| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance LOW RATE |
| 2 | L2₹5.2 L+₹19,800.59 (3.95%)Accepted-Finance | ₹5.2 L+₹19,800.59 (3.95%) | L2 | Accepted-Finance SECOND BIDDER |
| Sl No | Description | Qty | Unit | SHARAFUDHEEN M K L1 | ANIL KUMAR M L2 |
|---|---|---|---|---|---|
| 1.00REPAIR WORKS OF PUBLIC WELL | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.92 | cum | 1,770 ₹5,163.09 Lowest | 1,837.5 ₹5,359.99 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 18 | hour | 287 ₹5,166 Lowest | 298.06 ₹5,365.08 |
| 1.00 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 113.91 | sqm | 17 ₹1,936.5 Lowest | 17.67 ₹2,012.83 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 71.46 | cum | 214 ₹15,293.08 Lowest | 222.26 ₹15,883.37 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 686.01 | cum | 109 ₹74,775.31 Lowest | 113.03 ₹77,539.94 |
| 1.01 | OD528975/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 4.31 | cum | 5,086 ₹21,915.57 Lowest | 5,278.83 ₹22,746.48 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 72.8 | sqm | 307 ₹22,350.83 Lowest | 319.01 ₹23,225.2 |
| 1.01 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 164.07 | sqm | 174 ₹28,547.83 Lowest | 180.54 ₹29,620.84 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,480.6 | kg | 148 ₹2,19,128.21 Lowest | 153.94 ₹2,27,922.95 |
Tender Value
₹5.7 L
EMD Value
₹14,190
Closing Date
24 Jul 2026, 3:00 pmClosed
REESHNA VENU
MULIYAR GP
Annual Plan-MULIYAR GP REPAIR WORKS OF PUBLIC WELL WITHIN THE PANCHAYAT AREA-PRO.NO-343/25-26 RETENDER
2026_LSGD_858639_35
01/26-27/AE/LID EW/MLR
Open Tender
Civil Works - Others
Item Rate
180 days
MULIYAR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,255
Yes
₹14,190
Yes
31 Aug 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1REPAIR WORKS OF PUBLIC WELL | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | - | - |
| 1.002 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.003 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 0.8 | sqm | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.2 | cum | - | - |
| 1.005 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.8 | cum | - | - |
| 1.006 | OD528975/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | - | cum | - | - |
| 1.007 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 0.6 | sqm | - | - |
| 1.008 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 0.2 | sqm | - | - |
| 1.009 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 0.4 | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1456140.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.56 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
AFF.pdf
Tender Documents • 0.23 MB
BOQ_1456140.xls
BOQ • 0.32 MB
PA.pdf
Tender Documents • 0.25 MB
FT.pdf
Tender Documents • 0.24 MB
SBD.pdf
Tender Documents • 1.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .