Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹46.3 LAdmitted-Finance AT SAUNTAPUR PO GUDESHIRA PS DIST BARGARH BARGARH | BARGARH | ODISHA | 768027 | L1 | Admitted-Finance | ||
| 2 | L2₹47.8 L+₹1.5 L (3.19%)Admitted-Finance AT PO PAHANDI DIST BARGARH | PAHANDI | BARGARH | ODISHA | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical AT P O RAIHARI DIST MAYURBHANJ | MAYURBHANJ | ODISHA | - | Rejected-Technical Not fulfil the minimum qualifying marks in plants and machineries equipment as per DTCN | ||
| 4 | Rejected-Technical AT BALANDA P O BARPALI P S BIJEPUR DIST BARGARH | BARPALI | BARGARH | ODISHA | 768032 | - | Rejected-Technical Not fulfil the minimum qualifying marks in plants and machineries equipment as per DTCN |
Tender Value
₹50.4 L
EMD Value
₹50,423
Closing Date
17 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER (R AND B) DIVISION BGH
O/O THE SUPERINTENDING ENGINEER (R AND B) DIVISION BARAGADA, AT-NEAR GOVT BUS STAND INFRONT OF WOMENS COLLEGE BARAGADA
BUILDING WORK (CIVIL, EI AND PH)
2026_EICCL_137804_1
IFB-SE PWD BGH No.05 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
BIJEPUR
2 documents required · 2 mandatory
₹10,000
₹50,423
Yes
4 Nov 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
4 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other machineries required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess. | 95.02 | cum | 282.9 | ₹26,881.16 |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | 61.36 | cum | 899.1 | ₹55,168.78 |
| 3 | Providing Cement Concrete (1:3:6) in foundation with 4cm nominal size of crusher broken hard granite metal of approved quality from approved quarry including hoisting, lowering, and laying in postition in layers not exceeding 150mm. thick with proper packing and ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc. complete in all respect as per the specification and including 1% cess as per direction of the Engineer-in-Charge | 36.24 | cum | 6,054.4 | ₹2,19,411.46 |
| 4 | Brick work with Fly Ash Brick Masonry in Cement Mortar (1:6) using bricks (25 Cm. x 12Cm. x 8Cm.) in foundation and plinth as per direction of EIC | 42.96 | cum | 5,686.5 | ₹2,44,292.04 |
| 5 | Brick work with Fly Ash Brick Masonry in Cement Mortar (1:6) using bricks (25 Cm. x 12Cm. x 8Cm.) in Superstructure as per EIC | 59.18 | cum | 5,724.8 | ₹3,38,793.66 |
| 6 | 1st Floor | 27.4 | cum | 6,110.8 | ₹1,67,435.92 |
| 7 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering, and curing for four weeks finishing the exposed surface and ceiling smooth, providing grooves or beads where necessary including cost, conveyance royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or tor steel and binding wires and tying the grills and placing in proper position in all floors.as per the specification and direction of the EIC.
Column Base | 27.92 | cum | 6,965.8 | ₹1,94,485.14 |
| 8 | Column in Superstructure | 5.4 | cum | 16,348.7 | ₹88,282.98 |
| 9 | Stair case | 3.46 | cum | 16,210.8 | ₹56,089.37 |
| 10 | 1st Floor | 1.8 | cum | 23,885.6 | ₹42,994.08 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.90 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_604466.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .