Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹41.8 LAccepted-Finance GRAM RITHONIYA MORENA MORENA MADHYA PRADESH 476224 | MORENA | MADHYA PRADESH | 476224 | ₹41.8 L | L-1 | Accepted-Finance As per TEC report |
| 2 | L-2₹48.7 L+₹6.9 L (16.6%)Rejected-Finance | ₹48.7 L+₹6.9 L (16.6%) | L-2 | Rejected-Finance As per TEC report |
| 3 | L-3₹51.1 L+₹9.3 L (22.2%)Rejected-Finance | ₹51.1 L+₹9.3 L (22.2%) | L-3 | Rejected-Finance As per TEC report |
Tender Value
₹55.3 L
EMD Value
₹1.1 L
Closing Date
8 May 2026, 10:00 amClosed
CGMT, BSNL, Rajasthan, Jaipur
O/o CGMT, BSNL, Sardar Patel Marg, C-Scheme, Jaipur (Rajasthan)-302008
OFC rehabilitation and patch work in Kota OA of Kota BA.
2026_BSNL_274949_1
RJCO-23/11(11)/24/2025-TX AND MM Dated 17.04.2026
Open Tender
Miscellaneous Services
Tender cum Auction
365 days
Rajasthan
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
Yes
ACCOUNTS OFFICER (Cash), O/o CGMT, BSNL, Jaipur
₹1.1 L
Yes
AGM (TP), C.O., Jaipur, Room No. 67, Ist Floor
9 Jul 2026
17 Apr 2026
11 May 2026
17 Apr 2026
8 May 2026
17 Apr 2026
17 Apr 2026 - 24 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXCAVATION OF TRENCHES | |||||
| 1.01 | Excavation trenches in Normal/Soft soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | - | - |
| - | Excavation trenches in Hard/Morum soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | - | - |
| - | Excavation trenches in Soft Rocky soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | - | - |
| - | Excavation trenches in Hard Rocky soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | - | - |
| - | Horizontal Directional Drilling for laying U/G PLB/HDPE Pipes up to 50mm dia to a standard depth of 1.65m as specified in laying practices of OF Cable by HDD method | - | per M | - | - |
| - | For pulling each additional pipe up to 50mm dia by HDD beyond one pipe. | - | per M | - | - |
| 2LAYING OF PLB UP TO 50mm DIAMETER AND JOINTING WITH COUPLER (Material to be supplied by BSNL) | |||||
| 2.01 | (ii) 1st pipe | - | per M | - | - |
| - | Each additional pipe | - | per M | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BIDDocOFCrehabilitationKotaOA.pdf
Tender Documents • 1.57 MB
BOQ_321145.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .