Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | -38.02% | ₹6.5 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 L+₹10,732.66 (1.66%)Admitted-Finance | -36.99% | ₹6.6 L+₹10,732.66 (1.66%) | L2 | Admitted-Finance |
| 3 | L3₹6.8 L+₹30,322.38 (4.70%)Admitted-Finance | -35.11% | ₹6.8 L+₹30,322.38 (4.70%) | L3 | Admitted-Finance |
| 4 | L4₹6.8 L+₹31,260.18 (4.84%)Admitted-Finance | -35.02% | ₹6.8 L+₹31,260.18 (4.84%) | L4 | Admitted-Finance |
| 5 | L5₹6.8 L+₹38,762.63 (6.00%)Admitted-Finance | -34.30% | ₹6.8 L+₹38,762.63 (6.00%) | L5 | Admitted-Finance |
Tender Value
₹10.4 L
EMD Value
₹20,840
Closing Date
5 Jun 2026, 4:00 pmClosed
Executive Engineer PWD RandB Divisin Thanamandi
Executive Engineer PWD RandB Divisin Thanamandi
Construction of Resource Room at Boys Middle School Plangarh
2026_PWDJK_310593_4
NIT No 04 of 2026 27 Dated 21 05 2026
Open Tender
Civil Works
Percentage
60 days
Thanamandi
Construction of Resource Room at Boys Middle School Plangarh
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Divisin Thanamandi
₹20,840
12 Jun 2026
21 May 2026
6 Jun 2026
21 May 2026
5 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil : | 6.71 | Cum | 256.85 | ₹1,723.46 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1.06 | Cum | 218.4 | ₹231.5 |
| 3 | Stone filling hand packed in horizontal on level including cost of stones. | 9.06 | Cum | 937.9 | ₹8,497.37 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 9.81 | Cum | 5,202.9 | ₹51,040.45 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.34 | Cum | 4,826.5 | ₹6,467.51 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.12 | Cum | 5,733.6 | ₹12,155.23 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) .Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 12.63 | Cum | 9,027.2 | ₹1,14,013.54 |
| 8 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately) Second class deodar wood | 0.26 | Cum | 1,51,248.45 | ₹39,324.6 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.31 | Cum | 7,788.4 | ₹25,779.6 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.97 | Cum | 9,821.85 | ₹1,17,567.54 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1004586.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .