Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,100
Closing Date
29 Jun 2026, 5:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 2 Construction of Fall at Km. 12.600 of Tail Dy.
2026_UPIDC_1144439_38
01.EE.2026-27
Open Tender
Civil Works - Canal
45 days
SAMBHAL
2 documents required · 2 mandatory
₹767
₹7,100
Yes
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
23 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc. | - | CUM | - | - |
| 2 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 3 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 1 | CUM | - | - |
| 4 | Providing and Laying lean concrete (1:4:8) cement concrete including cost of all materials,, labour, T&P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 5 | Providing and Laying M-15 C.C. (1:2:4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 6 | Providing and Laying M-20 C.C.1:1.5:3 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | CUM | - | - |
| 7 | Providing and Laying M-25 C.C.1:1:2 cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | CUM | - | - |
| 8 | Providing and fixing Centering & shuttering for C.C. works (form work of concrete) including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work. | 0.4 | SQM | - | - |
| 9 | Providing and fixing of 63 mm dia P.V.C. pipe in proper position for drainage spout including cost of all material, cutting, jointing , labour, T&P, all lifts and leads etc complete as per direction of Engineer-in-charge. | - | RM | - | - |
| 10 | providing and Laying 12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 1 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD21EE2627.pdf
Tender Documents • 1.86 MB
BOQ_2180147.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid