Tender Value
₹2.3 L
EMD Value
₹4,520
Closing Date
23 Apr 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Construction of CWSN for Boys Middle School Khanpora Budgam
2026_PWDJK_307995_6
NIT_No_04_DB_2026-27
Open Tender
Civil Works
Percentage
30 days
Khanpora Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Division Budgam
₹4,520
16 Apr 2026
16 Apr 2026
24 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual /mechnical means in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead as directed from edge of cutting All kinds of soil. | |||||
| 2Supplying and laying Dry stone soling dully hand packed tightly including ramming , watering and with all carriages up to the site of work . | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all level ( 1:4:8 (1 Cement: 4 corse sand: 8 grade stone aggregate 40mm nominal size) crushed including all carriages up to the site of work . | |||||
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to all levels ( 1:2:4 (1Cement- 2 fine sand: 4 grade stone aggregate 20mm nominal size). Crushed including all carriages up to the site of work . | - | CUM | 0.9 | - |
| 5Centering and shuttering including strutting propping etc. and removal of form work in foundation footings basis of colums etc | |||||
| 6Centering and shuttering including strutting propping etc. and removal of form work in suspended floors etc | |||||
| 7Brick work with F.P.S bricks in class designation 75 in superstructure up to all floors in cement mortar 1 cement :4 fine sand mortar including cost of scaffolding and carraige of material up to the site of work. | |||||
| 8Providing and laying in position specified grade of reinforced cement concrete including the cost of centering, shuttering, finishing reinforcement all work up to all levels. 1:1:5:3 1 cement: 1:5 coarse sand: 3 graded stone aggregate 20mm nominal size) Crushed including all carriages up to the site of work . | |||||
| 9Reinforcement of RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors.thermo mechanically heated bars including all carriages up to the site of work . | |||||
| 10Providing and fixing in position door/window/arch windows/ventilater wrought frames chowkats 3 "x 5" of first class imported wood excluding cost of holdfasts and concrete for embedment. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_998632.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .