Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
17 Oct 2026, 6:00 pm
Executive Engineer, Drainage Division, Gandhinagar
Operation, maintenance, and repair of all civil, electrical, and mechanical components, including the Patan (Matpur) & Kalyana Pumping Station, civil structures, M.S. pipeline, and distribution network, ensuring efficient and reliable water supply to all outlets under the Patan (Matpur)-Dindrol Lift Irrigation M.S. Pipeline Project for a period of three years (2026–2029).
346202
07 of 2026 – 2027
Open
Pipes and Pipe related activities
Works
Gandhinagar
14 documents required · 14 mandatory
₹6,000
Executive Engineer Drainage Division Gandhinagar
₹3.8 L
18 Sept 2026
18 Sept 2026
18 Sept 2026
17 Oct 2026
18 Sept 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Speci ications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and veri ied
by the Engineer and valued at the rates and prices tendered in the priced Bill of
Quantities, where applicable, and otherwise at such rates and prices as the Engineer
may ix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all c o n s t r u c t i o n a l plant,
layout, supervision, materials, erection, maintenance, insurance, pro it, taxes and
duties, together with all general risks, liabilities and obligations set out or implied in
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed to
enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for the
related items of Work.
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the
contract documentation shall be made before entering rates or prices against each
item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
speci ication for Road and Bridge works. For building works speci ications for building
are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 25 of the Instructions to Bidder.
10. Rock is de ined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed air
drilling for its removal, and which cannot be extracted by ripping with a tractor of at
least 150 kw with a single rear mounted heavy duty ripper.
satisfactory operation, maintenance and functioning of the system as speci ied, shall
not be paid for separately by the Employer when executed, and shall be deemed to have
been already covered under other items and rates quoted in Schedule-B.
12. Firm Price and Taxes: The rates quoted by the bidder shall be irm and ixed, inclusive
of all taxes, duties, octroi, works contract tax and other levies, but exclusive of GST, for
the entire contract period of 36 months without any price escalation or price variation.
13. Condition of Payment
Payment Schedule:
released on a monthly basis, calculated on per-day basis, as per the following pattern:
First year : 30% of tendered cost
(The maximum payment admissible for the irst year shall
be limited to 30% of the tendered cost.)
Second year : 35% of tender cost.
(The maximum payment admissible for the second year
shall be limited to 35% of the tendered cost.)
Third year : 35% of tender cost.
(The maximum payment admissible for the third year shall
be limited to 35% of the tendered cost.)
14. Arrangement of Vehicles for Supervision:
For smooth and ef icient O&M of the entire project, the Contractor shall keep a four-
wheeler such as car/jeep utility vehicle in working condition at the Sub-Divisional
Of ice, available as and when required throughout the contract period, including driver
and fuel charges at his own cost. In case of failure to provide the same, penalty shall be
applicable as per Clause No. 66 of Chapter-II - Special Technical Conditions.
15. Resolution of Discrepancy:
For anything mentioned in this document, in case of any discrepancy, the inal verdict
regarding provisions and criteria shall be as per N.W.R.W.S. & K. Resolution No.
DRAINAGE DIVISION – GANDHINAGAR
Drainage Sub Division, Gandhinagar
Operation, maintenance, and repair of all civil, electrical, and mechanical components, including
the Patan(Matpur) & Kalyana Pumping Station, civil structures, M.S. pipeline, and distribution
network, ensuring ef icient and reliable water supply to all outlets under the Patan(Matpur)-
Dindrol Lift Irrigation M.S. Pipeline Project for a period of three years (2026–2029).
Annexure-2 Bill of Quantities
Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item
(with brief specification and reference to book Quantity Unit Amount
of specifications)
Standard Manpower Deployment:
Item for Manpower Deployed for 365 Days per
Operation, maintenance, and repairs of all civil,
electrical, and mechanical components, including
Patan(Matpur) Pumping Station, civil structures,
M.S. pipeline, and distribution network, to ensure
reliable water supply to all outlets under the
Patan(Matpur)-Dindrol Lift Irrigation M.S. Pipeline
Project for a period of three years (2026–2029),
including deployment of required manpower for
round-the-year inspection, maintenance, and
operation, as well as obtaining insurance coverage
for labour and for the pumping station, including
all civil, electrical, mechanical, and
instrumentation components, etc. complete.
This item shall be paid for deploying
manpower as de ined in Scope of work for O&M
of the pumping station and its pipeline network
for all the days in the year whether the Pumps
are operational or not due to demand or
availability of water.
Additional Manpower Deployment (for
Additional Manpower to be deployed during
Days when the Pumps are in Operational
Operation, maintenance, and repairs of all civil,
electrical, and mechanical components, including
Patan(Matpur) Pumping Station, civil structures,
2 M.S. pipeline, and distribution network, to ensure 510 Days 11258.00
reliable water supply to all outlets under the
Patan(Matpur)-Dindrol Lift Irrigation M.S. Pipeline
Project for a period of three years (2026–2029),
with provision for deployment of additional
manpower for additional 170 days during pipeline
operation for water distribution, Dindrol-
Mukteshwar Pipeline and SSC-2 Phase-2 Project
and allied activities, complete.
This item shall be paid for deploying additional
manpower as de ined in Scope of work for O&M
of the pumping station and its pipeline network
for the speci ic days in the year when the
Pumps are operational.
Standard Manpower Deployment:
The Manpower Deployed for 365 Days per
Operation, maintenance, and repairs of all civil,
electrical, and mechanical components, including
Kalyana Pumping Station, civil structures, M.S.
pipeline, and distribution network, to ensure
reliable water supply to all outlets under the
Patan(Matpur)-Dindrol Lift Irrigation M.S. Pipeline
Project for a period of three years (2026–2029),
including deployment of required manpower for
round-the-year inspection, maintenance, and
operation, as well as obtaining insurance coverage
for labour and for the pumping station, including
all civil, electrical, mechanical, and
instrumentation components, etc. complete.
This item shall be paid for deploying
manpower as de ined in Scope of work for O&M
of the pumping station and its pipeline network
for all the days in the year whether the Pumps
are operational or not due to demand or
availability of water.
Additional Manpower Deployment (for
Additional Manpower to be deployed during
Days when the Pumps are in Operational
Operation, maintenance, and repairs of all civil,
electrical, and mechanical components, including
Kalyana Pumping Station, civil structures, M.S.
pipeline, and distribution network, to ensure
reliable water supply to all outlets under the
Patan(Matpur)-Dindrol Lift Irrigation M.S. Pipeline
Project for a period of three years (2026–2029),
with provision for deployment of additional
manpower for additional 170 days during pipeline
operation for water distribution, Dindrol-
Mukteshwar Pipeline and SSC-2 Phase-2 Project
and allied activities, complete.
This item shall be paid for deploying additional
manpower as de ined in Scope of work for O&M
of the pumping station and its pipeline network
for the speci ic days in the year when the
Pumps are operational.
Total Cost (Rs.)
Rupees Three Crore Seventy Five Lakh Eighty Six Thousand Eight Hundred Sixty Five Only
I/We am/are willing to carry out the work at……………………………………. % above/below percent
(Should be written in igures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to Rs. Estimated amount put to Rs.
Deduct………………………. Rs. Add……………………………% Rs.
Net Rs. Net Rs.
In words :: In words ::
* (Please strike out whichever is not applicable)
NOTE 1: All work shall be carried out as per Public Works Department Handbook and other
specifications of division or as directed.
NOTE 2: All the columns in schedule should be filled in ink and the total of the entries in the
last column should be struck by the contractor under his signature. Site, moisture,
NOTE 3: Rates quoted include clearance of site (Prior to commencement of work and at tis
close) in all respects and hold good for work under all conditions.
NOTE 4: To be on additional sheets, if found necessary.
Signature of Contractor Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. NIT OANDM Patan (Matpur) and Kalyana Pumping Station.pdf
02-SBD-DTP-PDPL-OANDM-2026-29-3YEARS.pdf
03-TECHNICAL-SPECIFICATION-DTP-PDPL-OANDM-2026-29-3YEARS.pdf
04 - PREAMBLE WITH BOQ-DTP-PDPL-OANDM-2026-29-3YEARS.pdf
05 Schedule-B OANDM PDPL.pdf
NOTICE NO 07.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .