Tender Value
₹3.0 L
EMD Value
₹3,800
Closing Date
6 Mar 2024, 6:00 pmClosed
Project Engineer (Excv), Tapin North OCP
Office of Project Engineer (Excavation), Tapin North OCP, Hazaribagh Area
Repairing of 02 Nos. welding transformers and repairing of 02 Transformer 63KVA, 3.3KV/220V for EKG Shovel at Tapin North OCP, Hazaribagh Area.
2024_CCL_302484_1
PE(X)/Tapin (N) OCP/NIT/23-24/087 Dated 23.02.2024
Open Tender
Excavation Department Work
Item Rate
15 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,800
10 Apr 2024
23 Feb 2024
7 Mar 2024
23 Feb 2024
6 Mar 2024
23 Feb 2024
23 Feb 2024 - 28 Feb 2024
Amount
Part A. Repairing of 02 Nos. welding transformers Copper strips for rewinding of primary and secondary coil. (Value is calculated after deducting 60% scrap value of 32 kg Copper coil)
Insulating material (15% of 32 kg Copper Coil)
Fiber sheet for separator
Repairing of Regulator
Stud with insulator
Railing pipe – 1” for railings
Industrial gas set for straightening of metal sheet, cover, support structure ,platform of welding machine & removing of bulged material from base plate.
Welding electrode for material filling in base plate, support structure & platform of welding machine. [Lomelt 205]
Highly skilled – 01 person per shift X 04 days
skilled – 01 person per shift X 04 days
Welder – 01 person pe shift X 02 Days
Semi-skilled – 02 person per shift X 04 days
Part. B. Repairing of 02 Transformer 63KVA, 3.3KV/220V Copper wire for winding (Value is calculated after deducting 60% scrap value of 84 kg Copper coil)
Cost of insulation (15% of 84 kg Copper Coil)
Brass studs with bushings
Nuts, Bolts and Washers
Highly skilled – 01 person per shift X 08 days
skilled – 02 person per shift X 08 days
Semi-skilled – 03 person per shift X 08 days
Total impact of GST for the purpose of CTC
M/S R.S ENTERPRISES
NATIONAL ENGINEERING WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .