| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-Finance | ₹5.4 Cr | L1 | Accepted-Finance As per financial evaluation |
| 2 | L2₹5.8 Cr+₹37.0 L (6.81%)Rejected-Finance VILLAGE PATHRA POST BADGO THANA KHORABAR DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | ₹5.8 Cr+₹37.0 L (6.81%) | L2 | Rejected-Finance As per financial evaluation |
| 3 | L3₹5.8 Cr+₹38.2 L (7.02%)Rejected-Finance CHANDAN NAGAR P O RAUJA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | ₹5.8 Cr+₹38.2 L (7.02%) | L3 | Rejected-Finance As per financial evaluation |
| 4 | Rejected-Technical 17 1 CHOPAN ROAD OBRA OBRA OBRA SONBHADRA UTTAR PRADESH 231219 | SONBHADRA | UTTAR PRADESH | 231219 | - | - | Rejected-Technical As per technical bid evaluation |
| Sl No | Description | Qty | Unit | M/S AJIT CONSTRUCTION AND ORDER SUPPLIER L2 | M/S GOPAL RAI L3 | Sudha Associates L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of R.C.C.work including stacking of dismantl material with all charges etc complete. | 291 | Cum | 365 ₹1,06,215 Lowest | 571.58 ₹1,66,329.78 | 534.08 ₹1,55,417.28 |
| 2.00 | Dismantling of Brick work in cement Mortar including stacking of dismantl material with all charges etc complete. | 2,847.98 | Cum | 220 ₹6,26,555.6 Lowest | 434.4 ₹12,37,162.51 | 405.9 ₹11,55,995.08 |
| 3.00 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 4,565.44 | Cum | 50 ₹2,28,272 Lowest | 69.35 ₹3,16,613.26 | 64.8 ₹2,95,840.51 |
| 4.00 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 715.26 | Sqm | 90 ₹64,373.4 Lowest | 160.04 ₹1,14,470.21 | 149.54 ₹1,06,959.98 |
| 5.00 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 571.17 | Cum | 8,150 ₹46,55,035.5 | 8,370.91 ₹47,81,212.66 | 7,821.71 ₹44,67,526.1 Lowest |
| 6.00 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 8,021.23 | Sqm | 650 ₹52,13,799.5 Lowest | 777.34 ₹62,35,222.93 | 726.34 ₹58,26,140.2 |
| 7.00 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 3,327.14 | Cum | 9,250 ₹3,07,76,045 | 9,075.09 ₹3,01,94,094.94 | 8,479.69 ₹2,82,13,115.79 Lowest |
| 8.00 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials, T&P and labour etc complete. | 338.33 | Cum | 9,450 ₹31,97,218.5 | 9,593.31 ₹32,45,704.57 | 8,963.91 ₹30,32,759.67 Lowest |
| 9.00 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. (Reinforcement bar of TATA/SAIL/JINDAL, Fe 415 shall be used only) | 96.65 | MT | 75,500 ₹72,97,075 | 60,680.69 ₹58,64,788.69 | 56,699.54 ₹54,80,010.54 Lowest |
| 10.00 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 1,640 | Hrs | 55 ₹90,200 Lowest | 144.8 ₹2,37,472 | 135.3 ₹2,21,892 |
Tender Value
Refer Docs
EMD Value
₹15.6 L
Closing Date
21 Jul 2026, 2:00 pmClosed
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
Reconstruction of damaged V.R.B. on the main canal and minor under the Surhatal Pump Canal in Ballia.
2026_UPIDC_1168611_3
05/SE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balllia
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹15.6 L
Yes
31 Aug 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of R.C.C.work including stacking of dismantl material with all charges etc complete. | 291 | Cum | - | - |
| 2 | Dismantling of Brick work in cement Mortar including stacking of dismantl material with all charges etc complete. | 2,847.98 | Cum | - | - |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 4,565.44 | Cum | - | - |
| 4 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 715.26 | Sqm | - | - |
| 5 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 571.17 | Cum | - | - |
| 6 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 8,021.23 | Sqm | - | - |
| 7 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 3,327.14 | Cum | - | - |
| 8 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials, T&P and labour etc complete. | 338.33 | Cum | - | - |
| 9 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. (Reinforcement bar of TATA/SAIL/JINDAL, Fe 415 shall be used only) | 96.65 | MT | - | - |
| 10 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 1,640 | Hrs | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.73 MB
BID03.pdf
Tender Documents • 1.47 MB
BOQ_2192289.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .