Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | -11.56% | ₹1.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹2,106.20 (1.76%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.2 L+₹2,106.20 (1.76%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹15,607.50 (13.1%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.4 L+₹15,607.50 (13.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹2,700
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
C/o Concrete wall at graveyard Takian at Paranpilan under ADP(PRI) for year 2026-27, PYT Halqa Paranpilan Block PARANPILAN
2026_RDPR_319182_7
179/Xen/Rew/Bla/2026-27 Dated 03/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹2,700
3 Sept 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
24 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected:all kinds of soil | 4.25 | cum | - | - |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches/Roomes including carriages of Stones | 1.52 | cum | - | - |
| 3 | Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) with 20 % Plum | 17.7 | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 11.34 | sqm | - | - |
| 5 | 6MM thick cement sand plaster in 1:4 mix | 49.01 | sqm | - | - |
| 6 | Carriage of materials from the approved sources to work site by mechnical Transport. | 24.7 | cum | - | - |
| 8 | Add cost of of sign board and photograph (to be paid as per actual) | 1 | job | - | - |
stage.html
html • 0.02 MB
finance_1056342.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1056342.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .