieve to the high limit on the adjacent sieve.
2. Determined by the Marshall method.
* Only in exceptional circumstances, 80/100 penetration grade may be used, as approved by the
TABLE 500-16. REQUIREMENTS FOR SEMI DENSE BITUMINOUS
PAVEMENT LAYERS
Minimum stability (kN at 60°C)
Minimum flow (mm)
Maximum flow (mm)
Compaction level (Number of blows) 75 blows on each of the two
faces of the specimen
Per cent air voids 3-5
Per cent voids in mineral aggregate (VMA) See Table 500-12
Per cent voids filled with bitumen (VFB) 65-78
508.3.3. Job mix formula: The procedure for formulating the job mix formula shall be generally as
specified in Clause 507.3.3 and the results of tests enumerated in Table 500-16 as obtained by the
Contractors.5083.4. Plant trials - permissible variation in job mix formula:
The requirements for plant trials shall be all as specified in Clause 507.3.4. and permissible limits for
variation as shown in Table 500-13.
508.3.5. Laying trials: The requirements for laying trials shall be all as specified in Clause 507.3.5.
508.4. Construction Operations
508.4.1. Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply.
508.4.2. Preparation of base: The surface on which the Semi Dense Bituminous material is to be laid
shall be prepared in accordance with Clauses 501 and 902 as appropriate, or as directed by the Engineer. The
surface shall be thoroughly swept clean by mechanical broom and dust removed by compressed air. In locations
where a mechanical broom cannot access, other approved methods shall be used as directed by the Engineer.
508.4.3. Geosynthetics: Where Geosynthetics are specified in the Contract this shall be in accordance
with the requirements stated in Clause
508.4.4. Stress absorbing layer: Where a stress absorbing layer is specified in the Contract, this shall
be applied in accordance with the requirements of Clause
508.4.5. Tack coat: Where specified in the Contract, or otherwise required by the Engineer, a tack coat
shall he applied in accordance with the requirements of Clause
508.4.6. Mixing and transportation of the mixture: The provisions as specified in Clauses 501.3.and
501.4 shall apply.
508.4.7. Spreading: The general provisions of Clauses 501.5.3 and 501.5.4 shall apply.
508.4.8. Rolling: The general provisions of Clauses 501.6 and 501.7 shall apply as modified by the
approved laying trials. The compaction process shall be carried out by the same plant, and using the same
method, as approved in the laying trials, which may be varied only with the express approval of the Engineer in
508.5. Opening to Traffic
The newly laid surface shall not be open to traffic for at least 24 hours after laying and the completion of
compaction, without the express approval of the Engineer in writing.
508.6. Surface Finish and Quality Control
The surface finish of the completed construction shall conform to the requirements of Clause 902. All
materials and workmanship shall comply with the provisions set out in Section 900 of this Specification.
508.7. Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance with the
provisions of Clause
508.8. Measurement for Payment
The measurement shall be all on MT basis.
Providing, laying compacted bituminous macadam considering 0.66 cmt./10Smt. Stone chips for
one M.ton as per specification, using the asphalt at rate 34.00 Kg/M.ton (i.e. 3.40% by weight of
total mix) for mixing and RS-1 for tack coat at rate 2.5 Kg/ 10sq.mt. including heating and mixing
the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and
spreading the same by paver finisher and consoli-dation with vibratory roller with necessary
equipments oil, kerosene,fire wood labour charges etc comp.with contractor's own machineries
and equipment tools etc. complete in accordance with the requirement.
This work shall consist of construction in a single course having 50mm to 100mm thickness or in
multiple courses of compacted crushed aggregates premixed with a bituminous binder on a previously prepared
base to the requirements of these Specifications. Bituminous macadam is more open graded than the dense
graded bituminous materials described in Clauses 507, 508 and
504.2. Materials
504.2.1. Bitumen: The bitumen shall be paving bitumen of Penetration Grade complying with Indian
Standard Specifications for “Paving Bitumen” IS:73, and of the penetration indicated in Table 500-4.
504.2.2. Coarse aggregates: The coarse aggregates shall consist of crushed rock, crushed gravel or
other hard material retained on the 2.36 mm sieve. They shall be clean, hard, durable, of cubical shape, free
from dust and soft or friable matter, organic or other deleterious matter. Where the Contractor’s selected source
of aggregates have poor affinity for bitumen, as a condition for the approval of that source, the bitumen shall be
treated with approved anti-stripping agents, as per the manufacturer’s recommendations, without additional
payment. Before approval of the source, the aggregates shall be tested for stripping.
The aggregates shall satisfy the physical requirements set forth in Table 500-3.
Where crushed gravel is proposed for use as aggregate, not less than 90% by weight of the crushed
material retained on the 4.75 mm sieve shall have at least two fractured faces.
504.2.3. Fine aggregates: Fine aggregates shall consist of crushed or naturally occurring material, or a
combination of the two, passing 2.36 mm sieve and retained on 75 micron sieve. They shall be clean, hard,
durable, dry and free from dust, and soft or friable matter, organic or other deleterious matter.
TABLE 500-3. PHYSICAL REQIREMENTS FOR COARSE
AGGREGATES FOR BITUMINOUS MACADAM
Property Test Specification
Cleanliness Grain size analysis1 Max 5% passing 0.075mm
Particle shape Flakiness and Elongation Index Max 30%
Strength* Los Angeles Abrasion Value3 Max 40%
Aggregate Impact Value3 Max 30%
Durability Soundness:4
Sodium Sulphate Max 12%
Magnesium Sulphate Max 18%
Water Absorption Water absorption5 Max 2%
Stripping Coaling and Stripping of Bitumen Minimum retained coating
Aggregate Mixtures6 95%
Water Sensitivity Retained Tensile Strength Min80%
Notes : 1. IS : 2386 Part 1 4. IS : 2386 Part
2. IS : 2386 Part 1 5. IS : 2386 Part
(the elongation test to be done only on non-flaky aggregates in the sample)
3. IS: 2386 Part 4* 6. IS:
7. The water sensitivity test is only required if the minimum retained coating in the stripping test is less
* Aggregate may satisfy requirements of either of these two tests.
504.2.4. Aggregate grading and binder content: When tested in accordance with IS: 2386 Part 1 (wet
sieving method), the combined aggregate grading for the particular mixture shall fall within the limits shown in
Table 500-4 for the grading specified in the Contract. The type and quantity of bitumen, and appropriate
thickness, are also indicated for each mixture type.
504.2.5. Proportioning of material: The aggregates shall be proportioned and blended to produce a
uniform mixture complying with the requirements of Table 500-4. The binder content shall be within a
tolerance of ± 0.3 per cent by weight of total mixture when individual specimens are taken for quality control
tests in accordance with the provisions of Section
504.3. Construction Operations
504.3.1. Weather and seasonal limitations: The provisions of Clause 501.5.1 shall apply.
TABLE 590-4. COMPOSITION OF BITUMINOUS MACADAM
Mix designation Grading 1 Grading
Nominal aggregate 40mm 8 19mm
size Layer thickness 80-100mm 50-75 mm
IS Sieve (mm) Cumulative % by weight of total aggregate passing
Bitumen content, % 3.1-3.4 3.3-3.5
by weight of total
Bitumen grade 35 to 90 35 to
Notes: 1. Appropriate bitumen contents for conditions in cooler areas of India may be up to 0.5% higher
subject to the approval of the Engineer.
504.3.2. Preparation of the base: The base on which bituminous macadam is to be laid shall be
prepared, shaped and compacted to the required profile in accordance with Clauses 501.8 and 902.3 as
appropriate, and a prime coat, shall be applied in accordance with Clause 502 where specified, or as directed by
504.3.3. Tack coat : A tack coat in accordance with Clause 503 shall be applied as required by the
Contract documents, or as directed by the Engineer.
504.3.4. Preparation and transportation of the mixture: The provisions of Clauses 501.3 and
504.3.5. Spreading: The provisions of Clauses 501.5.3 shall apply.
TABLE 500-5. MANUFACTURING AND ROLLING TEMPERATURES
Bitumen Bitumen Aggregate Mixed Material Rolling (0C) Laying (0C)
Penetration Mixing (0C) Mixing (0C) (0C)
35 160-170 160-175 170 Maximum 100 Minimum 130 Minimum
65 150-165 150-170 165 Maximum 90 Minimum 125 Minimum
90 140-160 140-165 155 Maximum 80 Minimum 115 Minimum
504.3.6. Rolling: Compaction shall be carried out in accordance with the provisions of Clauses
Rolling shall be continued until the specified density is achieved, or where no density is specified, until
there is no further movement under the roller. The required frequency of testing is defined in Clause
504.4. Surface Finish and Quality Control of Work
The surface finish of the completed construction shall conform to the requirements of Clause 902. For
control of the quality of materials supplied and the works carried out, the relevant provisions of Section
504.5. Protection of the Layer
The bituminous macadam shall be covered with either the next pavement course or wearing course, as
the case may be, within a maximum of forty-eight hours. If there is to be any delay, the course shall be covered
by a seal coat to the requirement of Clause 513 before opening to any traffic. The seal coat in such cases shall
be considered incidental to the work and shall not be paid for separately.
504.6. Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance with the
provisions of Clause
504.7. Measurement for Payment
Bituminous macadam shall be measured on MT basis.
Earthwork in cutting including preparing the slope and camber and stacking or utilising the
cutting stuff in bank as directed upto 200 Meters from the end of cutting with all lead and lift.(i)
This work shall consist of excavation in cutting in hard murrum strata, including the preparation of slopes and
camber, and the stacking or utilisation of the excavated cutting stuff in bank formation as directed, within a lead
of up to 200 metres from the end of the cutting, with all lifts. Hard murrum shall include all kinds of
disintegrated rock, shale, indurate sand, or conglomerate interspersed with boulders of size less than 0.70 cubic
metre and larger than 0.03 cubic metre which do not require blasting and can be removed by pick-axe and
shovel with little more force and effort. The work shall be executed in accordance with the relevant MoRTH
specifications and as directed by the Engineer-in-Charge.
Not Applicable. The item pertains to earthwork in cutting only.
3.1 Setting Out:
The limits of the cutting shall be set out true to the lines, levels, slopes, and sections as shown on the drawings
or as directed by the Engineer-in-Charge. The contractor shall provide all necessary labour and materials such
as line, strings, pegs, nails, and bamboos required for setting out, and shall maintain the reference marks and
bench marks throughout the currency of the contract.
3.2 Excavation:
Excavation shall be carried out to the exact width, depth, and slope as specified, and the cutting shall be taken to
the formation level with proper camber. The sides of the cutting shall be dressed to the approved slope. Any
over-excavation beyond the specified lines and levels due to the Contractor's negligence shall be made good at
the Contractor's own cost with approved material, and no extra payment shall be made for such rectification.
3.3 Preparation of Slope and Camber:
The slopes of the cutting shall be trimmed and dressed accurately to the specified gradient and profile, and the
formation shall be prepared to the required camber. All loose material shall be removed from the slope surface,
and the finished slope shall present a neat and uniform appearance.
3.4 Stacking or Utilisation of Cutting Stuff:
The excavated hard murrum shall be sorted and utilised in bank formation as directed by the Engineer-in-
Charge, or stacked neatly at designated locations within a lead of up to 200 metres from the end of the cutting.
All lifts and leads up to the specified distance shall be included in the rate. Unsuitable or surplus material shall
be disposed of as directed.
3.5 Lead and Lift:
All excavated material shall be conveyed within a lead of up to 200 metres from the end of the cutting and for
all lifts required, and the rate shall include the cost of all such leads and lifts.
4.0 QUALITY CONTROL
Parameter Acceptance Criteria
Cutting width and depth As per drawing and specified lines and levels
Slope Dressed to approved gradient and profile
Camber As specified
Formation level True to line and level
Stacking Neat and at designated locations within specified lead
5.0 MODE OF MEASUREMENT AND PAYMENT
5.1. The work shall be measured on Cubic Meter (Cum) basis.
Excavation for foundation in sand, gravel, clay soft soils and murrum etc. including shoring,
strutting dewatering as necessary and disposing of the excavated stuff as directed.(A)Depth upto
3.0 M. and lead upto 100m for 10 Cum.
1. Excavation for structures shall consist of the removal of materials for the construction of foundations for
bridges, culverts, retaining walls, headwalls, cut of walls, pipe culverts and other similar structures, in
accordance with the requirements, of these specifications and the lines and dimensions shown on the drawings
or as indicated by the Engineer-in-charge. The work sall be include all necessary sheeting, shorting, bracing,
draining and pumping and the removal of all logs, stumps, sbrubs, and other deleterious matter and obstruction
necessary for the foundations, trimming bottoms of excavations; back filling and clearing up the site and the
disposal of all surplus materials.
2. After the site has been cleared the limits of excavations shall be set out true to lines, curves, slopes,
grades and sections as shown on the drawings or as directed by the Engineer-in-charge. The contractor shall
provide all labour, survey instruments and materials such as stirrings, pegs nails bamboos, stones, lime, mortar,
concrete etc. required in connection with the sitting out of works and the establishment of bench mark, center
line stones and other marks and stakes as long as in the opinion of the Engineer-in-charge, they are required for
3. Excavation shall be taken to the with of the step of the footing. The contractor at his own expense
shall put up necessary shoring, strutting, and planking or cut slopes to a safer angle or both with due regard to
the safety of personal and works and to the satisfaction of the Engineer-in-charge.
4. The depth to which the excavation is to be carried out shall be is shown on the drawings, unless the
type of materials encountered is such as to require changes, in which case the depth shall be as ordered by the
Engineer-in-charge.
5. Where water is met with in excavation due to stream flow, seepage, rain or other reasons, the
contractor shall take adequate measure such as bailing pumping, to keep the foundation trenches dry when so
required and to protect the green concrete/masonary against damage by erosion of sudden rising of water
level.. the methods to be adopted in this regard and other details thereof shall be left to eht choie of the
contractor but subject to approval of the engineer-in-charge. Approval of the Engineer-in-charge shall, however
not relieve the contractor of the responsibility for the adequacy of dewatering, and production arrangements
and for the quality and safety of the works.
6. Pumping from the interior of any foundation enclosure shall be done in such a manner as to preclude
the possibility of movement of water through any fresh concrete. No pumping shall be permitted during the
placing of concrete or for any period of at least 24 hours thereafter, unless iot is done from a suitable sump
separated from the concrete work byu a wter tight wall or other similar means.
7.The bottom of the foundation shall be leveled both longitudinally and transversely or stepped as
directed by the Engineer-in-Charge. Before footing is laid. the surface shall be slightly watered ad rammed. In
the event of excavation having been made deeper than that shown on the drawing or as otherwise ordered by the
Engineer-in-charge , the extra depth shall be made up with concrete or masonary of the foundation grade at the
cost of the contractor. Ordinary filling shall not be used for the purposes to bring the foundation to level. If there
are any slips or blows in the excavation, these shall be removed by the contractor at his own cost.
8.Near towns, villages and all frequented places, trenches and foundation pits shall be securely fenced,
provided with proper caution signs and marked with red light at night to avoid accidents. The contractor shall
take adequate protective measures to see that the excavation operations do not affect or damage adjoining
9. Backfilling shall be done with approved materials after concrete or masonary is fully set and carried
out in such a way as not to cause undue thrust on any part of the structure. All space between foundation
masonary or concrete and the sides of excavation shall be refilled to the original surface, making due allowance
for settlement in 20mm loosee layers, which shall be watered and compacted.
10. All the excavated materials shall be the properly of the Government. Where the excavated materials
is to be used in the contraction of embankment, it shall be directly deposited at the required location within
100 metres lead.
11. all useful materials not intended for use in the bank, shall be stacked neatly on Government land as
directed by the Engineer-in-charge within 100 metres lead. Unsuitable and surplus, materials not intended for
use shall be disposed off as directed by the Engineer-in-charge.
12. Excavation for structures shall be measured in cubic metres for each class of materials
encountered, limited to the dimensions shown on the drawing or as directed by the Engineer-in-charge.
Excavation over increased width cutting of slopes, shoring, shuttering and planking shall be deemed as
convenience for the contractor in executing the work and shall not be measured and paid for separately.
13. The contract unit rate for the items of excavation for structures shall be paid in full for carrying
out the required operations including:
1. Settings out and fixing bench marks and center lines stones.
2. contractions of necessary shoring and bracing and their subsequent removal.
3. Removal of all logs, stumps, Grubs, and other deleterious matter and obstruction for placing the
foundations including trimming of bottoms of excavations.
4. Foundation sealing, dewatering including pumping.
5. Backfilling, Clearing up the site and disposal of all surplus materials within all lifts and lead upto
6. All labour, materials tools equipment, safeguards and incidentals necessary to complete the works to
the specification.
14. Excavation shall be for ordinary soil such as vegetation or organic soil, turf, sand, silt, loam, clay,
mud, black cotton soil, soft shale or soft murrum, a mixture of these and similar materials which yield to the
ordinary application of pick and shovel, or other ordinary digging equipment. Removal of gravel or any other
nedular material having in any one direction exceeding 75m occurring in such strata shall be deemed to be
covered under this category. The classification of excavation shall be decided by the Engineer-in-charge and
his decision shall be final and binding on the contractor.
15. Payment shall made on Cum basis
Providing and filling in foundation with ordinary cement concrete M-100 mix and providing
necessary vertical pin headers incl. Formwork, vibrating, ramming and curing complete.
Providing and cast in situ Ordinary Cement Concrete M-20 Mix and providing pin headers
including shuttering scafolding, laying, vibrating, curring and finishing complete with V-grooves
(A) Height from 0.0 M to 5.0 M.
1. In case of ordinary concrete, mix is not required to be designed by preliminary tests and proportion of
cement, fine aggregate and coarse aggregates are specified by volume as given in table below for different
grades of conrete designed as ordinary M. 100. , M. 150, M.200 and M.250.
2. In the designation of a concrete mix. letter “M” refers to the mix and the number the specified 28 days works
cube compressive strength of that mi on 150mm cubes expressed in kg./ cm2.
3. The ordinary concrete mix shall generally be specified by volume. For cement which normally comes
in bags and is used by weight, volume shall be worked out taking 50kg. of cement as 0.035 cubis metre in
volume. While measuring aggregate by volume, shaking, ramming or hammering shall not be done.
Proportioning of sand shall be as per its dry volume. In case it is dump, allowance for “bulking” shall be made
as per IS: 2386 (Part-III).
4. Ingredients required for ordinary concrete containing one 50 kg bag of cement of different proportions
of mix shall be as given in Table below.
Grade of Mix By Total quantity of dry Proportion of fine Quantity of water
Concrete Volume aggregates by volume per aggregate to coarse per 50 kg. of
50 Kg. of cement, to be aggregate cement max.
taken as sum of the
individual volumes of fine
and coarse aggregates
Ordinary Litres 300 General 1:2 for fine Litres
M.100 1:3:6 aggregate to coarse
M.150 1:2:4 220 aggregate by volume but
M.200 1:1 ½.3 160 subject to a upper limit of
M.250 1:1:2 100 1:1.1/2 & 2 lower limit of
NOTE:- The proportions of the aggregates shall be adjusted from upper limit to lower limit progressively
as the grading of the fune aggregates becomes finer & the maximum size of coarse aggregate
becomes larger.
Example:- For an average grading of fine aggregate (that is Zone II of IS: 383-1963) the proportions shall
be 1: 11/2, 1:2 and 1;3 for maximum size of aggregates 10mm, 20mm, and 40mm respectively
(after carrying out sieve analysis).
Note-2 A mix leaner than M.100 (1:3:6) may be used for non-structural parts, if provided in the contract.
In such case garding of aggregates shall be by volume. Other requirements for mixing, placing &
curing shall be the same.
5. Following shall be the maximum nominal size of coarse aggregate, for the different items of work:
Sr. No. Item of Construction Maximum nominal size of coarse
(i) R.C.C. well curb, R.C.C. well steining and R.C.C. Piles 40mm
(ii) R.C.C. well steining 63mm
(iii) Well cap or pile cap; solid type piers, abutment and wing- 40mm
walls, and their pier caps
(iv) R.C.C. Works in cross girders deck slab, wearing coars, 20mm
kewrb, light posts, blast walls, approach slab etc. and
hollow type piers, abutments, wing-walls and their pier
(v) R.C.C. bearings 20mm
(vi) For any other item of construction not covered by item (i) As specified on the drawing or as
to (v) desired by the Engineer- in-
charge in case it is not specified
For heavily reinforced concrete members as in the case of ribs of main beams nominal maximum size of
aggregate shall usually be restricted to 5 mm. Less than the minimum lateral clear distance between the main
bars or 5mm less than the minimum cover to the reinforcement, whichever is the smaller.
6. Fine aggregate shall be clean, hard, coarse sand, It shall be free from dust and such other substances.
The sand be got approved by the Engineer-in-charge.
7. All materials shall be stored as to prevent their deterioration or instruction of their quality and fitness
for the work. Any material which has deteriorated or has been damaged or is otherwise considered defective by
the Engineer-in-charge shall not be used in the works.
8. Cement shall be stored above the ground level in perfectly and water tight shed. Wherever bulk
storage containers are used, their capacity should be sufficient to cater to the requirements at site and should be
cleaned at least once every 3 to 4 months. The aggregate shall be stored in such a way as to prevent admixture
of foreign materials. Different size of fine or coarse aggregate shall be stored in separate stock-piles sufficiently
away from the each other to prevent intermixing the materials.
9. The water for mixing shall be potable water to satisfaction of the Engineer-in-charge. The quantity of
water shall be just sufficient to produce a dense concrete of required workability for the job.
10. For all work concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and so maintained through the construction. Mixing shall be continued
till materials are uniformaly distributed and uniform colour of the entire mass is obtained and each individual
particle of the coarse aggregate show complete coating of morter containing its proportionate amount of cement,
In no case shall the mixing be done for less than 2 minutes after all ingredients have been put into the mixer.
11. When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons.
It shll be done on a smooth watertight platform large enough to allow efficient tuning over of the ingredients of
concrete before and after adding water. Mixing platform shall be so arranged that no foreign materials shall get
mixed with concrete nor does the mixing water flow out. Cement in required number of bags shall be placed
in a uniform layer on top of the measured quantity of fine and coarse aggregate, which shall also the spread in
alayer of uniform thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be
mixed thoroughly by turning over to get a mixture of uniform colour. Enough water shall then be added
gradually through a rose can and the mass turned over till a mix of required consistency is obtained. IN hand
mixing quantity of cement shall be increased by 10 per cent above that specified.
12. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to be the Engineer-in-charge, the first batch of concrete from
the mixer shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
13. The method of transporting and placing concrete shall be approved by the Engineer-in-charge.
Concrete shall be so transported and placed that no contamination, segregation or loss of its constituent
materials takes places. All form work and reinforcement contained in it shall be cleaned and made free from
standing water, dust, snow or ice immediately before placing of concrete. No concrete shall be placed in any
part of the structure until the approval of the Engineer-in-charge has been obtained.
14. If concreting is not started within 24 hours of the approval give, it shall have to be obtained again from the
Engineer-in-charge. Concreting being given, it shall proceed continuously over the area between construction
joints. Fresh concrete shall not be placed against concrete which has been in position for more than 30 minutes
unless a proper construction joint is formed. Concrete shall be compacted in its final position within 30 minutes
of its discharge from the mixer unless carried in properly design agitators, operating continuously, when this
time shall be with 2 hours of the addition of cement to the mix and within 30 minutes of its discharge from the
agitator. Except where otherwise agreed to be the Engineer-in-charge, concrete shall be deposited in horizontal
layers to a compacted depth of nor more than 0.45 metre when internal vibrators are used and not exceeding
0.30 metre in all other cases.
15. Unless otherwise agreed to by the Engineer-in-charge concrete shall not be droped into place from a height
exceeding 2 metres. When trunking or chutes are used they shall be kept clean and used in such a way as to
avoid segregation. When concerting has to be resumed on a surface which has hardened, it shall be roughened,
swept, clean, thoroughly wetted and covered with a 13 mm thick layer of mortar composed of cement and sand
in the same ratio as in the concrete mix itself. This 13mm layer of mortar shall be freshly mixed and placed
immediately before placing of new concrete. Where concrete has not fully hardened, all laitance shall be
removed by scrubbing the well surface with wire or bristle brushes, care being taken to avoid dislodgement of
any particles of coarse aggregate. The surface shall then be thoroughly wetted, all free water removed and then
coated with neat cement grout. The first layer of concrete to be placed on this surface shall not exceed 150mm
in thickness, and shall be well rammed against oldwork particular attention being given to corners and close
16. All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under
water, where vibrators can not be used, Sufficient vibrators in serviceable condition shall be kept at site so that
spare equipment is always available in the event of break downs.
17.. immediately after compaction, concrete, shall be protected against harmul, effects of weather,
including rain, running water, shocks, vibration, traffic, rapid temperature changes, frots and driving out
process. It shall be covered with wet sacking, hessian or other similar absorbent material approved by the
Engineer-in-charge soon after the initial set, and shall be kept continuously wet for a period of not less than
days from the date of placement. Masonary work over the foundation concrete may be started after 48 hours of
its laying but the curing of concrete shall be continued for a minimum period of 14 days.
18. From work shall include all temporary or permanent forms required for forming the concrete,
together with all temporary construction required for their support. From shall however be divided into
following two district categories:-
(1) Shuttering i.e. form work required for forming the concrete.
(2) Scaffolding i.e. form work required for supporting shuttering.
Forms for shuttering shall be constructed only in metal suitable lined. Forms for scaffolding shall be
constructed for metal or timber. Both shuttering and scaffolding shall be or substantial rigid construction and
shuttering shall be true to shape and dimensions shown on the drawings. All bolts and rivets shall be counter-
sunk and well ground to provide a smooth, lane surface.
19. Forms shall be mortar-tight and shall be made sufficiently rigid by the use of ties and bracings to
prevent any displacement or sagging between supports. They shall be strong enough to withstand all pressure,
ramming and vibration, without deflection from the prescribe line occurring during and after placing the
concrete. Screw jacks or hard wood wedges where required shall be provided to make up any settlement in the
form work either before or during the placing of concrete. Suitable comber shall be provided in horizontal
members of structure, specially in long spans to counteract the effects of any fixed as to provide such camber.
Forms shall be so constructed as to be removable in sections in the desired sequence, without damaging the
surface of concrete or disturbing other sections. Unless otherwise specified or directed, chambers or fillets of
sizes 25mm x 25mm shall be provided at all angles of formwork to avoid sharp corners.
20. The inside surface of shuttering shall, except in the case of permanent form work or where otherwise
agreed to by the Engineer-in-charge, be coated with an approved materials to present adhesion of concrete to
the for work. Releases agents shall be applied strictly in accordance with the manufacturer’s instructions and
shall not be allowed to come into contact with any reinforcement or prestressing tendons and anchorages.
Different release agents shall not be used in form work for concrete which will be visible in the finished works.
21. Special measures shall be taken to ensure that the form work does not hinder the shrinkage of concrete
because without these cracking could before the form work is removed. Wherever applicable arrangements
must be made to ensure that the form work does not restrain the shortening and hogging of the beams or slabs
during tensioning of the tendons. The form work should take due account of the calculated amount of positive
or negative camber so as to ensure the correct final shape of the structures having regard to the deformation of
a false work, scaffolding or propping and the instantaneous or deferred deformation due to various causes
affecting prestressed structures. Where there are re-entrant angles in the concrete sections the form work should
be removed at those sections as soon as possible after the concrete has set in order to avoid cracking due to
shrinkage of concrete. From work shall be tight enough to prevent any appreciable loss of cement during
vibrations, suitable tolerances should be provided in the harmwork. Immediately before concreting all forms
shall be thoroughly cleaned. Contractor shall give the Engineer-in-charge due notice before placing any
concrete in the forms to permit him to inspect and accept the false work and forms as to their strength alignment
and general fitness, but such inspection shall not relieve the contractor of his responsibility for safety of men,
machinery, materials and or results obtained.
22. The Engineer-in-charge shall be informed in advance be the contractor of his intention to strike any
formwork. While fixing the time for removal of formwork, due consideration shall be given to local conditions,
character of the structure, the weather and other conditions that influence the setting of concrete and of the
materials used in the mix. Where field operations are controlled by strength tests of concrete, the removal of the
load-supporting or soflit forms may commence when concrete has attained strength equal to atleast twice the
stress to which the concrete will be subjected at the time of atriking props including the effect of any further
addition of loads. When field operations are not controlled by strength tests of concrte the vertical forms of
beams. columns and walls may be removed after 2 days. The props of slabs and beams may be removed after
14 and 21 days respectively. All formwork shall be removed without causing any damage to the concrete.
Centering shall be gradually and uniformly lowered in such a manner as to permit the concrete to take stresses
due to its own weight uniformly and gradually. Where internal metal ties are permitted, they or their removable
parts shall be extracted without causing any damage to the concrete and remaining holes filed with mortar. No
permanently embedded metal part shall have less than 25 mm. cover to the finished concrete surface. Where it
is intended to refuse the formwork, it shall be cleaned and made good to the satisfaction of the Engineer-in-
23. Immediately after the removal of forms, all exposed bars or bolts passing through the Cement
concrete member and used for shuttering or any other purposes shall be cut inside the cement concrete member
to a depth of at least 25mm. below the surface of the concrete and the resulting holes be filled by cement
mortar. All fins caused by form joints, all cavities produced by the removal of form ties and all other holes and
depressions, hone comb spots, broken edges or comers and other defects, shall be thoroughly cleaned, saturated
with water and carefully pointed and rendered true with mortar of cement and fine aggregate mixed in the
proportions used in the grade of concrete that is being finished and of as dry as consistency as is possible to
use, considerable pressure shall be applied in filling and pointing to ensure thorough filling in all voids, surface
which have been pointed shall be kept moist for a period of twenty four hours. If rock pockets/ honeycomds, in
the opinion of the Engineer-in-charge are of such an extent or character as to affect the strength of the structure
materially or to endanger the life of the steel reinforcement, he any declare the concrete defective and require
the removal and replacement of the portions of the structure affected.
24. In the case of reinforced concrete work workability shall be such that the concrete surrounds and
properly grips all reinforcement. The degree of consistency, which shall depend upon the nature of work and
methods of vibration of concrete shall be determined by regular slump testes. Following slump shall be adopted
for different types of works.
Type of work Where vibrators are used Slumps
Where vibrators are not
(i) Mass concrete in R.C. C. foundations, 10mm to 25mm 80mm
footings and retaining walls
(ii) Beams, slabs and columns simply reinforced 25m to 40mm 100mm to 120mm
(iii) Thin R.C.C. section or section with 40mm to 50mm 125mm to 150mm
congested steel
25. Works strength tests shall be made in accordance with IS:516. Each test shall be conducted on ten
specimens, five of which shall be tested at seven days and the remaining five at 28 days. The samples of
concrete shall be taken on each day of concreting and cubes shall be made at the rate of one for every 5 cubic
metre of concrete or a part thereof. However , if conreting done in a day in less than 15 cubic metree, the
minimum number of cubes can be reduced to 6 with the specific permission of the Engineer-in- charge, similar
works tests shall be carried out whenever the quality and grading of materials is charged irrespective of the
quantity of concrete proud. The number of specimens may be suitably increased as deemed necessary by the
Engineer-in- charge when procedure of tests given above reveal a poor quality of concrete and in other special
26. The average strength of the group of cubes cast for each day shall not be less than the specified works
cube-strength. 20 per cent of the cubes cast for each day may have values less than the specified strength,
provided the lowest value is not less than 85 per cent of the specifies strength.
27. R.C.C. work shall have exposed concrete surface. Centering design and its erection shall approved by he
Engineer-in- charge. One carpenter with helper will invariably be kept present throughout the period of
concreting. Movement of labour and other persons shall be totally prohibited over reinforcement laid in
position. For access to different parts, suitable mobile platforms shall provided so that steel reinforcement in
position is not disturbed. For ensuring proper cover, motar blocks of suitable size shall be cast and tied to the
reinforcement. Timber, kapchi, or matal pieces shall not be used for this purpose. Concreting of important
structural members shall always be done in the presence and under the supervision of department person not
below the rank of Astt. Engineer/ Addi-Astt. Engineer Overseer or as instructed by the Engineer-in- charge.
After removal of form work checks that concrete produced is of good quality. Plastering shall not be allowed to
the expressed faces of concrete.
28. In reinforced concrete the volume occupied by reinforcement shall not be deducted. The slab shall be
measured as running continuously through and the beam as the portion below the slab.
29. All necessary labour, materials equipment, etc. for sampling, preparing test cubes, curing etc., shall be
provided by the Contractor. Testing of the materials and concrete may be arranged by Engineer-in- charge in an
approved labouratory at the cost of the contractor.
30. The payment will be made on cmt. basis of the finished work.
31. The unit rate for concrete shall include the cost of all materials, labour, tools and plan required for mixing
placing in position, vibrating and compacting finishing as per directions of the Engineer- in- charge , curing
and all other incidental expenses for producing concrete of specified strength to complete the structure or its
components as show on the drawings and according to these specifications. The rate shall also include the cost
of making/ fixing and remixing of all centers and forms required for the work
Providing and casting in situ controlled cement concrete M-20 for R.C.C. return as per drawings
including centering shuttering, scaffolding where necessary, laying vibrating, curing and
finishing complete.(A) Height from 0.0 to 5.0 M.(3) RCC return.
1. For controlled concrete, design of the mix shall be approved after preliminary tests and all necessary
precautions shall be taken in its production to ensure that the required works cube strength is attained and
maintained. The controlled concrete shall be in eight grades designed as M.100, M. 150, M.200, M.250, M.300,
M.350, M.400, M.450 with the suffix ‘controlled’ added to it.
2. In the designation of a concrete mix, letter ‘M’ refers to the mix and the number to the specified
days works cubs compressive strength of that mix on 150 m. cubes, expressed in kg/cm. where ordinary.
Portland cement conforming to IS:269 or Portland blast furnace cement conforming to IS:455 is used. the
compressive strength requirements for various grades of concrete shall be as given below on the next page:
Grade of Concrete Compressive works test strength in Kg. / cm2 on 150mm, cubes,
conducted in accordance with IS:
Min. at 7 days Min.at 28 days
NOTE: In cases the 28 days compressive strength specified in the above. Table shall alone be the
criterion for acceptance or rejection of the concrete.
Where the strength of a concrete mix, as indicated by tests, lies in between the strength for any two
grades specified in the above. Table such concrete shall be classified for all purposes as a concrete belonging to
the lower or the two grades between which its strength lies.
3. Concrete mix shall be designed on the basis of preliminary tests so as attain a strength at least 33 per
cent higher than that required on work tests. The proportions for ingredients chosen shall be such that concrete
has adequate workability for conditions prevailing on the work in question and can be properly compacted with
the means available. Except where it can be shown to the satisfaction of the Engineer-in- charge that supply of
properly graded aggregate of uniform quality can be maintained till the completion of work, grading of
aggregate should be controlled by obtaining the coarse aggregates in different sizes and bleeding them in the
right proportions as required. Aggregates of different size shall be stocked in separate stock piles. Required
quantity of material shall be stock piled several hours, preferably a day, before use. Grading of coarse and fine
aggregate shall be checked as frequently as possible, frequency for a given job being determined by the
Engineer-in- charge to ensure that the suppliers are maintaining the uniform grading as approved for samples
used in the preliminary tests.
4. In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight.
Where the weight of cement is determined by accepting the majors weight per beg, a reasonable number of bags
shall be weighed separately to check the net weight. Where cement is weighed from bulk stocks at site and not
by bags, it shall be weighed separately from the aggregates. Water shall either be measured by volume in
calibrated tanks or weighed. All measuring equipment shall be maintained in a clean, and serviceable condition.
Their accuracy shall be periodically checked.
5. It is most important to keep the specified water cement ration constant and at its correct value. To this
end, moisture content in both fine and coarse aggregate shall be determined by the Engineer-in- charge
according to the weather conditions. The amount of mixing water shall then be adjusted to compensate for
variations in the moisture cement. For the determination of moisture content in the aggregates IS: 2386 (Part-
III) shall be referred to. Suitable adjustment shall also be made in the weights of aggregates to allow for the
variation in weights of aggregates due to variation in their moisture content Minimum quantity of cement to be
used in controlled concrete shall not be less than 210 Kg. per cubic metre in plain concrete and not less than
300 kg/.per cubic metre in reinforced concrete structural members. The minimum quantity of cement for
professed concrete work shall not less than 360 kg/p[er cubic metre of concrete nor shall it be more than
kg/per cubic metre of concrete.
6. Following shall be the maximum nominal size of coarse aggregate for the different items of work.
Sr. Item of construction Maximum nominal size of Coarse
(i) R.C.C. well curb, R.C.C. well steining and R.C.C. Piles 40mm
(ii) P.C.C. well steining. 63mm
(iii) Well cap or pile cap, solid type pires, abutments and 40mm
wing- walls, their pier caps.
(iv) R.C.C. works in cross girders, deck slab, wearing 20mm
coarse, kerb, light posts, blast, walls approach slab etc.
and hollow type piers, abutments wing-walls and their
(v) R.C.C. bearings 20mm
(vi) For any other item of construction covered by items (i) As specified on the drawing or as desired
to (v) above by the Engineer-in- charge in case it is
not specified on drawing.
For heavily reinforced concrete members as in the case of ribs of main beams, nominal maximum size
of aggregate shall usually be restricted to 5mm less than the minimum laternal clear distance between the main
bars of 5mm. less than the minimum cover to the reinforcement whichever is the smaller.
7. Fine aggregate shall be clean, hard, coarse sand. It shall be free dust and such other substances. The
sand be get approved by the Engineer-in- charge.
8. All materials shall be stored as to prevent their deterioration of there quality and fitness for the
work. Any materials which has deteriorated or has been damaged or is otherwise considerd defective by the
Engineer-in- charge shall not be used in the works.
9. Cement shall be stored above the ground level in perfectly dry and watertight sheds. Wherever bulk
storage containers are used, their capacity should be sufficient to cater to the requirements at site and should be
cleaned atleast once every 3 to 4 months. the aggregates shall be stored in such a way as to prevent admixture
of foreign materials. Different sizes of fine or coarse aggregate shall be stored in separate stock piles
sufficiently away from such other to prevent intermixing the materials.
10. the water for mixing shall be potable water to satisfaction of the Engineer-in- charge. The quantity of
water shall be just sufficient to produce a dense concrete of required workability for the job.
11. For all work concrete shall be mixed in a mechanical mixer which alongwith other accessories shall
be kept in first class working condition and so maintained throughout the construction Mixing shall be
continued till materials are uniformly distributed and uniform colour of the entire mass is obtained and each
indiua particle of the coarse aggregate shows complete coating of mortar containing its proportionate amount of
cement. In no case shall the mixing be done for less than 2 minutes after all ingredients have been put into the
12. Mixer which have been out of use more than 30 minutes shall be thoroughly cleaned before putting
in a new batch. Unless otherwise agreed toi be the Engineer-in- charge, the first batch of concrete from the
mixer shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly
cleaned before changing from one type of cement to another.
13. The method of transporting and placing concrete shall be approved by the Engineer-in- charge.
Concrete shall be so transported and placed that no contamination, segregation or loss of its constituent
materials takes place. All form work and reinforcement contained in it shall be cleaned and made free from
standing water, dust, snow or ice immediately before placing of concrete. No concrete shall be placed in any
part of the structure until the approval of the Engineer-in- charge has been obtained.
14. If concreting is not started within 24 hours of the approval being given. It shall have to be obtained
again from the Engineer-in- charge. Concreting then shall proceed continuously over the area between
construction joints. FResh concrete shall not be placed against concrete which has been in position
for more than 30 minutes unless a proper construction joint is formed. Concrete shall be compacted in its final
position within 30 minutes of its discharge from the mixer-unless carried in properly design agitators, operating
continuously when this time shall be within hours of the addition of cement to the mix an within minutes of its
discharge from the agitator. Except where otherwise agreed to be the. Concrete shall be deposited in horizontal
layers to a compacted depth of not more than .5 metre when internal vibrator are used not exceeding . metre in
all other cases.
15. Unless otherwise agreed to be the Engineer-in-charge concrete shall not be dropped into place from
a height exceeding metres. When trunking or chutes are used they shall be kept clean and used in such a way as
to avoid segregation. When concreting has to be resumed on a surface which has hardened, it shall be
roughened, swept clean, thoroughly wetted and covered with a 13mm. thick layer or mortar composed of
cement and sand in the same ratio as in the concrete mix itself. This 13mm layers of mortar shall be freshly
mixed and placed immediately before placing of new concrete. Where concrete has not fully hardened, all
laitance shall be removed by scrubbing the wet surface with wire or bristle brushes, care being taken to avoid
dislodgement of any particles of coarse aggregate. The surface shall then be thoroughly wetted, all free water
removed and then coated with neat cement grout. The first layers of concrete to be placed on this surface shall
not exceed 150mm. in thickness and shall be well rammed against old particular attention being to comers and
16. All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under
water, where vibrators can not be used. Sufficient vibrator in serviceable condition shall be kept at site so that
spare equipment is always available in the event break downs.
17. Immediately after compaction, concrete shall be protected against harmful effects of weather
including rain, running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out
process. It shall be covered with wet scking, hessian or other similar absorbant materials approved by the
Engineer-in-charge soon after the initial set, and shall be kept continuously wet for a period of not less than
days from the date of placement. Masonary work over the foundation concrete may be started after 48 hours of
its laying but the curing of concrete shall be continued for a minimum period of 14 days.
18. Form work shall include all temporary or permanent forms required for forming the concrete,
together with all temporary construction required for their support. Formwork shall however be delived into
following two distict categories:
(1) Shuttering i.e. from work required for forming the concrete.
(2) Scaffolding i.e. form work required for supporting shuttering.
Forms for shuttering shall be constructed only, in metal suitably lined. Forms for scaffolding shall be
constructed of metal or timer. Both shuttering and scaffolding shall be substantial rigid construction and
shuttering shall be true to shape and dimensions show on the drawings. All bolls and riverts shall be counter-
suck and well ground to provide a smooth, plane surface.
19. Forms shall be mortar-tight and shall be made sufficiently rigid by the use of ties and bracings to
prevent any displacement or sagging between supports. They shall be strong enough to with stand all pressure
ramming and vibration, without deflection from the prescribed lines occurring during and after placing the
concrete. Screw jacks or hardwood wedges where required shall be provided to make up any settlement in the
formwork either before or during the placing of concrete. Suitable camber shall be provided in horizontal
members of structure specially in long spans to conterate the effects of any deflection. The formwork shall be
so fixed as to provide for such camber, forms shall be so constructed as to be removable in sections in the
desired sequence. Without damaging the surface of concrete or disturbing other sections. Unless otherwise
specified or directed, chamber or filletlllls or sizes 25mm x 25mm shall be provided at all angles of form work
to avoid sharp comers.
20. The inside surface of shuttering shall, except in the case of permanent from work or where otherwise
agreed to be the Engineer-in-charge, be coated with an approved material to prevent adhesion of concrete to the
form work. Release agents shall be applied strictly in accordance with the manufacture instructions and shall
not be allowed to come into contact with any reinforcement or prestressing tendons
and anchorages. Different release agent shall not be used in form work for concrete which will be visible in the
finished works.
21. Special measures shall be taken to ensure that the form does not hinder the shrinkage of concrete
because without these cracking could occur before the form work is removed. Wherever applicable
arrangements must be made to ensure that the form work does not restrain the shortening and hogging of the
beams or slabs during tensioning of the tendons. The form work should take due account of the calculated
amount of positive or negative camber so as to ensure the correct final shape of the structure having regard to
the deformation due of false work, scaffolding or propping and the instructure or deferred deformation due to
various causes affecting prestressed structures. Where they are re-entrant angles in the concrete sections the
form work should be removed at these sections as soon as possible after the concrete has set in order to avoid
cracking due to shrinkage of concrete. Form work shall be tight enough to prevent any appreciable loss of
cement during vibrations, Suitable tolerance should be provided in the formwork, immediately before
concreting all forms shall be thoroughly cleaned. Contractor shall give the Engineer-in-charge due notice
before placing any concrete in the forms to permit him to inspect and accept the false work notice before
placing any concrete in the forms to permit him to inspect and accept the false work and forms as to their
strength, alignment and general fitness, but such unspection shall not relieve the contractor of his
responsibility for safety of men, machinery , materials and for results obtained.
22. The Engineer-in-charge shall be informed in advance by the contractor of his intension to stike any
formwork. While fixing the time for removal of formwork, due consideration shall be given to local conditions
that influence the setting of concrete and of concrete and of the materials used in the mix. Where filed
operations are controlled by strength tests of concrete the removal of the load supporting of sofit forms may
commence when concrete has attained strengthing props including the effect or any further additional of
loads. When field re-operations are not controlled by strength tests of concrete the vertical forms beams,
columns and walls may be removed after 2 days, The props of slabs and beams may be removed after 14 and
21 days respectively. All formwork shall be removed without causing any damage to the concrete. Cenetring
shall be gradually and uniformly lowered in such a manner as to permit the concrete to take stresses due to its
own weiht uniformly and gradually. Where internal metal ties are permitted, they or their removable parts shall
be extracted without causing any damage to the concrete. and remaining holes filled with mortar. No
permanently embedded metal part shall have less than 25mm. cover to the finished concrete surface. Where it is
intended to cleaned and made good to the satisfaction of the Engineer-in-charge.
23. Immediately after the removal of forms, all exposed bars or bolts passing through the Cement
concrete member to a depth of atleast 25mm, below the surface of the concrete and the resulting holes be filed
by cement mortar. All fins caused by form joints, all cavities produced by the removal of form ties and all other
holes and depressions, honey comb spots, broken edges or corners and other defects, shall be thoroughly
cleaned saturarated with water and carefully pointed and rendered true with mortar of cement and fine
aggregated mixed in the proportions used in the grade of concrete that is being finished and of as dry a
consistency as is possible to use. Considerable pressure shall be applied in filing and pointing to ensure thorugh
filling in all voids. Surface which have been pointed shall be kept moist for a period of twenty four hours. If
rock pockets / honey-combs, in the opinion of the Engineer-in-charge are of situ an extent or character as to
effect the strength of the structure materially or to endanger the life of the steel reinforcement, he may declare
the concrete defective and required the removal and replacement of the portions of the structure affected.
24. In the case of reinforced concrete work, workability shall be such that the concrete surrounds and
properly grips all reinforcement . The degree of consistency, which shall depend upon the nature of work and
methods of vibration of concrete shall be determined regular slump tests. Following slump shall be adopted for
different types of works.
Type of Work Slumps
Where vibrators are used where vibrators are not used
(i) Mass concrete in R.C.C. Foundations footings and 10mm to 25mm 80mm
retaining walls
(ii) Beams, slabs and columns simply reinforced 25mm to 40mm 100m to 120mm
(iii) Thin R.C.C. section or section with congested 40mm to 50mm 125mm to 150mm
25. For controlled concrete preliminary tests shall consist of three sets of separates tests, and in eah set,
tests shall be conducted on six specimens. Not more than one set of six specimens shall be made on any
particulars day. Of the six specimen in each set, three shall be tested at seven days and the remaining three at
days. The preliminary tests at 27 days are intended only to indicate the strength likely to th attained at 28 days.
work strength tests shall be made in accordance with IS: 516 EACH test shall be conducted on ten specimens
five of which shall be tested at seven days and the remaining five at 28 days. the samples of concrete shall be
taken on each day of concreting and cubes shall be made at the rate of one for every 5 cubic metre of concrete
or a part thereof. However, if concreting done in a day is than 15 cubic metre, the minimum number of cubes
can be reduced to 6 with the specific permission of the Engineer-in-charge. Similar works tests shall be carried
out when ever the qualify and grading of materials is changed irrespective of the quantity of concrete poured.
The number of specimens may be suitably increased as deemed necessary by the Engineer-in-charge when
procedure to tests given above reveals a poor quality of concrete and in other special cases.
26. The average strength of the group of cubes cast for each day shall not be less than the specified
works cubs strength 20 per cent of the cubes cast each day amy have values less than the specified strength,
provided the lowest value is not less than 85 per cent of the specified strength.
27. R.C.C. work shall have exposed concrete surface. Centering design and its erection shall be
approved by the Engineer-in-charge. One carpenter with helper will invariably be kept through out the period
of concreting. Movement of labour and other persons shall be totally prohibited over reinforcement laid in
position. for access to different parts, suitable mobile platforms shall be provided so that steel reinforcement in
position as not disturbed. for ensuring proper cover, mortar blocks of suitable sie shall be cast and tied to the
reinforcement. Timber, kapachi or metal pieces shall not be sued for this purpose Concreting of important
structural members shall always be done in the presence and under the supervision of department peson not
below the rank of Astt. Engineer/Addi. Astt. Engineer/ Overseer or is instructed by the Engineer-in-charge.
After removal of from work and sutteing, the executive Engineer shall inspect the work and satisfy by random
checks that concrete produced is of good quality. Plastering shall not be allowed to the exposed faces of
28. In reinforced concrete the volume occupied by reinforcement shall not be deducted. The slab shall
be measured as running continuously through and the beem as the portion below the slab.
29. All necessary labour, materials, equipment, etc., for sampling, preparing test cubes, curing etc. shall
be provided by the contractor. Testing of the materials and concrete may be arranged by the Engineer-in-
charge in an approved laboratory at the cost of the contractor.
30. The payment will be made on cmt. basis of the finished work.
31. The unit rate for concrete shall include the cost of all materials labour, tools and plant required for mixing,
placing in position, vibrating and compacting finishing as per directions of the Engineer-in-charge, curing and
all other incidental expenses for producing concrete of specified strength to complete the structure or its
components as shown on the drawings and according to these specifications. The rate shall also include the cost
of making fixing and removing of all centers and forms required for the work.
Providing Weep holes in RCC abutment,Return wall and retaining wall with 100 mm dia PVC
pipe and non-corrodible grating and geotextile, extending through the full width of the structure
with slope of 1V:20H etc. complete as per drawing and technical specification.
This work shall consist of providing and installing weep holes in RCC abutments, return walls, and retaining
walls at the locations shown on the drawings or as directed by the Engineer-in-Charge. The weep holes shall be
formed using 100 mm diameter PVC pipes, fitted with non-corrodible gratings at the exposed face and
geotextile filter material at the back face, and shall extend through the full width of the concrete or masonry
structure with a slope of 1 vertical to 20 horizontal towards the draining face. The purpose of the weep holes is
to relieve hydrostatic pressure from the backfill by allowing accumulated water to drain out from behind the
structure, thereby preventing distress to the wall and ensuring long-term stability. The work includes all
materials, labour, and incidental operations necessary for complete and functional installation.
The weep hole pipe shall be of 100 mm nominal diameter, made from rigid unplasticized polyvinyl chloride
(uPVC) conforming to the relevant Indian Standard for potable water and drainage applications. The pipe shall
be of adequate wall thickness to withstand the earth and construction loads without deformation, and shall be
free from cracks, blisters, or other defects. The pipe shall be cut to the required length to extend through the full
width of the structure.
2.2 Non-Corrodible Grating:
The exposed face of each weep hole shall be fitted with a non-corrodible grating or screen of approved design,
with openings sized to permit the free flow of water while preventing the entry of debris, rodents, or other
foreign matter that could block the drain. The grating shall be made from stainless steel or other approved non-
corrodible material and shall be securely fixed to the face of the structure.
2.3 Geotextile Filter:
A non-woven geotextile filter fabric of approved specification shall be provided at the back face of the weep
hole, wrapped around the pipe end or placed as a filter layer, to prevent the migration of fine soil particles from
the backfill into the weep hole while allowing water to pass through freely. The geotextile shall be durable,
chemically inert, and resistant to biological degradation.
3.1 Setting Out:
The locations of the weep holes shall be marked on the formwork or on the concrete face as per the approved
drawings or as directed by the Engineer-in-Charge. The spacing shall generally be as shown on the drawing,
with the lowest weep hole located approximately 150 mm above the low water level or ground level, whichever
3.2 Installation During Concreting (New Structure):
For weep holes to be formed during casting of the RCC structure, the 100 mm diameter PVC pipe shall be
securely fixed to the reinforcement or formwork at the marked location, with the required slope of 1V:20H
maintained towards the draining face. The pipe shall extend through the full width of the wall. The ends shall be
capped or plugged during concreting to prevent the ingress of concrete. After the concrete has set and formwork
is removed, the caps shall be removed, and the non-corrodible grating shall be fixed at the exposed face.
3.4 Geotextile Placement:
The geotextile filter fabric shall be wrapped around the back end of the PVC pipe or placed over the back face
of the weep hole opening before the backfill is placed, ensuring that all water flowing towards the weep hole
must pass through the geotextile. The geotextile shall be secured to prevent displacement during backfilling.
3.5 Grating Fixing:
The non-corrodible grating shall be fixed securely to the exposed face of the structure over the weep hole
opening, using stainless steel fasteners or other approved methods. The grating shall be flush with or slightly
recessed from the concrete surface as directed.
3.6 Protection and Cleaning:
After installation, the weep holes shall be checked to ensure they are clear and free-flowing. Any debris or
construction material blocking the holes shall be removed. The gratings and surrounding concrete shall be
4.0 QUALITY CONTROL
Parameter Acceptance Criteria
Pipe diameter 100 mm nominal
Slope 1V:20H towards draining face
Pipe extension Full width of structure
Grating material Non-corrodible (SS or approved)
Geotextile Non-woven, approved specification
Flow test Water flows freely without blockage
5.0 MODE OF MEASUREMENT AND PAYMENT
The work shall be measured on Each basis.
Providing and laying filter media 600mm thick as directed at the back of abutments, returns and
retaining wall as per detailed specifications.
1. Well graded pebbled or metal of 40mm. to 63mm. size shall be used. The grading and tolerances of metal of
pebbles shall be as under :-
Sr. No. of Size Range Sieve Designation Percentage by weight passing through
The size shall be 40mm. to 63mm. where in tolerance limit for over size shall be upto 15% and that for
lower size should be upto 15% and below 20mm. it shall be allowable upto 5% the filter Materials shall be
tightly placed to a thickness of not less that 600m. and provided over the entire surface behind abutments,
wings or return walls to the full height.
2. Materials shall be first stacked in boxed of 2 m 1.1/2m x 0.5 m. size on fairly level ground and measured.
3. The measurement for payment shall be made on sq.mt basis of finished No deduction shall be made for
4. The unit rate includes the cost of materials, scaffolding labour and tools to complete
Providing Pre-moulded asphalt filler joints as per drawings.
1. Open joints shall be constructed at the locations as directed by the Engineer-in-charge using a wood
strip, metal plate, other suitable material which is subsequently removed. When removing the material, care
shall be exercised to avoid chipping or breaking the corners of the concrete. The edge of the concrete at the
joints shall be edge finished. Reinforcement shall not extend across as open joint.
2. When rate for each type of bearings shall include the cost of supplying and fixing the bearings in
position complete. The rate shall also include the cost of samples and their testing as desired by the Engineer in
charge. The rate shall also include the cost of adhesives for fixing them.
3. The material used for filling expansion joint shall be bitumen impregnated felt which shall conform to
the requirement of IS: 1838, and shall be got approval from the Engineer-in-charge. The joint shall consist of
large pieces and assembly of small pieces to make up the required size shall be avoided.
4. The expansion joint shall be measured in running metres. Thickness of the expansion joint will be
to 25mm. Width of the expansion joint shall be equal to full depth of the slab.
5. The rate shall include the cost of all material, labour, equipments and other incidental charges for
fixing the joints complete in all respect as per these specifications and as shown on the drawings.
6. Payment shall made on Sq. mt basis
Providing G.I. 100mm. Diameter water spouts including necessary iron gratings as per drawings.
1. Material for the water spout shall be as mentioned in the item and shall be got approved from in
Engineer in Charge.
2. Water spout shall be 100 mm. internal dia. Cost iron grating shall be provided at the entry and shall be
fixed in the recess so as to be flush with the read surface. The quality and size of the grating shall be approved
from the Engineer-in-charge. The water spout shall project at-least 10 cm. outside the concrete and shall be
rigidly fixed in it. The grating and GI pipes shall be painted with two coats of anticorrosive black bitumen paint.
3. Measurement shall be per Number of water spout fixed. unit Rate included cost of material, labor and to
completed the works
Providing flood gauge marks on sub structure as per design including painting complete
1. The width of the flood gauge shall be 60cm. and will have caneri yellow background colour. The
flood gauge marking will be in 10cm. thick strips of alternative black and white colour. The width of the strip
shall be as under.
(a) At very 10cm 15cm width
(b) At every ½ cm 25cm width in black
(c) At every metre 35cm width in white
The lettering shall be in black colour and of 10cm height. The lettering shall show every metre and 1/2m
level. The lettering shall show based on either GST B.M. of Arbitrary B.M. as furnished by Engineering-in-
2. All the painting work shall be done in 3 coats. The paint shall be of approved make.
3. The measurement for payment shall be on running meter basis measured vertically in height.
4. The unit rate includes the cost of materials, labour, paitnting, equipment if any to complete the work.
Providing and casting in-situ controlled cement concrete M-400 for average 100 mm thick wearing
coat laid as directed including tamping, vibrating finishing curing and filling in joints with
bitumen complete.
Providing and casting in -situ controlled cement concrete of M 40 grade for RCC crash Barrier with
20 mm down coarse aggregate of the required size including formwork, shuttering, placing in
position, consolidation with mechanical vibrators curing finishing, deshuttering carefully,
marking good the damages, fixing embedment, inserts, pockets, wherever necessary as directed
and as per drawing with F3 type exposed concrete finish and formwork as directed by Engineer -
in -charge, etc. complete as per specification.
Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars for culverts
including setting and joining the pipes in C.M. 1:2 watering and laying (To level of slops of I.S.
458 / 1971 Class NP4 of following internal diameter. (vi) 1200 mm dia.
1. The work shall consist to furnishing and installing reinforced cement concrete pipe of the type dia metre
and length required at the location shown on the drawings or as ordered by the Engineer in charge.
2. Reinforced concrete pipe shall be NP4 type conforming to the requirements of IS : 458 and shall be of
dia as specified in the item each consignment of cement concrete pipes shall be inspected. If neccessary and
approved by the engineer in charge, either at the place of manufacture or at the site before theire incorporation
NP4, NP3, NP2 , NP1 pipes are used for RCC pipes where testing of pipes will not be feasible the contractors
will have to produce a certificate from the manufacturers on company;s letter head the given hereinafter form.
Production of such certificate will not however relieve the contractor from this responsibility of supplying pipes
of required standard and will have to bear the loss or damage caused to the work in account of defects found
subsequently during the execution It will also be necessary to purchase these pipes from manufacturere having
standard equipments for carring out various test as per IS : 458 at his factory.
FORM OF CERTIFICATE FOR NP4,NP3, NP2, NP1 PIPES
We.............................................................................. manufacture of RCC pipes prudude RCC pipes as per the
requirement of IS : 458 and also carry out the required test at our place. We have acquired equipments for
carrying out test and are prepared to carryout test at our factory sites.
We have experience of manufacturing of pies of ..................................................... years The pipes supplied by
3. No pipe shall be placed in position until the foundations have been approved by the engineer in charge,
Where two or more pipes are to be laid adjacent to each other they shall be separated by a distance equal to at
leat half the diameter of the pipe subject to minimum of 450mm. The laying of pipes on the prepared foundation
shall start from the outlet and proceed toward the inlet and be completed to teh specified lines and grades. The
pipes shall be fitted and matched so that when laid in works they form a culvert with a smooth uniform invert.
Any pipe found defective or damaged during laying shall be removed at there cost of contractor.
4. The pipes shall be jointed either by collar joint or by flush joint in the former case the collers shall be of
RCC 150 to 200 mm wide and having the same strength as the pipes to be jointed . Caulking space shall be
slightly wet mix of cement and sand in the ratio of 1:2 rammed with caulking irons. Before caulking the coller
shall be so placed that its centre coincides with that of pipe and an even annular space is left between the coller
and the pipes. Flush joint may be shaped to form a self centering joing with a joinin space 13 cm wide, The
joining space shall be filled with cement mortar, 1 cement 2. sand, mixed sufficiently dry to remain in position
when forced with a trowel or rammer, Care shall be taken to fill all voids and excess mortar shall be removed.
All joints shall be made with care so that their interior surface is smooth and consistent with the interior surface
of the pipes. After finishing, the joint shall be kept covered and damp for at least four day.
5. RCC pipe shall be measured along thir centre between thir inlet and outlet ends in linear metres.
6. The rate for the pipes shall include the cost of pipe including loading unloading handing storing laying
in position and joining complete.
7. Payment shall be made on Running metre basis.
Dismantling the existing structure including removing and stacking the dismantled materials as
and where directed. Rubble masonary.
Dismantling the existing structure including removing and stacking the dismantled materials as
and where directed. RCC Work.
This work shall consist of removing, as hereinafter setforth, existing culverts, bridges, pavement, kerbs
and other structures, like, railings, fences, utility services, manholes, catch basins, inlets etc., which are in place
but interfere with the new construction or are not suitable to remain in place. It shall include salvaging and
disposing of the resulting materials and backfilling the resulting trenches and pits.
Existing culverts, bridges, pavement and other structures which are within the road land and which are
designated for removal, shall be removed upto the limits and extent specified in the drawings or as directed by
Dismantling and removal operations shall be carried out preferably with locally available tools and
equipments and in such a manner as to leave undisturbed adjacent pavement, structures and any other work to
be left in place. Use of specialized tools and equipments by the agency shall be incidental to this item.
All operations necessary for the removal of any existing structure which endanger new construction
shall be completed prior to the start of new work.
202.2. Dismantling Culverts and Small Bridges
The structures shall be dismantled carefully and the resulting materials so removed as not to cause any
damage to the serviceable materials to be salvaged, the part of the structure to be retained and any other
properties or structures or utilities nearby.
Unless otherwise specified, the superstructure portion of culverts/bridges shall be entirely removed and
other parts removed below the ground level or as necessary depending upon the interference they cause to the
new construction. Removal of overlying or adjacent material, if required in connection with the dismantling of
the structures, shall be incidental to this item.
Where existing culverts/bridges are to be widened / strengthened or otherwise incorporated in the new
work, only such part or parts of the existing structure shall be removed as are necessary for execution of work
shown in drawings to provide a proper connection to the new work. The connecting edges shall be cut, chipped
and trimmed to the required lines and grade without weakening or damaging any part of the structure to be
retained. Due care should be taken to ensure that reinforcing bars which are to be left in place so as to project
into the new work as dowels or ties are not damaged during removal of concrete and protected against rusting or
Pipe culverts shall be carefully removed in such a manner as to avoid damage to the pipes.
Steel structures shall be carefully dismantled in such a manner as to avoid damage to members thereof,
if the structure is to be removed in a condition suitable for re-erection as specified in the drawings or directed by
the Engineer. All members shall be match marked with white lead paint by the Contractor before dismantling.
All loose parts like pins, nuts, loose plates, etc. shall be securely wired to adjacent members or packed in boxes
with proper markings for the ease of identification at the time of re-erection of the structure at later stage.
Timber structures shall be removed in such a manner as to avoid damage to such timber or lumber as is
designated by the Engineer to be salvaged after joint inspection by the Engineer and the Contractor or their
authorized representatives.
202.3. Dismantling Pavement and Other Structures
In removing pavements, kerbs, gutters, and other structures, like, railings, fences, manholes, catch
basins, inlets, etc. where portions of the existing construction are to be left in the finished work, the same shall
be removed to an existing joint or cut and chipped to a true line with a face perpendicular to the surface of the
existing structure. Sufficient removal shall be made to provide for proper grades and connections with the new
work as directed by the Engineer.
Concrete pavements, base courses in carriageway and shoulders, etc. designated for removal shall be
broken to pieces and stock piled at designated locations or as directed by the Engineer, if the material is to be
used later or otherwise, the Contractor shall arrange for disposal as stipulated in Clause 202.5.
202.4. Backfilling
Holes and depressions caused by dismantling operations shall be backfilled with excavated or other
approved materials and compacted to required density conforming to these specifications, or as directed by the
202.5 Disposal of Materials
All materials, obtained by dismantling, shall be the property of Government. Unless otherwise specified,
materials having any salvage value shall be placed in neat stacks of like materials within the right-of-way, as
directed by the Engineer with all lifts and upto a lead of 1000 m.
Pipe of culverts which are removed shall be cleaned and neatly piled on the right-of-way at spots
designated by the Engineer with all lifts and lead upto 1000 m.
Structural steel removed from old structures shall, unless otherwise specified be stored in a neat and
presentable manner in blocks at locations suitable for loading.
Timber or lumber salvaged from old structures shall have all nails and bolts removed therefrom and
shall be stored in neat piles in locations suitable for loading in the right-of-way.
All materials obtained from dismantling operations which cannot be used or auctioned shall be disposed
off as directed by the Engineer with all lifts and upto a lead of 1000 m.
202.6. Acceptance
Acceptance of dismantling and removal of salvaged material shall be based on visual inspection of the
work and backfilling and compaction shall comply the tests specified for such work in these Specifications.
202.7. Measurements for Payment
The work of dismantling structures shall be paid for in units indicated below by taking measurements
before and after, as applicable:
(i) Dismantling brick/stone masonry/concrete (Plain and reinforced) cu.m.
(ii) Dismantling flexible and cement concrete pavement cu.m.
(iii) Dismantling steel structures tonne
(iv) Dismantling pipes, guard rails, kerbs, gutters and fencing Linear m
(v) Utility services Nos./linear m
The Contract unit rates for the various items of dismantling including utility services shall be paid in full for
carrying out the required operations including all labour, materials tools, equipment, safeguards and incidental
expenditure for the satisfactory completion of the work. These rates will also include excavation and backfilling
where necessary to the required compaction and for handling, salvaging, piling and disposing of the dismantled
materials within all lifts and upto a lead of 1000 m.
Providing and filling in foundation with ordinary cement concrete M-150 mix and providing
necessary pin headers including formwork vibrating, rammering and curing complete.
Providing and laying in positions machine mixed Plain ordinary cement concrete M15 grade for
leveling course below foundation etc. at other places as directed by Engineer-in-charge with
graded broken stone aggregate from 6mm to 40 mm including tamping, vibrating, leveling and
curing complete with all formwork, dewatering wherever required including all materials,
labours, plants, machineries & tools,al lleads and lifts, etc.complete as per specification.
Providing and Casting in situ controlled Cement Concrete M-200 for Curtain Wall and cutt-off
walls including necessary shuttering laying, vibrating, ramming and curing complete.
Providing and casting in situ controlled cement concrete concrete M-300 for approach slab
including formwork curing and finishing complete.
Providing and casting in situ controlled cement concrete M-300 for R.C.C. return as per drawings
including centering shuttering, scaffolding where necessary, laying vibrating, curing and
finishing complete.(A) Height from 0.0 to 5.0 M. (1) Piers (2) Abutment (3) RCC return
Providing and Casting in situ controlled Cement Concrete M-300 for R.C.C. Raft and cutt-off walls
including necessary shuttering laying, vibrating, ramming and curing complete.
Providing and casting in situ controlled cement concrete M-300 for R.C.C. Top slab including
centering, scaffolding, curing and finishing complete.
Providing and Laying Controlled Cement concrete M-300 for CC Road including Curing & Cost of
Form Work, Finishing the Cement Concrete Road by Trimix Process inclusive of labour charges
for trimix vaccum dewatering process on cement concrte road by using dewatering pump, surface
floater, Surface vibartor and Groove cutting as per direction by engineer in charge & as per
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter
and other deleterious material which will either weaken the mortar or concrete or cause
efflorescence or attack the steel in R.C.C. Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in LS. 456-1978.
1. If required by Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall he made by means of standard cement tests for soundness, time of
setting and mortar strength as specified in LS. 269-1976. Any indication of unsoundness,
change in time of setting by 30 minutes or more or decrease of more than 10 per cent in
strength of mortar prepared with water sample when compared with the results obtained
with mortar prepared with distilled water shall be sufficient cause for rejection of water
2. Water for curing mortar, concrete or masonary should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise
interfere with the hardening of concrete during curing or those which produce
objectionable stains or other unsightly deposits on concrete or mortar surfaces.
3. Hard and bitter water shall not be used for curing.
4. Potable water will be generally found suitable for curing mortar or concrete.
Cement shall be Portland slag cement as per I.S. 269-1976 or Portland slag cement as pr I.S. 455-
mm Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from
injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali; salts organic,
matter, loam, mica or other deleterious substance and shall be got approved from the Engineer-
in-charge. The sand shall not contain wore than 8 percent of silt as determined by field test, if
necessary the sand shall be washed to make it clean.
nn Coarse Sand:
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed 3.0. The
sieve analysis of coarse shall be as under:
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
4.75 mm 100 600 micron
2.36 mm 90 to 100 300 micron 5-70
1.18 mm 70 to 100 150 micron 0-50
The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as under
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
1.18 mm 70 to 100 150 micron 0-10
1.1 Grit shall consist of crushed or broken stone and be hard strong, dense, durable, clean, of proper
gradation and free from skin or coating likely to prevent adhesion of mortar Grit shall generally be
cubical in shape and as far as possible flaky elongated pieces shall be avoided. It shall generally
comply with the provisions of I.S. 383-1970. Unless special stone of particular quarries is
mentioned, grit shall be obtained from the best black trap or equivalent hard stone as approved by
the Engineer-in-charge. The grit shall have no deleterious reaction with cement.
1.2 The grit shall conform to the following gradation as per sieve analysis:
Percentage by weight passing through
I.S. Sieve Designation sieve
1.3 The crushing strength of grit will be such as to allow the concrete in which it is used to built-up
the specified strength of concrete.
1.4 The necessary tests for grit shall carried out as per the requirements of I.S. 2386 (Parts I to VII)
1963, as per instructions of the Engineer-in-charge. The necessity of test will be
decided by the Engineer-in-charge.
Stone Aggregate for Concrete:
1.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard,
strong, dense, durable, clean and free from skin and coating likely to prevent proper adhesion
1.2 The aggregate shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned aggregates shall be machine crushed from the best black trap or
equivalent hard stone as approved. Aggregate shall have no deleterious reaction with cement.
The size of the coarse aggregate for plain cement concrete and ordinary reinforced cement
concrete shall generally be as per the table given below. Howevercase of reinforced cement
concrete the maximum limit may be restricted to 6 mm. less than the minimum lateral clear
distance between bars or 6 mm. less than the cover, whichever is smaller.
I.S. Percentage passing for single I.S. Seive Percentage passing for single
Seive sized aggregates of Nominal sized aggregates of Nominal
Note: This percentage may be varied some what by Engineer-in-charge when considered necessary for
obtaining better density and strength of concrete.
1.3 The grading test shall be taken in the beginning and at the change of source of materials.
The necessary test indicated in I.S. 383-1970 and I.S. 456-1978 shall have to be carried out to
ensure the acceptability. The aggregates shall he stored separately and handled in such a
manner as to prevent the intermixing of different aggregates. If the aggregates are covered
with dust, they shall be washed with water to make them clean
CONPLAST-P.211 water reducing concrete admixture & Recron-35 fibbers shall be of
approvedquality. Colpor-200 expansion joints materials shall be of approved quality.
[i] 200mm thicker M-250 grade concrete is being placed over the prepared sub-base Conplast
P.211 (Water reducing concrete admixture) @ 100 Mt. per bag of cement and Racron-3s
fibers Polyster fibre of Reliance or equivalent make at 125 Gms per bag of cement shall be
used in M-250 concrete mix. [The specification of concrete is as Given below]
[ii] Leveling of the surface is done using TREMIX surface vibrator. The vibrator runs over
channels, placed as per required level and slope and simultaneously level surface of the
[iii] Vacuum dewatering follows the leveling of concrete. The purpose of vacuum processing
is to provide quicker selling and high early strength by removing surplus water from the
concrete. The process is follows as per instruction of site Engineer in charge & attached guide
[v] Immediately after dewatering, the surface is floated with a skim power floater as
per instruction of Engineer-in-charge. The surface shall be prepared as per
requirements and instructions. For smoother surface requirement, the surface is
trowel with same machine mounted with trowel ling blades. If required floor
hardener "Nitoflor Hardtop" a Fostoc product shall be used at the rate of 3 to
Kg/Sqm to get hard wearing surface.Construction joints upto 1/4 of the slab depth
are cut afterwards. They give clear and straighter theoretical cracking line in the
case of unexpected stresses. m Groove cutting is done within 48 hours from
casting at the floor.
[vi] After surface vibrator and finishing the surface with power floater and trowel light
brooming on the surface, expansion joint size 20 x 200 MM shall be provided
with filling the expansion joints having size 20 x 20 MM by using COLPOR-200
as per manufacturers specification and directed by Engineer-in-charge. The
expansion joints filled with Nitoseal-200.
[vii] Making a construction joints by cutting of joints of size 3 MM x 20 MM by using
of concrete cutter machine construction joint are filled with "MITOSEAL-280" an
esoteric cold applied joint sealant, which ensures performance of expected
functions at the joints.
[viii] Concrete should be cured in normal way (Water pending) or the surface is covered
with a plastic sheet or gunny bags. In any method, the surface should be always
kept wet with water. Curing must be done for atleast 14 days or as per directed by
Engineer-in-charge.
[ix] The machineries used for the above process shall be of standard technical
specification attached separately herewith. (i.e. surface vibrator, vacuum
pump,suction mal top cover, filter pad, skim floater etc.)
[x] The Workmanship and process for vacuumed dewatering, water cement ratio
concrete placing, surface vibration and vacuum processing floating. Trowel ling
and curing shall be carried out as per attached literatures and as per instruction of
Engineer-in-charge.
[xi] The dowel bars of 30mm CRS reinforcement bars of 450mm long shall be field in
32mm dia G.I. pipe cap at free end with filling grade etc. in longitudinal joints at
30cm centre to centre
and transverse joints at 30 mt. interval as directed engineer in charge.
ATTACHED ADDED TECHNICAL SPECIFICATION
A. SURFACE VIBRATOR
Beam Lengths (meters) :4.2 meters Weights
Beam Spacing (mm) : 300 Beam
Vibrator Unit : Elecrtically operated on 3 Phase V, 415V, 50Hz. A.C. Supply
Power input (Walls) :
Vibrator (Vib/min) : 2860 Rated
current (Amp.) :1.5
Centrifugal Force (N) : 1350-4600 Weight
Drive : Electrically operated on 3 Phase V, 415V,50Hz. A.C. Supply
Pump Capacity (Lit/Min) : 1850 Max.
Vacuum(mm Hg) : 680(90%) Overall
Overall Width (With empty Tank):
SUCTION MAT TOP COVER
Length : 6 Width :
Length / Pieces (Mt.) :
D. SKIM FLOATER
Supply : 3 Phase V, 415V,50 Hz.A.C.Supply
Power (Kw) : 2.1/1.8
Current(Amp.) : 6/4
Motor Speed (rpm) : 3000/1500
Final Speed (rpm) : 115/57
Working Diameter (mm) :
Max.Reach (Meter) :
Diameter of Floating Disc(mm):985
Weight of Floating Disc(Kg) :16
MODE OF MEASUREMENT :
[i] The rate shall be include all materials, formworks, machineries and labour charges.
[ii] The rate shall be for a unit of One Cum
Specification of C.C.:
Controlled C.C.
1. For controlled concrete, design of the mix shall be approved after preliminary tests and all necessary
precautions shall be taken in its production to ensure that the required works cube strength is attained and maintained.
The controlled concrete shall be in eight grades designed as M.100, M. 150, M.200, M.250, M.300, M.350, M.400,
M.450 with the suffix ‘controlled’ added to it.
2. In the designation of a concrete mix, letter ‘M’ refers to the mix and the number to the specified 28 days works
cubs compressive strength of that mix on 150 m. cubes, expressed in kg/cm. where ordinary.
Portland cement conforming to IS:269 or Portland blast furnace cement conforming to IS:455 is used. the compressive
strength requirements for various grades of concrete shall be as given below on the next page:
Grade of Concrete Compressive works test strength in Kg. / cm2 on 150mm, cubes, conducted in
accordance with IS:
Min. at 7 days Min.at 28 days
NOTE: In cases the 28 days compressive strength specified in the above. Table shall alone be the criterion for
acceptance or rejection of the concrete.
Where the strength of a concrete mix, as indicated by tests, lies in between the strength for any two grades
specified in the above. Table such concrete shall be classified for all purposes as a concrete belonging to the lower or the
two grades between which its strength lies.
3. Concrete mix shall be designed on the basis of preliminary tests so as attain a strength at least 33 per cent
higher than that required on work tests. The proportions for ingredients chosen shall be such that concrete has adequate
workability for conditions prevailing on the work in question and can be properly compacted with the means available.
Except where it can be shown to the satisfaction of the Engineer-in- charge that supply of properly graded aggregate of
uniform quality can be maintained till the completion of work, grading of aggregate should be controlled by obtaining the
coarse aggregates in different sizes and bleeding them in the right proportions as required. Aggregates of different size
shall be stocked in separate stock piles. Required quantity of material shall be stock piled several hours, preferably a day,
before use. Grading of coarse and fine aggregate shall be checked as frequently as possible, frequency for a given job
being determined by the Engineer-in- charge to ensure that the suppliers are maintaining the uniform grading as approved
for samples used in the preliminary tests.
4. In proportioning concrete, the quantity of both cement and aggregate shall be determined by weight. Where the
weight of cement is determined by accepting the majors weight per beg, a reasonable number of bags shall be weighed
separately to check the net weight. Where cement is weighed from bulk stocks at site and not by bags, it shall be weighed
separately from the aggregates. Water shall either be measured by volume in calibrated tanks or weighed. All measuring
equipment shall be maintained in a clean, and serviceable condition. Their accuracy shall be periodically checked.
5. It is most important to keep the specified water cement ration constant and at its correct value. To this end,
moisture content in both fine and coarse aggregate shall be determined by the Engineer-in- charge according to the
weather conditions. The amount of mixing water shall then be adjusted to compensate for variations in the moisture
cement. For the determination of moisture content in the aggregates IS: 2386 (Part-III) shall be referred to. Suitable
adjustment shall also be made in the weights of aggregates to allow for the variation in weights of aggregates due to
variation in their moisture content Minimum quantity of cement to be used in controlled concrete shall not be less than
210 Kg. per cubic metre in plain concrete and not less than 300 kg/.per cubic metre in reinforced concrete structural
members. The minimum quantity of cement for professed concrete work shall not less than 360 kg/p[er cubic metre of
concrete nor shall it be more than 540 kg/per cubic metre of concrete.
6. Following shall be the maximum nominal size of coarse aggregate for the different items of work.
Sr. Item of construction Maximum nominal size of Coarse aggregate
(i) R.C.C. well curb, R.C.C. well steining and R.C.C. Piles 40mm
(ii) P.C.C. well steining. 63mm
(iii) Well cap or pile cap, solid type pires, abutments and wing- 40mm
walls, their pier caps.
(iv) R.C.C. works in cross girders, deck slab, wearing coarse, 20mm
kerb, light posts, blast, walls approach slab etc. and hollow
type piers, abutments wing-walls and their pier caps.
(v) R.C.C. bearings 20mm
(vi) For any other item of construction covered by items (i) to As specified on the drawing or as desired by
(v) above the Engineer-in- charge in case it is not
specified on drawing.
For heavily reinforced concrete members as in the case of ribs of main beams, nominal maximum size of
aggregate shall usually be restricted to 5mm less than the minimum laternal clear distance between the main bars of 5mm.
less than the minimum cover to the reinforcement whichever is the smaller.
7. Fine aggregate shall be clean, hard, coarse sand. It shall be free dust and such other substances. The sand be
get approved by the Engineer-in- charge.
8. All materials shall be stored as to prevent their deterioration of there quality and fitness for the work. Any
materials which has deteriorated or has been damaged or is otherwise considerd defective by the Engineer-in- charge
shall not be used in the works.
9. Cement shall be stored above the ground level in perfectly dry and watertight sheds. Wherever bulk storage
containers are used, their capacity should be sufficient to cater to the requirements at site and should be cleaned atleast
once every 3 to 4 months. the aggregates shall be stored in such a way as to prevent admixture of foreign materials.
Different sizes of fine or coarse aggregate shall be stored in separate stock piles sufficiently away from such other to
prevent intermixing the materials.
10. the water for mixing shall be potable water to satisfaction of the Engineer-in- charge. The quantity of water
shall be just sufficient to produce a dense concrete of required workability for the job.
11. For all work concrete shall be mixed in a mechanical mixer which alongwith other accessories shall be kept
in first class working condition and so maintained throughout the construction Mixing shall be continued till materials are
uniformly distributed and uniform colour of the entire mass is obtained and each indiua particle of the coarse aggregate
shows complete coating of mortar containing its proportionate amount of cement. In no case shall the mixing be done for
less than 2 minutes after all ingredients have been put into the mixer.
12. Mixer which have been out of use more than 30 minutes shall be thoroughly cleaned before putting in a new
batch. Unless otherwise agreed toi be the Engineer-in- charge, the first batch of concrete from the mixer shall contain
only two thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from
one type of cement to another.
13. The method of transporting and placing concrete shall be approved by the Engineer-in- charge. Concrete shall
be so transported and placed that no contamination, segregation or loss of its constituent materials takes place. All form
work and reinforcement contained in it shall be cleaned and made free from standing water, dust, snow or ice immediately
before placing of concrete. No concrete shall be placed in any part of the structure until the approval of the Engineer-in-
charge has been obtained.
14. If concreting is not started within 24 hours of the approval being given. It shall have to be obtained again from
the Engineer-in- charge. Concreting then shall proceed continuously over the area between construction joints. FResh
concrete shall not be placed against concrete which has been in position
for more than 30 minutes unless a proper construction joint is formed. Concrete shall be compacted in its final position
within 30 minutes of its discharge from the mixer-unless carried in properly design agitators, operating continuously when
this time shall be within hours of the addition of cement to the mix an within minutes of its discharge from the agitator.
Except where otherwise agreed to be the. Concrete shall be deposited in horizontal layers to a compacted depth of not
more than .5 metre when internal vibrator are used not exceeding . metre in all other cases.
15. Unless otherwise agreed to be the Engineer-in-charge concrete shall not be dropped into place from a height
exceeding metres. When trunking or chutes are used they shall be kept clean and used in such a way as to avoid
segregation. When concreting has to be resumed on a surface which has hardened, it shall be roughened, swept clean,
thoroughly wetted and covered with a 13mm. thick layer or mortar composed of cement and sand in the same ratio as in
the concrete mix itself. This 13mm layers of mortar shall be freshly mixed and placed immediately before placing of new
concrete. Where concrete has not fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or
bristle brushes, care being taken to avoid dislodgement of any particles of coarse aggregate. The surface shall then be
thoroughly wetted, all free water removed and then coated with neat cement grout. The first layers of concrete to be
placed on this surface shall not exceed 150mm. in thickness and shall be well rammed against old particular attention
being to comers and close sports.
16. All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators,
unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under water, where
vibrators can not be used. Sufficient vibrator in serviceable condition shall be kept at site so that spare equipment is
always available in the event break downs.
17. Immediately after compaction, concrete shall be protected against harmful effects of weather including rain,
running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be covered with
wet scking, hessian or other similar absorbant materials approved by the Engineer-in-charge soon after the initial set, and
shall be kept continuously wet for a period of not less than 14 days from the date of placement. Masonary work over the
foundation concrete may be started after 48 hours of its laying but the curing of concrete shall be continued for a
minimum period of 14 days.
18. Form work shall include all temporary or permanent forms required for forming the concrete, together with all
temporary construction required for their support. Formwork shall however be delived into following two distict
(1) Shuttering i.e. from work required for forming the concrete.
(2) Scaffolding i.e. form work required for supporting shuttering.
Forms for shuttering shall be constructed only, in metal suitably lined. Forms for scaffolding shall be constructed
of metal or timer. Both shuttering and scaffolding shall be substantial rigid construction and shuttering shall be true to
shape and dimensions show on the drawings. All bolls and riverts shall be counter-suck and well ground to provide a
smooth, plane surface.
19. Forms shall be mortar-tight and shall be made sufficiently rigid by the use of ties and bracings to prevent any
displacement or sagging between supports. They shall be strong enough to with stand all pressure ramming and vibration,
without deflection from the prescribed lines occurring during and after placing the concrete. Screw jacks or hardwood
wedges where required shall be provided to make up any settlement in the formwork either before or during the placing
of concrete. Suitable camber shall be provided in horizontal members of structure specially in long spans to conterate the
effects of any deflection. The formwork shall be so fixed as to provide for such camber, forms shall be so constructed as
to be removable in sections in the desired sequence. Without damaging the surface of concrete or disturbing other
sections. Unless otherwise specified or directed, chamber or filletlllls or sizes 25mm x 25mm shall be provided at all
angles of form work to avoid sharp comers.
20. The inside surface of shuttering shall, except in the case of permanent from work or where otherwise agreed
to be the Engineer-in-charge, be coated with an approved material to prevent adhesion of concrete to the form work.
Release agents shall be applied strictly in accordance with the manufacture instructions and shall not be allowed to come
into contact with any reinforcement or prestressing tendons
and anchorages. Different release agent shall not be used in form work for concrete which will be visible in the finished
21. Special measures shall be taken to ensure that the form does not hinder the shrinkage of concrete because
without these cracking could occur before the form work is removed. Wherever applicable arrangements must be made to
ensure that the form work does not restrain the shortening and hogging of the beams or slabs during tensioning of the
tendons. The form work should take due account of the calculated amount of positive or negative camber so as to ensure
the correct final shape of the structure having regard to the deformation due of false work, scaffolding or propping and
the instructure or deferred deformation due to various causes affecting prestressed structures. Where they are re-entrant
angles in the concrete sections the form work should be removed at these sections as soon as possible after the concrete
has set in order to avoid cracking due to shrinkage of concrete. Form work shall be tight enough to prevent any
appreciable loss of cement during vibrations, Suitable tolerance should be provided in the formwork, immediately before
concreting all forms shall be thoroughly cleaned. Contractor shall give the Engineer-in-charge due notice before placing
any concrete in the forms to permit him to inspect and accept the false work notice before placing any concrete in the
forms to permit him to inspect and accept the false work and forms as to their strength, alignment and general fitness, but
such unspection shall not relieve the contractor of his responsibility for safety of men, machinery , materials and for
results obtained.
22. The Engineer-in-charge shall be informed in advance by the contractor of his intension to stike any formwork.
While fixing the time for removal of formwork, due consideration shall be given to local conditions that influence the
setting of concrete and of concrete and of the materials used in the mix. Where filed operations are controlled by strength
tests of concrete the removal of the load supporting of sofit forms may commence when concrete has attained
strengthing props including the effect or any further additional of loads. When field re-operations are not controlled by
strength tests of concrete the vertical forms beams, columns and walls may be removed after 2 days, The props of slabs
and beams may be removed after 14 and 21 days respectively. All formwork shall be removed without causing any
damage to the concrete. Cenetring shall be gradually and uniformly lowered in such a manner as to permit the concrete to
take stresses due to its own weiht uniformly and gradually. Where internal metal ties are permitted, they or their
removable parts shall be extracted without causing any damage to the concrete. and remaining holes filled with mortar.
No permanently embedded metal part shall have less than 25mm. cover to the finished concrete surface. Where it is
intended to cleaned and made good to the satisfaction of the Engineer-in-charge.
23. Immediately after the removal of forms, all exposed bars or bolts passing through the Cement concrete
member to a depth of atleast 25mm, below the surface of the concrete and the resulting holes be filed by cement mortar.
All fins caused by form joints, all cavities produced by the removal of form ties and all other holes and depressions, honey
comb spots, broken edges or corners and other defects, shall be thoroughly cleaned saturarated with water and carefully
pointed and rendered true with mortar of cement and fine aggregated mixed in the proportions used in the grade of
concrete that is being finished and of as dry a consistency as is possible to use. Considerable pressure shall be applied in
filing and pointing to ensure thorugh filling in all voids. Surface which have been pointed shall be kept moist for a period
of twenty four hours. If rock pockets / honey-combs, in the opinion of the Engineer-in-charge are of situ an extent or
character as to effect the strength of the structure materially or to endanger the life of the steel reinforcement, he may
declare the concrete defective and required the removal and replacement of the portions of the structure affected.
24. In the case of reinforced concrete work, workability shall be such that the concrete surrounds and properly
grips all reinforcement . The degree of consistency, which shall depend upon the nature of work and methods of vibration
of concrete shall be determined regular slump tests. Following slump shall be adopted for different types of works.
Type of Work Slumps
Where vibrators are used where vibrators are not used
(i) Mass concrete in R.C.C. Foundations footings and 10mm to 25mm 80mm
retaining walls
(ii) Beams, slabs and columns simply reinforced 25mm to 40mm 100m to 120mm
(iii) Thin R.C.C. section or section with congested 40mm to 50mm 125mm to 150mm
25. For controlled concrete preliminary tests shall consist of three sets of separates tests, and in eah set, tests
shall be conducted on six specimens. Not more than one set of six specimens shall be made on any particulars day. Of
the six specimen in each set, three shall be tested at seven days and the remaining three at 28 days. The preliminary tests
at 27 days are intended only to indicate the strength likely to th attained at 28 days. work strength tests shall be made in
accordance with IS: 516 EACH test shall be conducted on ten specimens five of which shall be tested at seven days and
the remaining five at 28 days. the samples of concrete shall be taken on each day of concreting and cubes shall be made at
the rate of one for every 5 cubic metre of concrete or a part thereof. However, if concreting done in a day is than 15 cubic
metre, the minimum number of cubes can be reduced to 6 with the specific permission of the Engineer-in-charge. Similar
works tests shall be carried out when ever the qualify and grading of materials is changed irrespective of the quantity of
concrete poured. The number of specimens may be suitably increased as deemed necessary by the Engineer-in-charge
when procedure to tests given above reveals a poor quality of concrete and in other special cases.
26. The average strength of the group of cubes cast for each day shall not be less than the specified works cubs
strength 20 per cent of the cubes cast each day amy have values less than the specified strength, provided the lowest value
is not less than 85 per cent of the specified strength.
27. R.C.C. work shall have exposed concrete surface. Centering design and its erection shall be approved by the
Engineer-in-charge. One carpenter with helper will invariably be kept through out the period of concreting. Movement of
labour and other persons shall be totally prohibited over reinforcement laid in position. for access to different parts,
suitable mobile platforms shall be provided so that steel reinforcement in position as not disturbed. for ensuring proper
cover, mortar blocks of suitable sie shall be cast and tied to the reinforcement. Timber, kapachi or metal pieces shall not
be sued for this purpose Concreting of important structural members shall always be done in the presence and under the
supervision of department peson not below the rank of Astt. Engineer/Addi. Astt. Engineer/ Overseer or is instructed by
the Engineer-in-charge. After removal of from work and sutteing, the executive Engineer shall inspect the work and
satisfy by random checks that concrete produced is of good quality. Plastering shall not be allowed to the exposed faces of
28. In reinforced concrete the volume occupied by reinforcement shall not be deducted. The slab shall be
measured as running continuously through and the beem as the portion below the slab.
29. All necessary labour, materials, equipment, etc., for sampling, preparing test cubes, curing etc. shall be provided by
the contractor. Testing of the materials and concrete may be arranged by the Engineer-in-charge in an approved
laboratory at the cost of the contractor
Providing and placing in position FE 550D bar reinforcement for following items including
cutting bending hooking and tying complete as per detailed drawing. For Foundation & Sub-
Providing and placing the reinforcement in designed position, fixing, erecting or lowering in
position TMT bars Fe500 D grade conforming to IS1786 for Pipe Encasing etc all categories &
depth, at all levels. The rates includes for supply, loading, unloading, transporting to site, cutting,
bending, hooking, placing, tying in position with contractor's own black annealed binding wire,
welding, etc. Welding and supporting inposition to ensure line sand levels during concreting,
maintaining proper cover / spacing, all leads & lifts, etc.
Providing and placing in position FE 550D TMT bar reinforcement including cutting, bending,
hooking, and tying complete as per detailed drawing.(A) Solid Slab.
Providing and fixing in position FE 500D TMT bar reinforement including cutting, bending and
tying complete as per detailed drawings. (A) R.C.C. Kerb. (B) R.C.C. Footpath. (C) R.C.C. Approach
slab.(D) Wearing Coat.
2.00 Materials :- T.M.T. shall conform to IS : 1786-FE 500 Mild steel bidning wires shall conform to the
2.1 The work shall consist of furnishing and placing reinforcement of the shape and dimensions shown on
the drawing or as directed by the Engineer-in-charge.
2.2 Steel shall be clean and free from loose rust mill scale at the time of fixing in position and subsequent
2.3 Reinforcing steel shall conform accurately to the dimensions given iron bar bending schedules shown on
relevant drawing. Bar shall be bent cold to the specified shape and dimensions or as directed by the Engineer-
in-charge using a proper bar bender, oprated by hand or power ro attain proper reduis of bends. Bars shall not be
bent or straightened in manner that will injure the material. Bars bend during transporting or handaling shall be
straightened before use on work ; they shall not be invariably be provided. The dius of the bend shall not less
than twoce the diametre of the round bar and length of the straight part of the beyond the end of the curve shall
be at lest four lest four times the diametre of the round bar. In the case which are not round and in the case of
deformed bars, the diametre shall be taken as the diametre of a circle having a equivalent effective area. The
work shall be suitably encased tp prevent any splitting of the concrete.
2.4 All reinforcement bars shall be accurately placed in exact on the drawings, and shall be securely held in
position during placing of concrete by annealed binding wire not less than 1mm, in size and confirming to IS :
280 and by using stay blocks or metal chairs, spacer, meteal hangers, supporting wires or other approved device
at sufficiently close intervals. Bars will not be allowe to sag between supports or displaced during concreting or
any of their operations over the work. All devices used for positioning shall be non-corrodible material.
Wooden and metal supports will not extend to the surface of concrete except where shown on the drawings.
Placing bars on layers of freshly laid concrete as the work progress or adjusting bar will not be allowed. Pieces
of broken stone of brick and wooden blocks shall bot be used. Layers of bars shall be separetly by spacer bars,
precast mortar block, or other approved device. Reinforcement after being placed in position shall be
maintained in clean condition until completely embedded in concrete. Special care shall be exercised to prevent
any displacement of reinforcement in concrete already placed. To protect reinforcement from corrosion,
concrete cofer shall be prodied as indicated on the drawing. All bars protruding from concrete and to which
other bars are to spliced and which are likely to be exposed for an indefinite period shall be protected by a thick
coat of neat cement grout.
2.5. Bars crossing each other, where required shall be secured by binding wire (annealed) of size not less
than 1 mm. in such a manned that they do not slip over each other at the time of fixing and concreting.
2.6. As far as possible, bars of full length shall be used. In case this is not possible, overpalling of bars shall
be done as directed by the engineer-in-charge. When particable, overlapping bar shall not touch each other, but
be kept apart by 25mm or 1.25 times the maximum size of the coarse aggregate which ever in greater, by
concrete between them, Where not feasible, overlapping bars shall be bound with annealed steel wire, not less
than 2mm thickness twisted right. The overlapps shall be staggered for different bars and loacated at points,
along the span where neither shear not bending movement is maximum. 2.7. Whenever indicated on the
drawings or desired by the Engineer-in-charge, bar shall be joined by couplings which shall have a cross-section
sufficient to transmit the full strength of bars. The end of the bars that are joined by coupling shall be uuset for a
sufficient length so that the effective cross- section a the base of threads shall be standard white worth hreads.
Steel for cpuling shall conform to IS :
2.8. When permitted or specified on the drawings joints of reinforcement bars shall be but welded so a
transmit their full strength. Welded joints shall preferably be located at points where steel will not be subject to
more than 75 per cent of the maximum permissible stresses and selds so toggered that at any one section not
more than 20 per cent of the rods are welded. Only electric are welded using a process which excluded air from
the molten metal and conforms to any or all there special provisions for the work will be accepted. Suitable
means shall be provided for holding the bars securely in postion during welding. It must be ensured that no
voids are left in welding and when welding is done in 2 or 3 stages, previous surface shall be cleaned properly.
Ends of the bars shall be cleaned of all loose scale, rust grease, paint and other foreign matter before welding.
Only competent welders shall be employed on the work. The M.S. electodes used for welding shall conform to
IS : 814 welded pieces of reinforcement shall be tested. Specimen shall be taken from the actual site and their
number and frequency to test shall be as directed by the Engineer-in-charge.
3.00 Mode of Measurement and Payment
The rate shall be for a unit of One M.T
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier
comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed
on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m
below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all
fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause
This work shall consist of providing and erecting a "W" type metal beam crash barrier of Type A, comprising a
3 mm thick corrugated sheet metal beam rail fixed at 70 cm above road/ground level, mounted on ISMC series
channel vertical posts of 150 x 75 x 5 mm spaced at 2 m centre to centre. The posts shall be 1.8 m high, with
m below ground/road level. All steel parts and fitments shall be galvanised by the hot dip process, and all
fittings shall conform to IS:1367 and IS:1364. The metal beam rail shall be fixed on the vertical post with a
spacer of channel section 150 x 75 x 5 mm, 330 mm long, complete as per clause 811 of the MoRTH
specifications . The crash barrier shall be erected true to line and grade, with posts vertical within the specified
tolerance, and shall be measured by linear metre of completed length as accepted in place .
2.1 Metal Beam Rail:
The metal beam rail shall be a "W" profiled corrugated beam made from cold rolled steel strip of 3.0 mm
thickness, using high strength steel conforming to IS 5986 Fe 510 grade or equivalent, with minimum ultimate
tensile strength of 483 MPa, minimum yield stress of 345 MPa, and minimum elongation of 12% in 50 mm. The
beam after forming shall have a formed width of 330 mm and depth of 83 mm, with punched holes for fixing as
specified in the drawings .
2.2 Vertical Post and Spacer:
The vertical post shall be made from cold rolled steel channel of 5 mm thickness, ISMC series, size 150 x 75 x
5 mm, conforming to IS 5986 grade Fe 360 or equivalent as specified in the drawings. The spacer shall be of
channel section 150 x 75 x 5 mm, 330 mm long, with cross section and material same as that of the post .
2.3 Fittings and Fasteners:
All bolts, nuts, and washers shall conform to IS 1367 and IS 1364, and shall be hot dip galvanised as per IS
1367 (Part 13) . The minimum mass of zinc coating shall be 610 g/m² as per IS 4759 .
2.4 Galvanising:
All steel parts and fitments shall be galvanised by the hot dip process, with the zinc coating applied after
fabrication, ensuring uniform coverage and freedom from bare spots.
3.1 Setting Out:
The alignment of the crash barrier shall be set out as per the approved drawings, with the centre line of the posts
marked at 2 m intervals. The posts shall be vertical, with a tolerance not exceeding 6 mm in a length of 3 m .
3.2 Post Installation:
The posts shall be embedded in the ground to a depth of 1.1 m below road/ground level, with the top of the post
at 1.8 m above ground level. The post foundation shall be as per the approved drawing, and the posts shall be
checked for plumb and alignment before the foundation is backfilled and compacted.
3.3 Rail and Spacer Fixing:
The spacer channel section shall be fixed to the vertical post, and the "W" metal beam rail shall be fixed to the
spacer using the specified bolts, nuts, and washers. The rail shall be at 70 cm above road/ground level, and the
connections shall be tightened to the specified torque. The completed barrier shall be checked for true line and
4.0 MODE OF MEASUREMENT AND PAYMENT
The work shall be measured on Running Meter (RM) basis.
Providing & laying dry Stone pitiching (each stone weight not less than 40kg)on slope including
hand packing, filling joints as directed by the engineer incharge for all lead & lift.
This work shall consist of providing and laying dry stone pitching on slopes, using stones each weighing not
less than 40 kg, including hand packing, filling of joints with approved material, and all incidental works
complete as per drawings and direction of the Engineer-in-Charge, for all leads and lifts. Dry stone pitching is a
protective layer of stones placed on earthen slopes to prevent erosion caused by rain, flowing water, or wave
action, and the stones are packed without mortar, relying on their weight and interlocking arrangement to
remain stable, with the joints filled with smaller stones or approved material to prevent the washing out of the
underlying soil. The work shall be carried out in a workmanlike manner in accordance with the relevant
MoRTH specifications and as directed by the Engineer-in-Charge.
Parameter Specification
Hard, dense, unilaminated natural stone (granite, basalt, quartzite, or equivalent) of approved
Weight Each stone shall weigh not less than 40 kg
Sound, durable, free from cracks, weathering, and other defects; stones subject to marked
deterioration by water or weather shall not be accepted
Roughly cubical or rectangular with at least one flat face for the exposed surface, angular for proper
2.2 Joint Filling Material:
Smaller stones, stone chips, or approved granular material shall be used for filling the joints between the
pitching stones, as directed by the Engineer-in-Charge. The chips or spalls used, including voids in the dry stone
masonry, shall not be more than 20% of the stone masonry by volume.
3.1 Preparation of Slope:
The slope shall be trimmed to the required slope and profile and compacted. All loose material, vegetation, and
debris shall be removed. The surface shall be trimmed to ensure uniform contact with the pitching stones.
3.2 Laying of Stone Pitching:
The stones shall be laid on the prepared slope starting from the bottom (toe) and progressing upwards. Each
stone shall be placed with its flat face exposed and its longer axis perpendicular to the slope. Stones shall be
hand-packed tightly against each other to ensure maximum interlocking. Where the full depth of pitching can be
formed with a single stone, the stones shall be laid breaking joints and all interstices shall be filled in with spalls
of the proper size and wedged in with hammers to ensure tight packing. The top surface of the pitching shall be
smooth, and the finished surface shall present an even, tight appearance with no stones varying by more than
mm from the surface lines and levels. The thickness of pitching, measured at right angles to the surface, shall
not be less than the specified thickness.
3.3 Filling of Joints:
The joints between the pitching stones shall be filled with smaller stones, stone chips, or approved material as
directed. The filling material shall be rammed and packed tightly to prevent the washing out of the underlying
3.4 Lead and Lift:
All materials shall be transported to the site of work for all leads and lifts as required, and the rate shall include
the cost of all leads and lifts.
4.0 QUALITY CONTROL
Parameter Acceptance Criteria
Stone weight Not less than 40 kg per stone
Stone quality Hard, durable, free from cracks and defects
Slope profile As per drawing, uniform and compacted
Pitching thickness As specified, measured at right angles to the surface
Joint filling Tightly packed, no voids
Surface evenness No stone varying by more than 25 mm from surface lines and levels
5.0 MODE OF MEASUREMENT AND PAYMENT
The work shall be measured on Cubic Meter (Cum) basis.
Supplying & Filling around the pipes with Sand including dressing, tempering etc. complete.
This work shall consist of supplying sand of approved quality and filling it around pipes laid in trenches,
including dressing, tempering, and all incidental works complete, as per drawings and direction of the
Engineer-in-Charge. The sand filling provides a uniform, well-compacted bedding and surround for the pipes,
protecting them from differential settlement, point loading, and damage during backfilling, while also
allowing proper drainage around the pipe barrel.
Parameter Specification
Type Clean, coarse sand (natural river sand or approved crushed sand)
Standard Conforming to IS 383 (Zone II or III)
Quality Free from clay, silt, organic matter, salts, and deleterious materials
Silt content Not more than 5% by weight
Source Approved quarry/borrow area, brought from outside
Water shall be clean and potable, free from injurious amounts of oils, acids, alkalis, salts, and organic
impurities, conforming to IS
3.1 Preparation of Trench:
The trench bottom shall be cleaned of all loose material, debris, and standing water, and shall be levelled and
compacted to the required grade and profile before placing the sand.
3.2 Placing of Sand below the Pipe:
Sand shall be placed in the trench bottom to the specified thickness (typically 100 mm to 150 mm) to form the
bedding for the pipe, and shall be levelled and lightly compacted to provide uniform support along the full
length of the pipe barrel.
3.3 Filling around the Pipe:
After the pipe is laid and jointed, sand shall be placed on both sides of the pipe and compacted in layers not
exceeding 150 mm, ensuring that the sand fills all voids beneath the haunches and around the pipe barrel
without displacing the pipe or damaging the joints. The filling shall be brought up evenly on both sides of the
pipe to prevent lateral movement.
The sand filling shall be dressed to the required level, slope, and profile as shown on the drawings or as
directed, and the surface shall be trimmed neatly to receive the subsequent backfill or cushion layer.
3.5 Tempering and Compaction:
Each layer of sand shall be tempered with water to achieve optimum moisture content and compacted
thoroughly by hand tamping or mechanical plate compactor, care being taken not to damage the pipe or
disturb its alignment and grade.
3.6 Protection:
The sand-filled portion shall be protected from contamination by silt, clay, or debris, and from erosion by
surface water until the overlying backfill is placed.
4.0 QUALITY CONTROL
Parameter Acceptance Criteria
Sand quality Clean, coarse, silt ≤ 5%
Bedding thickness below pipe As per drawing
Side filling Even on both sides, no voids under haunches
Layer thickness Not exceeding 150 mm
Compaction Properly compacted, pipe not displaced
Finished level/profile As per drawing
5.0 MODE OF MEASUREMENT AND PAYMENT
The work shall be measured on Cubic Meter (Cum) basis.
Marking out the center line of the bridge and various other component structures and complete
lining out and levelling with theodolite, levels including constructing necessary masonry pillars
for line and levels and establishing necessary bench mark etc, complete as directed including the
cost of all materials & labour charges etc. complete.
This work covers marking out the centre line of the bridge and various other component structures, complete
lining out and levelling using theodolite and auto levels, including construction of necessary masonry pillars for
reference lines and levels, establishing permanent bench marks, and all incidental works complete as directed
by Engineer-in-Charge.
2. APPLICABLE STANDARDS
IS 1191: Code of Practice for Setting Out of Bridges
IRC 5: Standard Specifications for Road Bridges (for reference)
MORTH Specifications (Clause 902 - Survey and Setting Out)
IS 3112: Recommendations for Survey and Alignment of Engineering Projects
3. EQUIPMENT REQUIREMENTS
Equipment Specification
Theodolite Digital/Electronic theodolite with minimum 20" accuracy
Auto Level With minimum 1.5mm/km accuracy
Total Station (If required) with EDM accuracy ±2mm + 2ppm
Levelling Staff 4m telescopic/rigid with mm graduations
Measuring Tape 30m/50m steel tape, calibrated
Ranging Rods 2m to 3m length with colour bands
Prisms/Reflectors For Total Station (if used)
GPS/DGPS (If required for primary control)
All equipment shall be calibrated with valid certificates.
4.1 Reference Bench Mark Establishment:
Identify permanent features (ROCK CUT, BM pillar, etc.) near site
Establish minimum 2 permanent bench marks (BM) away from construction zone
BM pillars as per standard design (masonry/concrete)
Record Reduced Levels (RL) with reference to GTS/MSL or permanent datum
Document BM locations with description and photographs
4.2 Masonry Pillars for Line and Levels:
Parameter Requirement
Size 300mm × 300mm × 600mm (above ground)
Foundation 450mm × 450mm × 600mm deep
Material Brick masonry / Cement concrete
Top Finish CC 1:2:4 with smooth surface
Marking Brass pin / chiselled mark at centre
Protection Painting with white/yellow bands
Location Beyond construction zone (safe from disturbance)
Construct pillars at strategic locations (both banks, extension lines)
Minimum 4 pillars for bridge centre line control
Protect pillars during construction
4.3 Bridge Centre Line Marking:
Establish base line between permanent reference pillars
Mark centre line of bridge using theodolite/total station
Extend centre line to both approaches (minimum 50m beyond abutments)
Fix reference points at 10m to 20m intervals along centre line
Mark with wooden pegs / nails / survey nails in concrete
4.4 Component Structure Marking:
Mark out following components as per approved drawing:
Component Marking Details
Abutments Face lines, back lines, wing wall positions
Piers Centre points, base outline, orientation
Foundations Excavation limits, pile locations (if any)
Approaches Alignment, width, transitions
Return walls Location and alignment
Guide bunds Centre line and toe lines
4.5 Level Transfer:
Transfer RL from bench marks to all component locations
Establish temporary benchmarks (TBM) near each foundation
Record levels for:
o Founding levels for foundations
o Pier/Abutment top levels
o Bearing pedestal levels
o Girder bottom levels
o Roadway/formation levels
4.6 Control Network:
Establish primary control network (traverse) around site
Secondary control points near each major component
All control points to be inter-visible
Document coordinates and levels of all control points
5. SETTING OUT TOLERANCES
Component Tolerance
Centre line alignment (plan) ± 5mm over 50m length
Foundation plan position ± 10mm
Pier/Abutment plan position ± 5mm
Level transfer (BM to TBM) ± 5mm per km
Founding levels ± 10mm
Bearing pedestal levels ± 3mm
Verticality (plumb) 1:1000 (1mm per metre height)
Angle measurement ± 10 seconds
6. DOCUMENTATION TO BE MAINTAINED
Document Details
BM Register Description, RL, date, established by
Control Point Register Coordinates, levels, location sketch
Daily Setting Out Log Work done, instruments used, readings
Reference Pillar Record Location, photograph, RL
As-Built Coordinates Final recorded positions of components
Check Measurement Reports Verification by Engineer
7. CHECKING AND VERIFICATION
All setting out to be checked by Engineer before excavation/concreting
Independent check by another surveyor for critical points
Maintain check registers signed by surveyor and Engineer
Any discrepancy to be rectified before proceeding
8. MEASUREMENT & PAYMENT
On L.S. basis
Providing and fixing Precast cement concrete Hectometer as per IRC type design incl. painting,
lettering etc. fixing in C.C. 1:5:10.
The work covers the supply, painting, lettering and fixing of Hectometer stone.
The dimensions of the stones and the size, colour, arrangement of letters and scripts shall be as per
I.R.C. - 26 type designs. The Hectometer stone shall be precast cement concrete 1:2:4 for which relevant
specification shall be followed. The stone shall be bedded into the ground with adequate foundation in C.C.
1:5:10 as indicated in the drawings or in the relevant I.R.C. Specifications or as directed by the Engineer-in-
charge. The orientation and location of the stones shall be as indicated in the drawings or in the relevant I.R.C.
Specifications or as directed by the Engineer-in-charge.
MEASUREMENT OF PAYMENT
The measurement will be taken in Numbers of Hectometer stone fixed at site fixing in C.C. 1:5:10.
The contract unit rate for Hectometer stones shall be payment in full compensation for furnishing, all
labour, materials including providing necessary reinforcement, tools, equipment and making the stones, painting
and lettering and fixing at site and all other incidental costs necessary to complete the work to the specifications
Providing & Fixing Guardstone as per IRC type design including white washing etc complete.
Fixing in CC 1:5:10.
1. The guard stone shall be of approved quality and of 20 cm x 15 cm size and its length shall not
be les than 75 cms. The top portion shall be rounded. The top 38 cm shall be chisel dressed on all sides. The
size shape and dimensions of the guard stones shall be exact and shall be nearly dressed and finished.
2. The guard stone shall be fixed in position as directed by the Engineer in charge in in C.C. 1:5:10
which will consist of one part of cement, live part of good sand and ten parts of good brick bats. Rate includes
all labour and curring etc. necessary for concrete. If the guard stone shall be fixed in wearing coat. the
equivalent volume covered by the guard stones shall be given three coats of white wash. The measurement for
payment shall be per number of guard stone fixed in position.
3. Unit rate of guard stone includes the cost of all materials , laboures , tools, fixing & white
washing as directed by the Engineer in charge.
Providing and fixing ordinary Kilometer stone of pre-cast C.C. 1:2:4 including necessary
reinforcement as per I.R.C. type design in C..C. 1:4:8 including painting lettering etc. complete.
(For N.H., S.H. and M.D.R.)
1. Kilometre stone shall be of approved quality and shall be either black Rajula stone or of precast
1:2:4 RCC specified in the item.
2. The size, manner of fixing, painting and lettering of K.M. stone shall conform specification as
per IRC - 8 (Type design for Highway kilometre sones) The fixing of K.M. stone shall be carried out in
ordinary concrete of grade specified in the item using hand broken metal field metal or gravel, The
measurement for payment shall be made per No. of K.M. stone fixed in position.
3. Unit rate for kilometre alone includes the cost of all materials labours tools fixing finishing
curing lettering and painting as directed by the engineer in charge.
Road marking with hot applied thermoplastic paints with reflectorislng glass beads on bitumin
surface. Providing and laying a hot applied thermoplastic compound 2.5 mm thick includ lng
reflectorlsing glass beads@ 2SOgms per sqm area, thickness of 2 .5mm is excluding of surface
applied, glass beds as per lRC:35·2015. The finished surface to be level, uniform and free from
streaks and holes. zebra patta /bump patta lane/center line/ edge line/cut patta.The white color
marking should provide luminance coefficient on cement road shall be min 130 mcd/m2/lux and
Asphalt road shall be min 100 mcd/m2/lux during the service life during the day time.The marking
should meet the performance criteria for night time reflectivity, wet reflectivity and skid
resistance as mentioned In the section-15 of IRC 35·2015 Warranty for reflectivity shall be for two
803.4 Hot Applied Thermoplastic Road Marking
803.4.1 Thermoplastic Material
803.4.1.1 General
The thermoplastic material shall be homogeneously composed of aggregate, pigment, resins and glass
reflectorizing beads. The colour of the compound shall be white or yellow (IS colour No. 356) as
specified in the drawings or as directed by the Engineer.
803.4.1.2 Requirements :
I. Composition: The pigment, beads, and aggregate shall be uniformly dispersed in the resin. The material shall be
free from all skins, dirt and foreign objects and shall comply with requirements indicated in Table 800-9.
Table 800-9 : Proportions of Constituents of Marking Material (Percentage by Weight)
Component White Yellow
Binder 18.0 min. 18.0 min.
Glass Beads 30 - 40 30 -
Titanium dioxide 10.0 min. -
Calcium Carbonate and I nert Fillers 42.0max. See Note Below
Yellow pigments - See Note Below
Note: Amount of yellow pigment, calcium carbonate and inert fillers shall be at the option of the
manufacturer, provided all other requirements of this Specification are met.
II. Properties: The properties of thermoplastic material, when tested in accordance with ASTM 036/BS-3262-(Part I),
shall be as below:
White: Daylight luminance at 45°-65 percent min. as per AASHTO M249
Yellow: Daylight luminance at 45°-45 percent min. as per AASHTO M249
b. Drying time: When applied at a temperature specified by the manufacturer and to the required thickness, the
material shall set to bear traffic in not more than 15 minutes.
c. Skid resistance: not less than 45 as per BS:6044.
d. Cracking resistance at low temperature: The material shall show · no cracks on application to concrete blocks.
e. Softening point: 102.5°C ± 9.5°C as per ASTM D
f. Yellowness index (for white thermoplastic paint): not more than 0.12 as per AASHTO M
III. Storage life : The material shall meet the requirements of these Specifications for a period of one year. The
thermoplastic material must also melt uniformly with no evidence of skins or unmelted particles for the one year
storage period. Any material not meeting the above requirements shall be replaced by the manufacturer/supplier/
IV. Reflectorisation : Shall be achieved by incorporation of beads, the grading and other properties of the beads shall
be as specified i~ Clause 803.4.2.
V. Marking: Each container of the thermoplastic material shall be clearly and indelibly marked with the following
1) The name, trade mark or other means of identification of manufacturer
2) Batch number
3) Date of manufacture
4) Colour (white or yellow)
5) Maximum application temperature and maximum safe heating temperature.
VI. Sampling and Testing : The thermoplastic material shall be sampled and tested in accordance with the appropriate
ASTM/BS method. The Contractor shall furnish to the Engineer a copy of certified test reports from the
manufacturers of the thermoplastic material showing results of all tests specified herein and shall certify that the
material meets all requirements of this Specification.
803.4.2 Reflectorizing Glass Beads
803.4.2.1 General
This Specification covers two types of glass beads to be used for the production of reflectorised pavement
Type 1 beads are those which are a constituent of the basic thermoplastic compound vide Table 800-9 and Type
2 beads are those which are to be sprayed on the surface vide Clause 803.6.4.
803.4.2.2 The glass beads shall be transparent, colourless and free form milkiness, dark particles and
excessive air inclusions.
These shall conform to the requirements spelt out in Clause 803.4.2.3.
803.4.2.3 Specific Requirements
a) Gradation: The glass beads shall meet the gradation requirements for the two types as given in Table 800-10.
TABLE 800-10: GRADATION REQUIREMENTFOR GLASS BEADS
Percent Retained
850 micron 5 to 20 0 to
600 micron - 5 to
425 micron 65 to 95 -
300 micron - 30 to
180 micron 0 to 10 10 to
Below 180 Micron 00 to
b) Roundness : The glass beads shall have a minimum of 70 percent true spires.
c) Refractive index : The glass beads shall have a minimum refractive index of 1.50.
d) Free flowing properties : The glass beads shall be free of hard lumps and clusters and shall dispense
readily under any conditions suitable for paints striping. They shall pass the free flow test.
803.4.2.4 Test Methods
The specific requirements shall be tested with the following methods:
i. Free-flow test: Spread 100 grams of beads evenly in a 100 mm diameter glass dish. Place the dish in a 250 mm
inside diameter dessicator which is filled within 25 mm of the top of a dessicator plate with sulphuric acid water
solution (specific gravity 1.10). Cover the dessicator and let it stand for 4 hours at 20°C to 29°C. Remove sample
from dessicator, transfer beads to a pan and inspect for lumps or clusters. Then pour beads into a clean, dry glass
funnel having a 100 mm stem and 6 mm orifice. If necessary, initiate flow by lightly tapping the funnel. The glass
spheres shall be free of lumps and clusters and shall flow freely through the funnel.
ii. The requirements of gradation, roundness and refractive index of glass beads and the amount of glass beads in the
compound shall be tested as per BS:6088 and BS:3262 (Part I).
iii. The Contractor shall furnish to the Engineer a copy of certified test reports from the manufacturer of glass beads
obtained from a reputed laboratory showing results of all tests specified herein and shall certify that the material
meets all requirements of these Specifications However, if so required, these tests may be carried out as directed
by the Engineer.
803.4.3 Application Properties of Thermoplastic Material
803.4.3.1 The thermoplastic material shall readily get screeded/extruded at temperatures specified by the
manufacturers for respective method of application to produce a line of specified thickness which shall be
continuous and uniform in shape having clear and sharp edges.
803.4.3.2 The material upon heating to application temperatures shall not exude fumes which are toxic,
obnoxious or injurious to persons or property.
803.4.4 Preparation
i. The material shall be melted in accordance with the manufacturer's instructions in a heater with a mechanical
stirrer to give a smooth consistency to the thermoplastic material to avoid local overheating. The temperature of
the mass shall be within the range specified by the manufacturer, and shall on no account be allowed to exceed the
maximum temperature stated by the manufacturer. The molten material should be used as expeditiously as
possible and for thermoplastic material which has natural binders or is otherwise sensitive to prolonged heating,
the material shall not be maintained in a molten condition for more than 4 hours.
ii. After transfer to the laying equipment, the material shall be maintained within the temperature range specified by
the manufacturer for achieving the desired consistency for laying.
803.5 Reflectorised Paint
Reflectorised paint, if used, shall conform to the Specification by the manufacturers and approved by the
Engineer. Reflectorising glass beads for reflectorising paints where used shall conform to the requirements of
Clause 803.4.2.
803.6 Application
803.6.1 Marking shall be done by machine. For locations where painting cannot be done by machine,
approved manual methods shall be used with prior approval of the Engineer. The Contractor shall maintain
control over traffic while painting operations are in progress so as to cause minimum inconvenience to traffic
compatible with protecting the workmen.
803.6.2 Where the compound is to be applied to cement concrete pavement, a sealing primer as
recommended by the manufacturer, shall be applied to the pavement in advance of placing of the stripes to
ensure proper bonding of the compound. On new concrete surface any laitance and/or curing compound shall be
removed before the markings are applied.
803.6.3 The thermoplastic material shall be applied hot either by screeding or extrusion process. After
transfer to the laying apparatus, the material shall be laid at a temperature within the range specified by the
manufacturer for the particular method of laying being used. The paint shall be applied using a screed or
extrusion machine.
803.6.4 The pavement temperature shall not be less than 10°C during application. All surfaces to be
marked shall be thoroughly cleaned of all dust, dirt, grease, oil and all other foreign matter before application of
The material, when formed into traffic stripes, must be readily renewable by placing an overlay of new material
directly over an old line. Such new material shall so bond itself to the old line that no splitting or separation
Thermoplastic paint shall be applied in intermittent or continuous lines of uniform thickness of at least 2.5 mm
unless specified otherwise. Where arrows or letters are to be provided, thermoplastic compound may be hand-
sprayed. In addition to the beads included in the material, a further quantity of glass beads of Type
conforming to the above noted Specification shall be sprayed uniformly into a mono-layer on to the hot paint
line in quick succession of the paint spraying operation. The glass beads shall be applied at the rate of
grams per square metre area.
803.6.5 The minimum thickness specified is exclusive of surface applied glass beads. The method of
thickness measurement shall be in accordance with Appendices B and C of BS:3262 (Part 3).
803.6.6 The markings shall be done to accuracy within the tolerances given below:
i. Width of lines and other markings shall not deviate from the specified width by more than 5 percent.
ii. The position of lines, letters, figures, arrows arid other markings shall not deviate from the position specified
by more than 20 mm
iii. The alignment of any edge of a longitudinal line shall not deviate from the specified alignment by more than
iv. The length of segment of broken longitudinal lines shall not deviate from the specified length by more than
In broken lines, the length of segment and the gap between segments shall be as indicated on the drawings; if
these lengths are altered by the Engineer, the ratio of the lengths of the Painted sections shall remain the same.
803.6.7 Properties of Finished Road Markings
The finished lines shall be free from ruggedness on sides and ends and be parallel to the general alignment of
the carriageway. The upper surface of the lines shall be level, uniform and free from streaks.
a. The stripe shall not be slippery when wet.
b. The marking shall not lift from the pavement in freezing weather.
c. After application and proper drying, the stripe shall show no appreciable deformation or discoloration under
traffic and under road temperatures upto 60°C.
d. The marking shall not deteriorate by contact with sodium chloride calcium chloride or oil dripping from traffic.
e. The stripe or marking shall maintain its original dimensions and position. Cold ductility of the material shall be
such as to permit normal movement with the road surface without chopping or cracking.
f. The colour of yellow marking shall conform to IS Colour No. 356 as given in IS:164
803.6.8 Measurements for Payment
803.6.8.1 The painted markings shall be measured in sq. metres of actual area marked (excluding the
803.6.8.2 In respect of markings like directional arrows and lettering, etc., the measurement shall be by
The Contract unit rate for road markings shall be payment in full compensation for furnishing all labour,
materials, tools, equipment, including all incidental costs necessary for carrying out the work at the site
conforming to these Specifications complete as per the approved drawing(s) or as directed by the Engineer and
all other incidental costs necessary to complete the work.
1.7 SPECIAL TERMS AND CONDITIONS FOR THERMOPLAST PAINT WORK:
(1) Agency should carry out the such type of work by only of thermoplastic paint laying machine (power driven only)
with temperature controller and automatic mixing arrangement of glass beads in required proportion.
(2) After completion of the laying of thermoplastic paint work, four years guarantee for durability and reflectivity as
per M.O.R.T.H. specification for road and bridge works clause 803 should be given by the bidder in the writing.
(3) Guarantee security deposit shall be retained @ 10% of the cost of the item of thermoplast paint from the R.A.
bills, which will be released after expiry of guarantee period.
(4) Agency who carry out the such type of work shall have an experience of carrying out similar type of work.
(5) Test certificates as per M.O.R.T.H. specification for road and bridge works clause 803.3.2.2 (vi) should be
furnished of reputed laboratory before.
Cat Eye/ Road Stud/ RPM:- Supplying Raised Pavement Markers made of polycarbonate and ABS
moulded body and reflective panels with Micro compressed molding with micro prismatic lens
(No Glass bead lens) capable of providing total internal reflection of the light entering the lens
face and shall support a load of 13635 kgs.tested in accordance to ASTM D,4280 Type H and
complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 - DO III
Dt 11.06. 1997. The height,width and length shall not exceed 20 mm, 130 mm and 130 mm and with
minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/-
degree.The body of the marker should having finger grip for easy and accurate placement and
application with epoxy / bituminous Adhesive as recommended by the manufacturer of the
marker. The color of the marker should be as per the IRC 35-2015 and as directed by Engineer-ln-
Reflective Pavement marker (RPM) or road stud is device which is bonded to or anchored within the road surface for lane
marking and delineation for night time visibility. It reflects incident light in directions close to the direction from which it
1.2 Definitions
1.2.1 Description of Terms Specific to this standard
1.2.1.1 Coefficient of luminous intensity (CIL) or specific intensity = the ratio of luminous intensity of the retro-reflector
in the direction of observation to luminance at the retro-reflector on a plane perpendicular to the direction of the incident
light expressed in terms of Milaca deal as per incident lux (med/ lx).
1.2.1.2 Horizontal entrance angle – the angle in the horizontal plant between the direction of incident light and the normal
to the leading edge of the marker.
1.2.1.3 Observation angle – the angle in the reflector between the illumination axis and the observation axis.
1.2.1.4 Retro – reflection – reflection in which the radiation is returned in direction close to the direction from which it
came, this property being maintained over were variations of the direction of incident radiation.
1.2.1.5 Head – that part of a road stud which is above the road surface where the road stud is fixed in position in the road.
1.2.1.6 Upper surface – that part of the external surface of road stud which is visible when the road stud is fixed in
position in the road.
1.2.1.7 Anchorage – that part of a road stud which is below the road surface above the road stud is fixed position in the
1.3.1 Plastic body of RPM road stud shall be molded from ASA (Acrylic Sterner Acrylonitrile) or HIPS (Impacts
polystyrene) or ABS or any other suitable material approved by the Engineer-in-charge. The marker shall support a load
of 13635 kg tested in accordance with ASTM D4280.
1.3.2 Reflective panels shall consist if number of lenses containing single or dual prismatic cubes capable of providing
total internal reflection of the light entering the lens face. Lenses shall be molded of methyl methecrylate conforming to
ASTMD 788 or equivalent.
1.4.1 The slope or retro-reflecting surface shall preferably be 35 + 5 degree to base.
1.4.2 The area of each retro-reflecting surface shall not be less than 13.0 Sq.cm.
1.5 Optical Performance
1.5.1 Unidirectional and bi-directional studs
1.5.1.1 Each reflector or combination of reflectors on each face of the stud shall have a CIL not less than given in Table
or 2 as appropriate.
Table 1 Minimum C.I.L. Values for Category "A" studs.
Entrance angle Observation angle C.I.L. in med 1 x
White Amber Red
Table 1 Minimum C.I.L. Values for Category "B" studs.
Entrance angle Observation angle C.I.L. in med 1 x
White Amber Red
Note: The entrance angle of 0"U corresponds to the normal aspect of the reflectors when the
reflecting road stud is installed in horizontal road surface.
1.5.1.2 A stud that incorporates one or more corner cube reflectors shall be considered to be included in category "A". A
stud that incorporates one or more biconvex reflectors shall be considered to be included in category "B".
1.5.2 Omni – directional studs
Each omni-directional stud shall have a minimum C.I.L. of not less than med/ lx.
1.5.3.1 Coefficient of luminance intensity can be measured by produced described in ASTMD 809 "Practice for
Measuring Photometric Characteristics" or as recommended in BS 873 Part 4:1973.
1.5.3.2 Under test conditions a stud shall not be considered to fall the photometric requirements of the measured C.I.L. at
any one position of measurement is less than the values specified in Table 1 or 2 provided that.
(A) The value is not less than 80% of the specified minimum, and
(B) The average of the left and right measurements for the specific angle is greater than the specified minimum.
1.6 Fixing of Reflective Markers
1.6.1 Requirements
1.6.1.1 The enveloping profile of the head of the stud shall be smooth and the suds shall not present any sharp edges to
1.6.1.2 The reflecting portions of the studs shall be free from crevice or ledges where dirt might accumulate.
1.6.1.3 All road studs shall be legibly marked with the name, trade mark of other means of identification of the
1.6.1.4 Marker height shall not exceed 20 mm.
1.6.1.5 Marker width shall not exceed 130 mm.
1.6.1.6 The base of the marker shall be flat within 1.3 mm. If the bottom of the marker is configured. The outermost faces
of the configurations shall not deviate more than 1.3 mm form a flat surface.
1.6.2 Placement
1.6.2.1 The reflective marker shall be fixed to the road surface using the adhesives and the produced recommended by the
manufacturer. No nails shall be used to affix the marker as nails are hazardous for the roads.
1.6.2.2 Regardless of the type of adhesive used. The markers shall not be fixed if the pavement is not surface dry and on
new asphalt concrete surfacing unit the surfacing has been opened to traffic for a period of not less than 14 hours.
1.6.2.3 The portions of the highway surface, to which the marker is to be bonded by the adhesive, shall be free of dirt,
curing compound, grease, oil, moisture, loose of unsound layers, paint and any other material which would adversely
affect the bond of the adhesive.
1.6.2.4 Use a wire brush, if necessary to loosen and remove dirt. Then brush or blow clean.
1.6.2.5 The adhesive shall be places uniformly on the cleaned pavement surface or on the bottom to the marker in a
quantity sufficient to result in complete coverage of the area of contact of the marker with no voids present and with a
slight excess after the marker has been lightly pressed in place.
1.6.2.6 For epoxy installations, excess adhesive around the edge of the marker, excess adhesive on the pavement and
adhesive on the exposed surfaces of the markers shall be immediately removed. Soft rags moistened with mineral spirits
of kerosene may be used a necessary to remove adhesive from exposed faces of pavement marker.
1.7 Warranty and durability
The contractor shall obtain from the manufacturer a two year warranty for satisfactory light performance including
stipulated retro-reflectance of the reflecting panel and submit the same to the Engineer. In addition, a two year warranty
for satisfactory infield performance of the finished road marker shall also be given by the contractor who carried out the
work of fixing of reflective road markers. In case the markers are displaced, damaged get worn out or lose their
reflectivity compared to stipulated standards, the contractor would be required to replaced all such markers within 15 days
of the intimation from the Engineer at his own cost and with no extra remuneration to be paid for such works.
1.8 Measurement for Payment
The measurement of Cats eye shall be in numbers of markers supplied and fixed.
The contact unit rate for Cats eye shall be payment in full compensation for furnishing all labour, material, tools,
equipment including incidental costs necessary for carrying out the work at site conforming to the specifications complete
as per approved drawings or as directed.
Cautionary Warning Sign :-Providing and fixing sign boards made out of 2mm aluminium sheet /
4mm ACP (Aluminum composite Panel); size 90 x 90 x 90 cms. equilateral triangle as per design of
IRC-67-2012. Pre treated with phospheting process & acid etching; coated with one coat of epoxy
primer and two coats of best quality epoxy paint ;reflectorised with Micro Prismatic Grade retro
refiective sheeting of Type-11 as per ASTM D-4956 and latest M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm/ 65NB Circular MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm; painted with best quality epoxy coatings in black and
white bends. The details of symbol for each board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of size 45 x 45 x 60 Cms. for each leg. including
excavation, curing etc.complete under the supervision of engineer in charge. A warranty for
years for the Retro reflective sheeting from original manufacturer & a certified copy of 3 year
outdoor exposure test report from third party test lab for the product offered shall be submitted by
contractor. (A) Class-C Type-11 Retro Reflective sheeting.
Regulatory / Mandatory Sign : Providing and fixing sign boards made out of 2mm aluminium
sheet / 4mm ACP (Aluminum composite Panel); size 60 cms Dia Circle as per design of IRC-67-
2012. Pre treated with phospheting process & acid etching; coated with one coat of epoxy primer
and two coats of best quality epoxy paint ;reflectorised with Micro Prismatic Grade retro refiective
sheeting of Type 11 as per ASTM D-4956 and latest M.O.S.T. Specifications; 3.6mtr long stand post
of 75 x 75 x 6mm / 65NB Circular MS Pipe as required and frame fabricated from suitable size iron
angle of 35 x 35 x 3mm; painted with best quality epoxy coatings in black and white bends. The
details of symbol for each board shall be as per theinstruction of engineer in charge. The fixing at
site shall be in 1:2:4 CC block of size 45 x 45 x 60 Cms. for each leg.including excavation, curing etc.
complete under the supervision of engineer in charge. A warranty for 10 years for the Retro
reflective sheeting from original manufacturer & a certified copy of 3 year outdoor exposure test
report from third party test lab for the product offered shall be submitted by contractor. (A) Class-
C Type-11 Retro Reflective sheeting.
STOP Sign :-Providing and fixing sign boards made out of 2mm aluminium sheet / 4mm ACP
(Aluminum composite Panel); size 90 cms Octagone as per design of IRC-67-2012. Pre treated with
phospheting process & acid etching; coated with one coat of epoxy primer and two coats of best
quality epoxy paint ;reflectorised with Micro Prismatic Grade retro refiectivesheeting of Type-11
as per ASTM D-4956 and latest M.O.S.T.Specifications; 3.6mtr long stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required and frame fabricated from suitable size iron angle of 35 x 35 x
3mm; painted with bestquality epoxy coatings in black and white bends. The details of symbol
foreach board shall be as per theinstruction of engineer in charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg.including excavation, curing etc.complete under
the supervision of engineer in charge. A warranty for 10 years for the Retro reflective sheeting
from original manufacturer & a certified copy of 3 year outdoor exposure test report from third
party test lab for the product offered shall be submitted by contractor. (A) Class-C Type-11 Retro
Reflective sheeting
Give Way Sign :-Providing and fixing sign boards made out of 2mm aluminium sheet / 4mm ACP
(Aluminum composite Panel); size 90 x 90 x 90 cms. equilateral triangle as per design of IRC-67-
2012. Pre treated with phospheting process & acid etching; coated with one coat of epoxy primer
and two coats of best quality epoxy paint ;reflectorised with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per ASTM D-4956 and latest M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm / 65NB Circular MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm; painted with bestquality epoxy coatings in black and
white bends. The details of symbol foreach board shall be as per theinstruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg.including
excavation, curing etc.complete under the supervision of engineer in charge. A warranty for
years for the Retro reflective sheeting from original manufacturer & a certified copy of 3 year
outdoor exposure test report from third party test lab for the product offered shall be submitted by
contractor. (A) Class-C Type-11 Retro Reflective sheeting.
Place Identification Sign :-Providing and fixing sign boards made out of 2mm aluminium sheet /
4mm ACP (Aluminum composite Panel); size 150x90 cms. rectangular as per design of IRC-67-2012.
Pre treated with phospheting process & acid etching; coated with one coat of epoxy primer and
two coats of best quality epoxy paint ;reflectorised with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per ASTM D-4956 and latest M.O.S.T.Specifications; 4.0mtr long
(2 Nos.) stand post of 75 x 75 x 6mm / 65NB Circular MS Pipe as required and frame fabricated
from suitable size iron angle of 35 x 35 x 3mm; painted with bestquality epoxy coatings in black
and white bends. The details of symbol foreach board shall be as per theinstruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg.including
excavation, curing etc.complete under the supervision of engineer in charge. A warranty for
years for the Retro reflective sheeting from original manufacturer & a certified copy of 3 year
outdoor exposure test report from third party test lab for the product offered shall be submitted by
contractor. (A) Class-C Type-11 Retro Reflective sheeting.
Hazard Marker Sign :-Providing and fixing sign boards made out of 2.0 mm aluminium sheet /
mm ACP (Aluminum composite Panel); size 90x30 cms. rectangular as per design of IRC-67-2012.
Pre treated with phospheting process & acid etching; coated with one coat of epoxy primer and
two coats of best quality epoxy paint ;reflectorised with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per ASTM D-4956 and latest M.O.S.T.Specifications; 1.8mtr long
stand post of 75 x 75 x 6mm / 65NB Circular MS Pipe as required and frame fabricated from
suitable size iron angle of 35 x 35 x 3mm; painted with best quality epoxy coatings in black and
white bends. The details of symbol for each board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg. including
excavation, curing etc.complete under the supervision of engineer in charge. A warranty for
years for the Retro reflective sheeting from original manufacturer & a certified copy of 3 year
outdoor exposure test report from third party test lab for the product offered shall be submitted by
contractor. (A) Class-C Type-11 Retro Reflective sheeting.
Chevron sign :-Providing and fixing sign boards made out of 1.5mm aluminium sheet / 3mm ACP
(Aluminum composite Panel); size 60x50 cm as per design of IRC-67-2012. Pre treated with
phospheting process & acid etching; coated with one coat of epoxy primer and two coats of best
quality epoxy paint ;reflectorised with Micro Prismatic Grade retro refiectivesheeting of Type-11
as per ASTM D-4956 and latest M.O.S.T.Specifications; 3.3 mtr long stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required and frame fabricated from suitable size iron angle of 50 x 50 x
5mm; painted with bestquality epoxy coatings in black and white bends. the details of symbol or
inscription / numerals for each board shall be as per the instruction of engineer in charge.The
fixing at site shall be in 1:2:4 CC blockof size 45 x 45 x 60 Cms. for each leg.including excavation,
curing etc.complete under the supervision of engineer in charge. A warranty for 10 years for the
Retro reflective sheeting from originaa manufacturer & a certified copy of 3 year outdoor exposure
test report from third party test lab for the product offered shall be submitted by contractor. (A)
Class-C Type-11 Retro Reflective sheeting.
1. Material & Manufacturing:
The work shall consist of fabrication, supply and installation of ground mounted traffic signs on roads. The details
of the signs shall be as shown in the drawings and in conformity with the code of practice for Road signs, IRC
The various materials and fabrication of the traffic signs shall conform to the following
1.2.1 Concrete:
Concrete for the foundation shall be of M15 Grade as per section 1700 or the grade
shown on the drawings or otherwise as directed by the Engineer.
1.2.2 Reinforcing Steel
Reinforcing steel shall conform to the requirements of IS: 1786 unless otherwise
shown on the drawings
1.2.3 Bolts, Nuts and Washers
High strength Bolts shall conform to IS: 1367 whereas precision bolts, nuts, etc.
shall conform to IS:
1.2.4 Plates and Supports
Plates and support sections for the sign posts shall conform to IS: 226 and IS:
or any other relevant IS specifications.
1.2.5 Substrate
Sign panel shall be fabricated on Aluminum sheet, aluminum composite panel, fibre
glass sheeting, or sheet moulding compound. Aluminum sheets used for sign
boards shall be of smooth, hard and corrosion resistance aluminum alloy
conforming to IS: 736-Material Designation 24345 or 1900. Aluminum composite
Material (ACM) sheets shall be sandwiched construction with a thermoplastic
core of Low Density Polyethylene (LDPE) between two thick skins/sheets of
aluminum with overall thickness of 3mm or 4mm (as specified in the contract), and
aluminum skin thickness 0.5mm and 0.3mm respectively on both the sides.
The mechanical proportion of ACM and that of aluminum skin shall conform to the
requirements given in the table 800-1, when tested in accordance with the test
methods mentioned against each of them.
Table 800-1: Specifications for Aluminum Composite Material (ACM)
Specilication lor 4mm lor
Sr No. Description Standard 3mm
test Acceptable value
A Mechanical Properties ol ACM
Peel off strength with
1 retro ASTM Min. 4 N/mm Min. 4 N/mm
reflective sheeting. D903
2 Tensile strength ASTM E8 Min. 40 Min. 0 N/mm2
3 0.2% Proof Stress ASTM E8 Min. 34 Min. 4 N/mm2
4 Elongation ASTM E8 Min. 6 % Min. 5 %
5 Flexural strength ASTM Min. 130 N/mm2
Shear strength with C393 N/mm2 Min.
6 Punch shear test ASTM Min. 18 N/mm2
8 Properties ol Aluminium
1 Tensile strength (Rm) ASTM E8 Min. 150 Min. 1
Min.70,000 Min.
2 Modulus of elasticity ASTM E8 N/mm2
3 Elongation ASTM E8 A50 Min. 2% A50 Min. 2%
4 0.2 % Proof Stress ASTM E8 Min. 110 N/mm2
1.2.6 Plate Thickness N/mm2
Shoulder mounted ground signs with a maximum side dimension not exceeding
mm shall not be less than 1.5mm thick Aluminum and 3 mm thick with
Aluminium Composite Material. All other signs shall be at least 2mm thick
Aluminum and 4 mm thick with Aluminium Composite Material. The thickness of
the sheet shall be related to the size of the sign and its support and shall be such that
it does not bend or deform under prevailing wind and other loads.
1.2.7 In respect of sign sizes not covered by IRC-67, the structural details (thickness etc.)
shall be as per the approved drawings or as directed by the Engineer.
1.3 Traffic signs having Retro Reflective Sheeting
1.3.1 General Requirements
The retro reflective sheeting used on the signs shall consist of white or coloured sheeting having a smooth
outer surface, which has the property of retro reflection over its entire surface. It shall be weather
resistant and exhibit colour fastness. It shall be new and unused and show no evidence of cracking, scaling,
and pitting, blistering, edge lifting or curling and shall have negligible shrinkage or expansion. A certificate of
having the sheeting tested for coefficient of retro reflection, daytime colour and luminance, shrinkage,
flexibility, liner removal, adhesion, impact resistance, specular gloss and fungus resistance, 3 years outdoor
weathering and its having passed these tests shall be obtained from International/Government
laboratory/Institute by the manufacturer of the sheeting. The reflective sheeting shall be either of
Engineering Grade material with enclosed lens, High Intensity Grade with encapsulated lens or Micro-
Prismatic Grade retro reflective element material as given in Clauses 801.3.2 to 801.3.7. Guidance on the
recommended application of each class of sheeting may be taken from IRC-67.
1.3.2 High Intensity Grade Sheeting
1.3.2.1 High Intensity Grade (Type III)
This sheeting shall be of encapsulated lens type consisting of spherical glass lens, elements adhered to a
synthetic resin and encapsulated by a flexible, transparent water-proof plastic having a smooth surface or as
an unmetallised micro prismatic reflective material elements. The retro-reflective surface after cleaning with
soap and water and in dry conditionshall have theminimum coefficient of retro-reflection (determined with
ASTM D:4956-09) as indicated in Table 800-2.
Table 800-2 Acceptable Minimum Coefficient of Retro-reflection for Type III High Intensity
Grade SheetingA (Encapsulated Lens Type)
(Candelas Per Lux Per Square Metre)
Observation Entrance
White Yellow Orange Green Red Blue Brown
A Minimum Coefficient of Retro reflection (R ) (cd.lx .m ). 45-1 -2 25 10 10 5.0
BValues for 0.1° observation angles are supplementary requirements that shall apply only when specified by
the purchaser in the contract or order.When totally wet, the sheeting shall show not less than 90 percent,
of the values of retro reflectance indicated in above Table. At the end of 7 years, the sheeting shall retain at
least 80 percent of its original retro-reflectance.
1.3.2.2 High Intensity Micro-Prismatic Grade Sheeting (HIP) (Type IV) :
This sheeting shall be of high intensity retro-reflective sheeting made of micro-prismatic retro-reflective
element material coated with pressure sensitive adhesive. The retro-reflective surface after cleaning with soap
and water and in dry condition shall have the minimum co-efficient of retro-reflection (determined in
accordance with ASTM D 4956-09) as indicated in Table 800-3.
Table 800-3 Acceptable Minimum Coefficient of Retro-Reflection for
Type IV High Intensity Micro-prismatic Grade SheetingA
(Candelas Per Lux Per Square Metre)
AMinimum Coefficient of Retro reflection (R )(cd.lx-1.m-2).
BValues for 0.1o observation angles are supplementary requirements that shall apply only when specified
by the purchaser in the contract or order. When totally wet, the sheeting shall show not less than
percent of the values of retro reflection indicated in above Table. At the end of 7 years, the sheeting shall
retain at least 80 percent of its original retro-reflectance
1.3.4 Prismatic Grade Sheeting
1.3.4.1 Prismatic Grade Sheeting (Type VIII)
The reflective sheeting shall be retro reflective sheeting made of micro prismatic retro reflective material.
The retro reflective surface, after cleaning with soap and water and in dry condition shall have the
minimum co-efficient of retro reflection (determined in accordance with ASTM D: 4956-09) as indicated in
Table 800-4 Acceptable Minimum Coefficient of Retro-reflection for Type VIII Prismatic Grade
SheetingA (Candelas Per Lux Per Square Metre)
AMinimum Coefficient of Retro reflection (RA) (cd.lx-1.m-2).
BValues for 0.1o observation angles are supplementary requirements that shall apply only when specified
by the purchaser in the contract or order. When totally wet, the sheeting shall show not less than
percent of the values of retro reflection indicated in above Table. At the end of 7 years, the sheeting shall
retain at least 80 percent of its original retro-reflectance
1.3.4.2 Prismatic Grade Sheeting (Type IX)
The reflective sheeting shall be retro reflective sheeting made of micro prismatic retro reflective material. The
retro reflective surface, after cleaning with soap and water and in dry condition shall have the minimum
co-efficient of retro reflection (determined in accordance with ASTM D 4956-09) as indicated in Table 800-5
Table 800-5 Acceptable Minimum Coefficient of Retro-reflection for Type IX Prismatic Grade
SheetingA (Candelas Per Lux Per Square Metre)
AMinimum Coefficient of Retro reflection (RA) (cd.lx-1.m-2).
BValues for 0.1o observation angles are supplementary requirements that shall apply only when specified
by the purchaser in the contract or order.When totally wet, the sheeting shall show not less than
percent of the values, of retro reflection indicated in above Table. At the end of 10 years, the sheeting shall
retain at least 80 percent of its original retro-reflectance.
1.3.4.3 Prismatic Grade Sheeting (Type XI)
Retro reflective sheeting typically manufactured as a cube corner. The reflective sheeting shall be retro
reflective sheeting made of micro prismatic retro reflective material. The retro reflective surface, after
cleaning with soap and water and in dry condition shall have the minimum co-efficient of retro reflection
(determined in accordance with ASTM D 4956-09) as indicated in Table 800-6
Table 800-6 Acceptable Minimum Coefficient of Retro-reflection for Type XI Prismatic Grade
SheetingA (Candelas per Lux per Square Metre)
AMinimum Coefficient of Retro reflection (R ) (cd.lx-1.m-2).
BValues for 0.1o observation angles are supplementary requirements that shall apply only when specified
by the purchaser in the contract or order. When totally wet, the sheeting shall show not less than
percent of the values, of retro reflection indicated in above Table. At the end of 10 years, the sheeting
shall retain at least 80 percent of its original retro-reflectance.
The sheeting shall have a pressure-sensitive adhesive of the aggressive-tack type requiring no heat,
solvent or other preparation for adhesion to a smooth clean surface, in a manner recommended by the
sheeting manufacturer. The adhesive shall be protected by an easily removable liner (removable by
peeling without soaking in water or other solvent) and shall be suitable for the type of material of the
base plate used for the sign. The adhesive shall form a durable bond to smooth, corrosion and weather
resistant surface of the base plate such that it shall not be possible to remove the sheeting from the sign
base in one piece by use of sharp instrument. The sheeting shall be applied in accordance with the
manufacturer's specifications.
1.3.6 Fabrication
Surface to be reflectorised shall be effectively prepared to receive the retro-reflective sheeting. The
aluminium sheeting shall be de-greased either by acid or hot alkaline etching and all scale/dust removed
to obtain a smooth plain surface before the application of retro-reflective sheeting. If the surface is rough,
approved surface primer may be used. After cleaning, metal shall not be handled, except by suitable
device or clean canvas gloves, between all cleaning and preparation operation and application of
reflective sheeting/primer. There shall be no opportunity for metal to come in contact with grease, oil or
other contaminants prior to the application of retro-reflective sheeting. Complete sheets of the material shall
be used on the signs except where it is unavoidable. At splices, sheeting with pressure-sensitive adhesives
shall be overlapped not less than 5 mm. Where screen printing with transparent colours is proposed, only
butt joint shall be used. The material shall cover the sign surface evenly and shall be free from twists, cracks
and folds. Cut-outs to produce legends and borders shall be bonded with the sheeting in the manner specified
by the manufacturer.
1.3.7 Message / Border
The messages (legends, letters, numerals, etc.) and borders shall either be screen-printed or of cut out from
durable transparent overlay or cut out from the same type of reflective sheeting for the
cautionary/mandatory sign boards. Screen printing shall be processed and finished with materials and in a
manner specified by the sheeting manufacturer. For the informatory and other sign boards, the messages
(legends, letters, numerals etc.) and borders shall be cut out from durable transparent overlay film or cut- out
from the same reflective sheeting only. Cut-outs shall be from durable transparent overlay materials as
specified by the sheeting manufacturer and shall be bonded with the sheeting in the manner specified by the
manufacturer. For screen-printed transparent coloured areas on white sheeting, the co-efficient of retro-
reflection shall not be less than 50 per cent of the corresponding values in Tables 800-2to 800-6 as
applicable. Cut-out messages and borders, wherever used, shall be either made out of retro-reflective
sheeting or made out of durable transparent overlay except those in black which shall be of non-reflective
sheeting or opaque in case of durable transparent overlay.
1.3.8 Color for Signs
1.3.8.1 Signs shall be provided with retro-reflective sheeting and/or overlay film/screening ink as shown on
the detailed drawings. The reverse side of all signs shall be painted grey
1.3.8.2 Except in the case of railway level crossing signs (for which the colour scheme is given later) the sign
posts shall be painted in 250 mm wide bands, alternately black and white. The lowest band next to the
ground shall be in black
1.3.8.3 The colour of the material shall be located within the area defined by the chromaticity coordinates in
Table 8.1 and comply with the luminance factor given in Table 800-7 when measured as per
Table 8.1 Specilication Limits (Daytime)A
The colours shall be durable and uniform in acceptable hue when viewed in day light or under normal
headlights at night.
1.3.8.4 The mandatory and warning signs shall be provided with white background and red border.
The legend/symbol for these signs shall be in black
1.3.8.5 The colours chosen for informatory or guide signs shall be distinct for different categories of
roads. For National Highways and State Highways,these signs shall be of green background with
whiteborders, legends and word messages. For Expressways these signs shall be of blue
background with white border, legends and word messages.
1.3.9 Refurbishments
Where exisiting signs are specifired for refurbishments, the sheeting shall have semi-rigid
aluminum backing or materials as per clause 1.2.5, pre-coated with aggressive tack type pressure
sensitive adhesive. The adhesive shall be suitable for the type of material used for the signs and
should thoroughly bond with that material.
1.3.10 Sizes of Letters
1.3.10.1 Letter size should be chosen with due regard to the speed, classification and location of the
road, so that the sign is of adequate size for legibility but without being too large or obtrusive. The
size of the letter, in terms of x-height, to be chosen as per the design speed is given in Table 800-8.
Table 800-8 Acceptable Limits for Size of Letters and Visibility Distance
Design Minimum 'x' Minimum
Speed Height of the Clear visibility Distance from
(kmph) Letters (mm) distance (m) Centre Line
The thickness of the letters0 and their relation to the x-height, the width and the2 heights are indicated in
Table IV (a) of the Annexure-IV to facilitate the design of the informatory signs and definition plates.
1.3.10.2 For advance direction signs on non-urban roads, the letter size ('x' height) should be minimum of
150 mm for National and State Highways and 100 mm for other roads. In case of overhead signs, the size
('X' height) of letters may be minimum 300 mm. Thickness of the letter could be varied from 1/6 to 1/ 5 of
the letter 'x' size. The size of the initial uppercase letter shall be 1-1/3 times x-height. In urban areas,
letter size shall be 100 mm on all directional signs. For easy and better comprehension, the word
messages shall be written in initial upper case letter followed by lower case letters.
1.3.10.3 Letter size on definition plates attached with normal sized signs should be 100 mm or 150 mm. In
the case of small signs, it should be 100 mm. Where the message is long, as for instance in "NO
PARKING" and "NO STOPPING" signs, the message may be broken with two lines and the size of
letters may be varied in the lines so that the definition plate is not too large. The lettering on definition
plates will be all in upper case letters.
1.3.11Warranty and Durability
The Contractor shall obtain from the original manufacturer of the Retro Reflective sheeting for period of
Seven (7) years warranty for satisfactory field performance including stipulated retro reflectance of Micro-
Prismatic sheeting and a Seven years warranty for High Intensity Grade and submit the same to the Engineer. The
warranty shall be inclusive of the screen printed or cut out letters/legends and their bonding to the retro reflective
sheeting. The contractor shall also furnish LOT numbers and certificate that the signs and material supplied
against the assigned work meet allthe stipulated requirements and carry the stipulated warranty and the
contractor/supplier is the authorized converter of the particular sheeting.
All the signs shall be dated during the fabrication with indelible marking to indicate the start of the
warranty. The warranty shall also cover the replacement obligation by the sheeting manufacturer as well as
contractor for replacement/repair/restoration of the retro reflective efficiency.
A certificate in original shall be given by the manufacturer of the sheeting that its offered retro-reflective
sheeting has been tested for various parameters such as co-efficient of retro reflection, day/night time color
and luminance, shrinkage , flexibility, liner removal , adhesion, impact resistance, specular gloss and
fungus resistance.; the tests shall be carried out by a Government laboratory in accordance with the various
ASTM procedures and the results must show that the sheeting has passed the requirements for all the above
mentioned parameters. A copy of the test reports shall be attached with the certificate.
1.5 Installation
The traffic signs shall be mounted on support posts, which may be of GI pipes conforming to IS
Rectangular Hollow Section conforming to IS 4923 or square hollow Section conforming to IS 3589. Sign
posts, their foundations and sign mountings shall be so constructed as to hold these in a proper and
permanent position against the normal storm wind loads or displacement by vandalism.Normally, signs
with an area up to 0.9 square metre shall be mounted on a single post, and for greater area, two or more
supports shall be provided. Post End(s) shall be firmly fixed to the ground by means of properly designed
foundation. The work of foundation shall conform to relevant Specifications as specified.
1.5.2 All components of signs and supports, other than the reflective portion of GI posts shall be
thoroughly desealed, cleaned, primed and painted with two coats of epoxy paint. Any part of post below
ground shall be painted with protective paint.
1.5.3 The signs shall be fixed to the posts by welding in the case of steel posts and by bolts and washers of
suitable size in the case of reinforced concrete or GI posts. After the nuts have been tightened,the tails of
the bolts shall be furred over with a hammer to prevent removal.
1.5 Measurement for Payment
The measurements of standard cautionary, mandatory and information signs shall be in number of
different types of signs supplied and fixed, while for direction and place identification signs, these shall be
measured by per Number
The Contract unit rate shall be payment in full for the cost of making the road sign,including all materials,
installing it at the site and incidentals to complete the work inaccordance with the Specifications
The contract rate shall be for a unit of One Number. for completed item as directed.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
R&B City Sub Division R&B Division
Bhavnagar Bhavnagar
Construction of Resurfacing of Hatab - Padva Road (MDR) Km/ 2+000 to 8+000 Ta.Dist.Bhavnagar
Schedule for Testing of Material
For ensuring quality control and workmanship, various test prescribed below corresponding to the material
concerned shall be taken as periodic intervals as stipulated below.. The Material shall be got tested at GERI or
Govt. recognized Laboratory or field Laboratory of GERI for which 1 % of the estimated amount put to tender
shall be recovered from the contractor from the R.A. Bill and Final Bills as the testing charges shall be paid by
the Govt. to the Laboratory. However if the charges increase over 1 % no excess recovery shall be made from
the contractor as per resolution of B&C department dated 10th May 1985, vide TNC/1085 (4) S.
Sr. Material No. of
Approx. Qty. Description of tests. Frequency of test
No. /Item reqd. tests
Fineness, Compressive
Strength, Consistency
1 Cement 3593.73 MT setting time, Chemical As per Norms
2 Asphalt VG-30 120.70 MT Softening point, 1 test / 10 tankers
PI/ LL/ OMC / MDD / CBR
3 Earthwork 11620.29 Cum Sieve Analysis 1 test / 3000 cum
Gradation, OMC, MDD, PI,
4 Quarry spall 134.88 Cum CBR 5 test/500 to 1500cum
5 Rubble 337.20 Cum Soundness -
water absorption
CBR, Elongation, Gradation,
53mm to Flakiness ,Water absorption,
9.5mm Impact, Abrasion etc Up to 100 Cum - 1 Test
CBR, Elongation, Gradation, 101 to 500 Cum -
9.5mm to Flakiness ,Water absorption, Test
2.36mm Impact, Abrasion etc 501 to 1500 Cum -
CBR, Elongation, Gradation,
Flakiness ,Water absorption,
2.36mm below 2204.16 Cum Test
Impact, Abrasion etc
Elongation, Gradation,
22.40mm to Flakiness ,Water absorption,
1688.15 Cum Up to 100 Cum - 1 Test
45mm Impact, Abrasion etc
101 to 500 Cum -
Elongation, Gradation, Test
7 2.36mm to Flakiness ,Water absorption,
22.4mm Impact, Abrasion etc Test
stone dust Elongation, Gradation, 1500 to 5000 Cum -
2.36 to 75 1688.15 Cum Flakiness ,Water absorption, Test
micron Impact, Abrasion etc
Elongation, Gradation,
26.5 to 19 mm 74.88 Cum Flakiness ,Water absorption,
Impact, Abrasion etc
Elongation, Gradation,
19 to 13.2 mm 344.43 Cum Flakiness ,Water absorption,
Impact, Abrasion etc Up to 100 Cum - 1 Test
101 to 500 Cum -
Elongation, Gradation, Test
8 13.2 to 4.75 Flakiness ,Water absorption,
mm Impact, Abrasion etc Test
Elongation, Gradation, 1500 to 5000 Cum -
4.75 to Flakiness ,Water absorption, Test
2.36mm Impact, Abrasion etc
Elongation, Gradation,
Stone dust 164.73 Cum Flakiness ,Water absorption,
Impact, Abrasion etc
Elongation, Gradation,
9.5mm to Flakiness ,Water absorption,
13.2mm Impact, Abrasion etc
Elongation, Gradation, Up to 100 Cum - 1 Test
4.75mm to Flakiness ,Water absorption, 101 to 500 Cum -
9.5mm Impact, Abrasion etc Test
Elongation, Gradation,
247.98 Cum Flakiness ,Water absorption,
Impact, Abrasion etc
Elongation, Gradation,
Stone dust 643.50 Cum Flakiness ,Water absorption,
Impact, Abrasion etc
Thickness , Density As per GOVT R&B Deptt. As per
10 Core Test - - requirement
Bituminous Content Circular Dt. 31/5/2017
For C.C. & C.D. Works
11 Sand 4187.80 Cum 1test /Work
Elongation, Gradation, Up to 100 Cum - 1 Test
12 40mm 1427.22 Cum Flakiness ,Water absorption, 101 to 500 Cum - 3 Test
Impact, Abrasion etc 501 to 1500 Cum - 5 Test
1500 to 5000 Cum - 7 Test
Elongation, Gradation, Up to 100 Cum - 1 Test
13 20mm 4759.47 Cum Flakiness ,Water absorption, 101 to 500 Cum - 3 Test
Impact, Abrasion etc 501 to 1500 Cum - 5 Test
1500 to 5000 Cum - 7 Test
Elongation, Gradation, Up to 100 Cum - 1 Test
14 10mm 2079.12 Cum Flakiness ,Water absorption, 101 to 500 Cum - 3 Test
Impact, Abrasion etc 501 to 1500 Cum - 5 Test
1500 to 5000 Cum - 7 Test
1 to 5 Cum -1 Sample
6 to 10 Cum -2 Sample
11 to 15 Cum -3 Sample
16 to 30 Cum - 4 Sample
15 C.C. cube M-10 56.80 Cum Comp. strength 31 to 50 Cum -5 Sample
51cum above - one
additional sample for
1 to 5 Cum -1 Sample
6 to 10 Cum -2 Sample
11 to 15 Cum -3 Sample
16 to 30 Cum - 4 Sample
16 C.C. cube M-15 2138.92 Cum Comp. strength
31 to 50 Cum -5 Sample
51cum above - one
additional sample for
1 to 5 Cum -1 Sample
6 to 10 Cum -2 Sample
11 to 15 Cum -3 Sample
16 to 30 Cum - 4 Sample
17 CC Cube M-20 1839.58 Cum Comp. strength
31 to 50 Cum -5 Sample
51cum above - one
additional sample for
1 to 5 Cum -1 Sample
6 to 10 Cum -2 Sample
11 to 15 Cum -3 Sample
16 to 30 Cum - 4 Sample
18 CC Cube M-30 5503.38 Cum Comp. strength
31 to 50 Cum -5 Sample
51cum above - one
additional sample for
1 to 5 Cum -1 Sample
6 to 10 Cum -2 Sample
11 to 15 Cum -3 Sample
16 to 30 Cum - 4 Sample
19 CC Cube M-40 82.48 Cum Comp. strength
31 to 50 Cum -5 Sample
51cum above - one
additional sample for
Tensile strength
20 186.83 MT Yeild stress 1 test / forEach dia.
21 Water - - Chemical Test 1 test / source -
reflective Co-efficient of Retro 3 reading for 10 boards As per
sheeting for Reflection. for each colour Norms
Co-efficient of Luminous As per
23 Cat Eye 733.00 No. 1 sample for each colour
Intensity- ASTM D4280 Norms
(RL) Retro Reflectivity
Sq. (mcd/m2/lux) Proportions As Per
24 Thermoplast 1980.00 5 reading for every 5 km
Mt. of constituents of Marking Norms
Material Skid Resistance
The Number of tests will be as per Manual of quality control or latest Govt. G.R/Circular and it will be
considered final
The contractor shall have to pay 1% of the estimated cost put to tender towards all testing of materials and the
same shall be deducted from their bills for the works.
Testing charges of GERI shall be borne by Govt. No refund be made nor extra charges over 1% shall be
recoverable from the contractor.
If directed by the Engineer in charge, the materials intended to be used for the work but not included in the
above schedule shall also be got tested at Government recognized Laboratory or field Laboratory.
The Numbers of tests will be as per manual of quality control or latest Govt. G.R./Circular will be final.
Sign of Contractor
Deputy Executive Engineer Executive Engineer
R&B City Sub Division R&B Division
Bhavnagar Bhavnagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Corigendum about date.pdf
2. SBD Hathab Padva.pdf
3. Index.pdf
4. Specification nad Test Schedule.pdf
5. Bill of Qunatity Hathab Padva.pdf
6. Drawings.pdf
7. GR Part-1.pdf
8. GR Part-2.pdf
9. GR Part-3.pdf
10. GR Part-4.pdf
11. GR Part-5.pdf
12. SBD_PBMC_OPRC_GR_14-10-26(1).pdf
13. Performance Bond and Bitumen date.pdf
14. Litigation format.pdf
16. Notice-18.pdf
15. PQ Hathab.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .