Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical OLD MISSAMARI PO GARUBANDHA PS MISSAMARI DISTT SONITPUR ASSAM 784506 | MISSAMARI | SONITPUR | ASSAM | 784506 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical P O P S MISSAMARI DIST SONITPUR ASSAM 784506 | SONITPUR | ASSAM | 784506 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AMBAGAN TEZPUR TOWN PO PS TEZPUR DIST SONITPUR ASSAM | SONITPUR | ASSAM | 784001 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
27 Jul 2026, 6:00 pmClosed
GE MISSAMARI
PO-Missamari Dist-Sonitpur Assam
REPAIR/MAINT OF DG SETS AND EOT CRANES INCL REPAIRS TO INCINERATOR UNDER GE MISSAMRI
2026_MES_777324_1
8687/E8
Open Tender
Civil Works
Item Rate
270 days
GE MISSAMARI
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE MISSAMARI
₹90,000
Yes
29 Jul 2026
9 Jul 2026
29 Jul 2026
9 Jul 2026
27 Jul 2026
20 Jul 2026
9 Jul 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L Servicing to DG set of capacity 400 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at JALKENDRA
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 1 | Each Job | - | - |
| 2 | M & L for Servicing to DG set of capacity 320 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UH-ALH, Sangrilla Hall, 41 R&O KLP, 11Para SF Central AC plant
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 4 | Each Job | - | - |
| 3 | M & L for Servicing to DG set of capacity 200 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at JALKENDRA-02 Nos, UAV GP-II PH & 6679 Maint Flt 41, R&O/LCH
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 6 | Each Job | - | - |
| 4 | M & L for Servicing to DG set of capacity 125 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at REKHAMARI PH & MRO HUB
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | - | - |
| 5 | M & L for Servicing to DG set of capacity 100 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 180 MH
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 1 | Each Job | - | - |
| 6 | M & L for Servicing to DG set of capacity 82.5 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed for Shivaji Nagar Street Light at UAV (CCR) troop & 571 ASC Bn
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 3 | Each Job | - | - |
| 7 | M & L for Servicing to DG set of capacity 62.5 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at Engr Regt (Stn HQ), for Perimeter lights at Rekhamari and Nepali Basti, Buffle range, 667 MI room, SPS-A CHHATAGHAR
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 6 | Each Job | - | - |
| 8 | M & L for Servicing to DG set of capacity 40 KVA to 45KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at 180 MH Oxygen plant, & Signal centre & 206 Avn.
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 3 | Each Job | - | - |
| 9 | M & L for Servicing to DG set of capacity 35 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at UAV Troop (06 Nos), STP Pratap Nagar
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 7 | Each Job | - | - |
| 10 | M & L for Servicing to DG set of capacity 30 KVA with and including replacement of the worn out spares and drain out engine oil from the sump, cleaning with kerosene oil and filling up with new engine oil as manufacturer recommended grade & quality and testing for smooth running at rated speed complete all as manufacturer’s specifications and as directed The following items to be replaced after a period of 250 to 300 hours run of DG set ( parts must be replaced as per sample obtained in credit) installed at STP SPS-E 571 ASC & MES IB
(i) Fuel filter (Primary & Secondary) - 01 Set
(ii) Spin –on filter for lubricant - 01 No
(iii) Engine oil as per manufacture specifications
(iv) coolent as per manufacture specifications
(v) Air filter - 01 set
(vi) Cleaning of fuel tank - 01 Job
(vii) Tapping adjustment and calibration- 01 job
(viii) Tighting of all nuts, bolts, screws,and any loose parts of DG Set - 01 Job | 2 | Each Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tender 04.pdf
Tender Documents • 0.86 MB
Tender 05.pdf
Tender Documents • 0.67 MB
Tender 01.pdf
Tender Documents • 0.60 MB
Tender 02.pdf
Tender Documents • 0.62 MB
Tender 03.pdf
Tender Documents • 0.19 MB
BOQ_870569.xls
BOQ • 0.47 MB
8687_Dt_Corrigendum.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .