| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 LAccepted-Finance | ₹2.9 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹3.9 L+₹1.1 L (37.3%)Rejected-Finance | ₹3.9 L+₹1.1 L (37.3%) | L-2 | Rejected-Finance Lowest-2 |
| 3 | L-3₹4.1 L+₹1.3 L (44.0%)Rejected-Finance | ₹4.1 L+₹1.3 L (44.0%) | L-3 | Rejected-Finance Lowest-3 |
| 4 | L-4₹4.2 L+₹1.3 L (46.7%)Rejected-Finance | ₹4.2 L+₹1.3 L (46.7%) | L-4 | Rejected-Finance Lowest-4 |
| Sl No | Description | Qty | Unit | M/S RIDHI CONSTRUCTION COMPANY L2 | Uphill Engineers L3 | KIRAN L1 | SURAJ KUMAR RATTAN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||||
| 1.01 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 24.9 | Sqm | 468 ₹11,653.2 | 495 ₹12,325.5 | 300 ₹7,470 Lowest | 485 ₹12,076.5 |
| 2.00Providing and laying cement concrete 1:1.5:3 ( 1 cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size )and curing complete excluding the cost of form work and reinforcement for RCC work in:- | |||||||
| 2.01 | Vertical walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 3.68 | Cum | 7,995 ₹29,421.6 | 8,250 ₹30,360 | 7,500 ₹27,600 Lowest | 8,450 ₹31,096 |
| 3.00Providing, supplying and fixing of MS angle with welding in truss purline, rafter and post complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | |||||||
| 3.01 | 65x65x6 mm | 152.6 | Kg. | 648 ₹98,884.8 | 675 ₹1,03,005 | 425 ₹64,855 Lowest | 655 ₹99,953 |
| 3.02 | 45x45x5 mm | 125.6 | Kg. | 541 ₹67,949.6 | 545 ₹68,452 | 299 ₹37,554.4 Lowest | 575 ₹72,220 |
| 4.00 | Providing and fixing 0.60 mm thick prepainted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primar coating including fixing with prepainted iron J or L hooks, bolts and nuts 6 mm dia meter with prepainted limpet and rubber washers complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 132.82 | Sqm | 1,148 ₹1,52,477.36 | 1,250 ₹1,66,025 | 900 ₹1,19,538 Lowest | 1,295 ₹1,72,001.9 |
| 5.00 | Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 331.29 | Kg. | 101 ₹33,460.29 | 99 ₹32,797.71 | 90 ₹29,816.1 Lowest | 101 ₹33,460.29 |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
14 Jul 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_137828_1
EE-JSD-BGI-TA-Tender/2026- 9228-78 dt. 1/7/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
Yes
₹7,800
Yes
6 Aug 2026
2 Jul 2026
14 Jul 2026
2 Jul 2026
14 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||
| 1.01 | Vertical surface such as walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 24.9 | Sqm | - | - |
| 2Providing and laying cement concrete 1:1.5:3 ( 1 cement: 1.5 sand: 3 graded stone aggregate 20 mm nominal size )and curing complete excluding the cost of form work and reinforcement for RCC work in:- | |||||
| 2.01 | Vertical walls (any thickness) partitions and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 3.68 | Cum | - | - |
| 3Providing, supplying and fixing of MS angle with welding in truss purline, rafter and post complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | |||||
| 3.01 | 65x65x6 mm | 152.6 | Kg. | - | - |
| 3.02 | 45x45x5 mm | 125.6 | Kg. | - | - |
| 4 | Providing and fixing 0.60 mm thick prepainted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating to back coat of polyster of 5 microns over 5 microns primar coating including fixing with prepainted iron J or L hooks, bolts and nuts 6 mm dia meter with prepainted limpet and rubber washers complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 132.82 | Sqm | - | - |
| 5 | Providing Mild steel/Tor steel reinforcement for RCC work including bending, binding and placing in position complete up to floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 331.29 | Kg. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.27 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
FORM6_2.pdf
Tender Documents • 0.65 MB
TC.pdf
Tender Documents • 0.15 MB
BOQ_204028.xls
BOQ • 18.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .