Loading…
Loading…
Tender Value
₹22.9 L
EMD Value
₹22,945
Closing Date
23 Jun 2026, 5:00 pm
BDO PIPILI
PANCHAYAT SAMITI OFFICE PIPILI 752104
CONSTRUCTION OF OFFICE BUILDING AND 50MT GODOWN OF RUPADEIPUR SCS OF PIPILI BLOCK IN PURI DISTRICT
2026_ZPPIP_131332_1
PSP/007/2026-27
Open Tender
Civil Works - Buildings
180 days
RUPADEIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹22,945
Yes
6 Jun 2026
6 Jun 2026
24 Jun 2026
6 Jun 2026
23 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed within 50m initial lead & 1.5m initial lifts with sundries & T&P requried for the work complete | 74.68 | Cum. | 276.89 | ₹20,678.98 |
| 2 | Filling foundation and plinth with sand well watered and rammed (per Cum.)including all costs of labour, T&P etc. complete as per direction of EIC. | 64.54 | Cum. | 662.31 | ₹42,742.84 |
| 3 | Providing & laying PCC (1:3:6) with 40mm size black hard granite metal in including all labour, materials & royality etc. complete as per direction of EIC. | 19.15 | Cum. | 6,212.61 | ₹1,18,974.6 |
| 4 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(COLUMN BASE) | 10.02 | Cum. | 6,714.78 | ₹67,261.95 |
| 5 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(PLINTH BAND) | 7.24 | Cum. | 7,585.11 | ₹54,932.31 |
| 6 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(COLUMN & BEAM(G.FLOOR)) | 7.57 | Cum. | 15,977.68 | ₹1,20,972.69 |
| 7 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(COLUMN & BEAM(FIRST.FLOOR)) | 4.02 | Cum. | 18,011.12 | ₹72,386.69 |
| 8 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(LINTEL(G.FLOOR)) | 3.94 | Cum. | 14,378.13 | ₹56,676.78 |
| 9 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(CHAJJA(G.FLOOR)) | 6 | Sqm | 1,250.5 | ₹7,503 |
| 10 | R.C.C. work M-20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials Including centring and shuttering etc. complete as per direction of Engg-in-Charge .(ROOF SLAB (G.FLOOR)) | 7.5 | Cum. | 13,962.62 | ₹1,04,745.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
DTCNRDPUR.pdf
Tender Documents • 1.68 MB
BOQ_594982.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid