| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹19.1 L (12.9%)Admitted-Finance | ₹1.7 Cr+₹19.1 L (12.9%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Your bid have been rejected on technical evaluation due to insufficient relevant experience |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Your bid have been rejected on technical evaluation due to insufficient relevant experience |
| Sl No | Description | Qty | Unit | SAPNA TRADERS L1 | I S F Engineers Pvt. Ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Supply,Carraige upto site, Erection, testing and commissioning of 400 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Copper wound ) | 5 | No | 9,50,000 ₹47,50,000 Lowest | 12,75,000 ₹63,75,000 |
| 2.00 | Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 9 Mtr. Long Pole(ST-410 SP33) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) (as per REC Standard) | 25 | No | 21,500 ₹5,37,500 Lowest | 21,700 ₹5,42,500 |
| 3.00 | Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 11 Mtr. Long Pole(ST-410 SP56) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) (as per REC Standard) | 52 | No | 30,000 ₹15,60,000 Lowest | 33,500 ₹17,42,000 |
| 4.00 | Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor) (as per REC Standard) | 9 | Km | 65,000 ₹5,85,000 Lowest | 65,000 ₹5,85,000 Lowest |
| 5.00 | Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor) (as per REC Standard) | 0.25 | Km | 55,000 ₹13,750 | 44,000 ₹11,000 Lowest |
| 6.00 | Supply, Carriage up to site, Installation, testing and Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Polymer Vertical Type (of reputed make) | 8 | Set | 10,000 ₹80,000 Lowest | 12,500 ₹1,00,000 |
| 7.00 | Supply, Carriage up to site, Installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A (of reputed make) | 5 | Set | 4,500 ₹22,500 Lowest | 9,500 ₹47,500 |
| 8.00 | Supply, Carriage up to site, Installation, testing and Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type(of reputed make) | 6 | Set | 3,500 ₹21,000 Lowest | 6,500 ₹39,000 |
| 9.00 | Supply, Carriage up to site, and fixing of GI Channel(75X40X40X6mm)/AngleIron (50X50X6mm)/Flat (50X6mm )of different sizes as per site requirement including clamps fabricated out of (50X8mm) for L.A set/G.O set/Horn Gap/Distribution Board | 800 | Kg | 120 ₹96,000 Lowest | 185 ₹1,48,000 |
| 10.00 | Construction of Transformer Foundation fabricated out GI Channels of sizes (75X40X40X6mm),(100X50X50X6mm) ,GI Pipe of 5 inch Dia 3 mm welded with GI Plate (200x200X6mm) on both sides including the frame to be inserted in concrete foundation for the same | 1,300 | Kg | 130 ₹1,69,000 Lowest | 185 ₹2,40,500 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
22 Jul 2022, 2:00 pmClosed
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
Electrical works for transit accommodation for Kashmiri Migrants at various locations ( Fatehpora Baramulla)
2022_PDD_174288_1
EDB/08
Open Tender
Electrical Works
Turn-key
180 days
Electrical works for transit accommodation for Kas
Please refer Tender documents.
9 documents required · 9 mandatory
₹7,500
Yes
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
₹3.3 L
Yes
12 Sept 2022
16 Jun 2022
23 Jul 2022
16 Jun 2022
22 Jul 2022
18 Jun 2022
16 Jun 2022 - 18 Jun 2022
Amount
Supply,Carraige upto site, Erection, testing and commissioning of 400 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Copper wound )
Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 9 Mtr. Long Pole(ST-410 SP33) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) (as per REC Standard)
Supply,Carraige upto site, Erection, testing and commissioning of Steel Tubular Pole, 11 Mtr. Long Pole(ST-410 SP56) with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) (as per REC Standard)
Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (50mm2 ACSR Conductor) (as per REC Standard)
Supply, Carriage up to site, laying ,stringing, tensioning , binding of ACSR Conductor, (30mm2 ACSR Conductor) (as per REC Standard)
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Polymer Vertical Type (of reputed make)
Supply, Carriage up to site, Installation, testing and Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A (of reputed make)
Supply, Carriage up to site, Installation, testing and Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type(of reputed make)
Supply, Carriage up to site, and fixing of GI Channel(75X40X40X6mm)/AngleIron (50X50X6mm)/Flat (50X6mm )of different sizes as per site requirement including clamps fabricated out of (50X8mm) for L.A set/G.O set/Horn Gap/Distribution Board
Construction of Transformer Foundation fabricated out GI Channels of sizes (75X40X40X6mm),(100X50X50X6mm) ,GI Pipe of 5 inch Dia 3 mm welded with GI Plate (200x200X6mm) on both sides including the frame to be inserted in concrete foundation for the same
Providing, carriage, transportation, Installation etc. of Concrete foundation in 1:2:4 mix of dimensions (1mmX1mmX3.5mm) for GI Pipes of Transformer Bed (0.1 Cum)
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, (of reputed make)
Supply, Carriage up to site, Installation, testing and Commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lightening Impulse 75kV Positive and 80kV Negative, creepage distance 320mm (of reputed make)
Providing, carriage, transportation, Installation etc Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing, carriage, transportation, Installation of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Supply, Carriage up to site, Installation, testing and Commissioning of LT 3-Phase Distribution Box for DTR with 600A MCCB (3-Pole, 36 KA) (Reputed Make) for incomer and 04 No of 160 A MCCB(3-Pole, 25 KA) for outgoing circuits (of reputed make)
Providing, carriage, transportation, Installation etc. of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole (Pit 600x600x1600 mm) for 9 MTR ST Pole
Providing, carriage, transportation, Installation etc. of Cement bottoming 1:2:4 mix as per REC standards 0.6cum/pole (Pit 600x600x1800 mm) for 11 MTR ST Pole
Providing & Painting of Poles with one coat of Red Oxide and two coats of aluminium paint
Supply, Carriage up to site, Installation of Earthing of Poles GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip (as per REC Standard)
Supply, Carriage up to site, Installation of Sundry items like aluminium lugs, Jumpers, binding Tape
Supply, Carriage up to site, Installation of Danger Plates with Clamps (as per REC Standard)
Supply, Carriage up to site, Installation of GI Barbed Wire for Anti Climbing (as per REC Standard)
Supply, Carriage up to site, Installation of Galvinized Nuts and Bolts.
Supply, Carriage up to site, Installation of Wedge Connectors / PG Clamps (as per REC Standard)
Supply, Carriage up to site, Installation, testing and Commissioning of XLPE 185 Sq. mm 3.5 Core Aluminium Armoured Cable of 1.1 KV Grade (Reputed make)
Supply, Carriage up to site, Installation of PVC underground Pipe Class-A including necessary joints/bends
Construction of Earth Chamber/Manhole (1 Ft deep) made of brick masonary with RCC slab cover.(1.5'X1.5')
Supply, Carriage up to site, Installation, testing and Commissioning of LT 3-Phase Distribution Box with 160 A 3 Pole MCCB for incomer (reputed make), 160 Amp Changeover Switch (Euro-Load Type of reputed make), 16 No of 32 Amp (Single Pole) MCCB's(reputed make),16 No of Single Phase Energy Meters(reputed make), RYB indicators, Voltmeter, Ammeter, ASS and VSS (reputed make)
Supply, Carriage up to site, Installation, testing and Commissioning of 70 Sq mm AB HT Cable (3X70 +1X50 Sqmm) (reputed make)
Supply, Carriage up to site, Installation of Heat Shrinkable Outdoor Cable Termination Kit suitable for 70 Sq mm AB HT Cable (3X70 +1X50 Sqmm) (reputed make)
Supply, Carriage up to site, Installation of Suspension/Tension Clamp with eye hook
Supply, Carriage up to site, and fixing of GI Channel(75X40X40X6mm)/Angle (50X50X6mm)//Flat /V Cross Arms (75X40X40X6mm) including clamps fabricated out of (50X8mm).
Supply, Carriage up to site, Installation of Guard Netting
Supply, Carriage up to site, Installation, testing and Commissioning of 5 KVA Single Phase Servo Voltage Stablizer(of reputed make) along with external Rain Proof Panel
Supply, Carriage up to site, Installation, testing and Commissioning of 32 A Two Pole MCB (of reputed make) along with Box
Supply,Carraige upto site, Erection, testing and commissioning of Octogonal GI Pole 8 M Long of 70 mm Dia with Foundation Bolt
Supply, Carriage up to site, Installation, testing and Commissioning of100W LED Street Lights (of reputed make) along with necessary brackets for fixing
Providing, carriage, transportation, Installation etc. of Concrete Foundations for Octogonal GI poles of Dimensions (1.5'X1.5'X4')
Supply,Carraige upto site, Erection, testing and commissioning of 5 A Single Pole MCB (of reputed make) along with the MCB Box and Connector
Supply,Carraige upto site, Erection, testing and commissioning of 10 Sq.mm 2 Core Aluminium Armoured Cable (of reputed make)
Supply, Carriage up to site, Installation,of HDPE Corrugated Flexible Duct Pipe 2 inch dia
Supply, Carriage up to site, Installation, of Sign Board (4x4 feet) along with required accessories like clamps, nuts and bolts etc.
I S F Engineers Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_414679.xls
BOQ • 0.32 MB
SBD08.pdf
Tender Documents • 0.72 MB
Drwaing5.pdf
Other Document • 0.40 MB
IPR_TN_CIVIL_PR_05_2020_BidSecurityDeclarationForm.pdf
Other Document • 0.03 MB
drawing2.pdf
Other Document • 12.05 MB
drawing4.pdf
Other Document • 17.02 MB
Drwaing3.pdf
Other Document • 22.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .