Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹40.5 L
EMD Value
₹47,810
Closing Date
27 Jan 2026, 6:10 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (Mech.),Gandhinagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt).
263333
24 of 2025-26
Open
Mechanical - All
Works
Gandhinagar
13 documents required · 12 mandatory · 1 optional
₹1,770
Yes
Gujarat Maritime Board NON PLD, Gandhinagar
₹47,810
Yes
12 Jan 2026
12 Jan 2026
12 Jan 2026
27 Jan 2026
12 Jan 2026
NAME OF WORK:- SR to Dredger U B Pavankumar for
Intermediate IRS survey at Bedi Port (3rd
Amount Put To Tender: - Rs. 40,51,310/-
DTP containing pages number from 1 to
Recommended to approval as per norms.
AAE (M), AAE (E) Dy. Executive engineer (M), Dy. Executive Engineer (E),
GMB, Gandhinagar Dredging GMB, Gandhinagar GMB, Gandhinagar
Executive Engineer (M),
GMB, Gandhinagar
The Executive Engineer (Mech.), PIU, Jamnagar
4th floor, Saru section road,
Jamnagar- 361 006 (Gujarat) India
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
The Tender Document Contains Pages number from 01 to
Sr. No. Particulars. Page No
3. CHAPTER-1: BID NOTICE 3 to
4. CHAPTER-2: GENERAL INFORMATION 5 to
5. CHAPTER-3: INSTRUCTIONS TO THE BIDDERS 7 to
6. CHAPTER-4: PQ FORMS / ANNEXURES I to VIII 14 to
CHAPTER-5: TECHNICAL DETAILS OF THE
8. CHAPTER-6: SCOPE OF WORK 23 to
9. CHAPTER-7: STANDARD BIDDING DOCUMENT 24 to
CHAPTER-8: TENDER FORM FOR ELECTRICAL
10. CHAPTER-9: SCHEDULE – B (BILL OF QUANTITY) 161 to
11. CHAPTER-10: ITEM TECHNICAL SPECIFICATION 176 to
12. CHAPTER-11: GENERAL SPECIFICATION 193 to
13. CHAPTER-12: GENERAL CONDITIONS 196 to
14. CHAPTER-13: SPECIAL CONDITIONS 201 to
15. CHAPTER-14: GENERAL ARRANGEMENT 205 TO
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-1: BID NOTICE
Notice Inviting On-Line Tender
Details about Tender:-Tender Notice No. 17 Of 2025-26.
Department Name :- Gujarat Maritime Board
Circle :- Superintending Engineer (M), GMB
Gandhinagar -382010
Division :- Executive Engineer, (Mech),GMB
IFB No. :- Tender Notice No. 24 Of 2025-26.
Name of Work :- SR to Dredger U B Pavankumar for Intermediate IRS
survey at Bedi Port (3rd attempt).
Estimated Contract Value :-
Period of Completion (in :-
Bidding Type :- Open
Joint venture :- Not applicable
Bid Call (Nos.) :-
Tender Currency Type :- Single
Tender Currency Settings :- Indian Rupee
Bid Document Fee :- Rs.1770/- BY Demand Draft ( Non Refundable )
Bid Document Fee Payable :- Gujarat Maritime Board NON PLD, Gandhinagar
in name of Payable at Gandhinagar.
EMD (INR) :- Rs.47,810/- having Six Months Validity
EMD in favour of :- Executive Engineer (Mech.) GMB Gandhinagar,
payable at Gandhinagar.
Bid Document Downloading :-
12/01/2026 onwards
Pre Bid Date 19/01/2026 At 12:30 PM
Bid Document Downloading :-
Last Date & Time for :-
Uploading (Submission) of 27/01/2026 Upto 18:10 hrs
Bid Validity Period :- 120 days after opening of price bid
Submission of Tender Fees, :- The Bidder will have to submit the following required
EMD etc. through documents in electronic format only through online
/RPAD/Speed post in Office scanning and same has to submit in Physical form
of Executive Engineer send the same documents in a sealed envelope through
(Mech.), Gujarat Maritime RPAD/Speed Post only up to 18:00 hours dtd.
Board, 5th floor, Sagar 28/01/2026 to 04/02/2026 during office hours at the
Bhavan, GMB Office Office of Executive Engineer (Mech.), Gujarat Maritime
Complex, Sector – 10 A, Board, 5th floor, Sagar Bhavan, GMB Office Complex,
Opp. Air Force Station, Sector – 10 A, Opp. Air Force Station, CHH-Road,
CHH-Road, Gandhinagar- Gandhinagar- 382010 (Gujarat) India mentioning the
382010 (Gujarat) India. name of work on the envelop.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
1. Letter of Application (As per Performa )
2. Tender Fee DD of Rs.1770/-
3. EMD of Rs.47,810 /- in the form of FDR
5. Copy of GST Registration
6. Bank Solvency issued on or after 01-01-2025 from
nationalized bank /scheduled bank or govt.
approved bank for tendering purpose not less than
Rs.8.11 Lakhs/-
7. PQ Forms / Annexures I to VI (Along with
supporting documents
Remarks :- Vendor shall submit their offer only in electronic
format on website, after digitally signing the same.
Offers that are not digitally signed will not be accepted.
Phone / Fax/email [email protected], [email protected],
Online Bid Opening Date :- 05/02/2026 at 1200 hrs (if possible )
Officer Inviting Bids :- Executive Engineer (M), GMB, Gandhinagar
Superintending Engineer (M), GMB,
Bid Opening Authority :-
Gandhinagar -382010
GUJARAT MARITIME BOARD,
Address :- 5th Floor, Sagar Bhavan, Sector 10,A, Opp. Air Force,"
Chh Road, Gandhinagar-382010, GUJARAT, INDIA
(1) Bidders can download the tender document free of cost from the website
nprocure.com or www.gmbports.org
(2) Bidders have to submit the bid in Electronic form on www.nprocure.com website
till the Last Date & time for submission.
(3) For vendors free training camp is being organized every Saturday between
to 5.00 P.M. at (n) code solutions-A Division of GNFC Ltd., Ahmadabad. Vendors
are requested to take benefit of the same.
(4) Government of Gujarat, & Governor MAY BE READ AS GUJARAT MARITIME
BOARD, & CHAIRMAN respectively.
Bidders who wish to participate in online tenders will have to procure / should
have legally valid Digital Certificate as per Information Technology Act-2000 using
it they can sign their electronic bids. Bidders can procure the same from any of
license certifying Authority of India or can contact (n) code solutions-A division
GNFC Ltd, who are licensed Certifying Authority by Govt. of India.
All bids should be digitally signed, for details regarding Digital Signature
Certificate related training involved the below mentioned address should be
(n) Code Solutions, A division of GNFC,301, GNFC Info Tower, Bodakdev,
E-mail: [email protected], Web-site: www.gmb.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
Other Terms & Conditions as per detailed tender documents
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-2: GENERAL INFORMATION
The Gujarat Maritime Board (GMB) was set up on 5th April 1982 under Gujarat Maritime Board
Act, 1981, in order to develop, administer, operate and regulate the state’s port sector. In
1998/99 GMB constructed the building of its Head Office as a cornerstone for controlling and
coordinating various ports activities. Gujarat Maritime Board (GMB) on behalf of Chairman
invites on line e - Tender offer for the work of "SR to Dredger U B Pavankumar for
Intermediate IRS survey at Bedi Port (3rd attempt)." Work details are given in the scope of
work category of this tender. The time limit considered is 03 (Three) months.
2.2 Site Information
The contractor has to carry out the said work at GMB Dry-dock, Bedi Port - Jamnagar.
Contractor is strongly advised to visit the site and acquainted himself with the site condition
its surrounding etc. in view of performing the scope of tender.
2.3 Definition:
In the contract as hereinafter defined, the following words and expressions shall have the
meaning hereby assigned to them except where the context otherwise requires.
The Expression “Board”: means Gujarat Maritime Board constituted under the Gujarat
Maritime Board Act
The expression “Work” where used in this document shall, unless there be something
in the subject or contest repugnant to such construction, be constructed to mean the
work or the work contracted and to be executed under or in virtue of the contract,
whether temporary or permanent and whether originally or altered, substituted or
additional. It shall include all extra or excess works and variations and be subject to all
commissions ordered in accordance with these conditions.
“Site” means the Dock/land, jetty and/or other places on, stacking area, under, in or
through which works are to be executed or carried out and services to be rendered any
other lands or places provided by Gujarat Maritime Board for the purpose of the
contract together with such other places that may be specifically designated in the
contract as forming part of the site.
“Contract” means the notice inviting tenders, general conditions of contract, terms
and conditions of contract, specifications, price bid, tender and contract agreement
made at the time of awarding the work and also the mutual agreement made jointly
during contract period.
“Bidder”/” Contractor” shall mean the person or persons, firm, company or
corporation who’s tender has been accepted by the GMB and includes Bidder’s/
Contractor’s personal representative, successors and permitted assignees or joint
Bidders who shall be deemed to be bound jointly and separately.
“Contract Period” means total time limit allowed for this work i.e.03 months from the
date of issue of work order by Executive Engineer (Mech.), GMB, PIU-Jamnagar for " SR
to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port” means total
quantity in the items mention in the Bill of Quantities which may be increased or
decreased as mentioned in the tender document which approved by the Competent
“Engineer-in-charge” (EIC) shall mean the Executive Engineer (M), GMB, Jamnagar or
his authorized representative who shall exercise only such authority on behalf of the
Executive Engineer as may have been delegated to him from time to time by the
Executive Engineer and powers delegated to him by the Government/GMB Rules.
“Approved” means approval given in writing including verbal approval for which
subsequent written confirmation is given and “approval” means approval in writing
including as aforesaid.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
“Competent authority” Officer or officers of the Gujarat Maritime Board competent to
exercise the powers conferred upon him/them by the GMB/Government.
Drawings” means the drawings referred to in the specifications and attached with the
agreement and any modifications of such drawings approved in writing by the
classification society / EIC or such other drawings as may, from time to time be
furnished or approved in writing by the EIC.
2.4 Abbreviations:
GMB / Board - Gujarat Maritime Board / Employer
EIC - Engineer-In-Charge or Engineer
AR - Authorized Representative.
BOQ - Bill of Quantities.
BIS - Bureau of Indian Standard.
SE (Mech) - Superintending Engineer (Mechanical)
XEN (Mech) - Executive Engineer (M).
DEE (Mech) - Dy. Executive Engineer (Mech)
GoI - Government of India
GoG - Government of Gujarat
AL - Acceptance of Letter / Letter of Intent
WO - Work Order
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-3: INSTRUCTIONS TO BIDDERS
On behalf of the Gujarat Maritime Board, the Executive Engineer (M), Gandhinagar,
Gujarat Maritime Board invites ON-LINE tenders from Experienced Contractors for
the work of "SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi
3.1 BID SUBMISSION
a. The bid should be uploaded (submitted) through the official web site
www.tender.nprocure.com only 27/01/2026 up to 18:10 hours.
b. The physical documents shall be submitted through RPAD/Speed Post only up
to 28/01/2026 to 04/02/2026 up to 18:10 hours. Beyond the last date
physical submission will not be accepted/ considered in any case and it will be
returned back to the bidder. The envelope must be super-scribed with name of
work “SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi
Port (3rd attempt)”. GMB is not responsible for the tender process if on the
cover name of tender work is not mentioned.
The Board does not assume any responsibility for the supporting tender
documents being torn/ damaged during the postal transit. It is the responsibility
of the Bidder to see that the supporting tender documents reach this office
before due date as fixed and notified in the tender notice for the purpose of
receipt of the tender.
3.2 EARNEST MONEY DEPOSIT:
a) The Bidder shall remit Rs.47,810/- only in form of FDR having validity of
months with the tender, failing which the tender will not be considered.
b) The earnest money shall be remitted by a FDR of scheduled/ nationalized bank,
in favour of the Executive Engineer (M) GMB Gandhinagar. Cheque/DD will not
be accepted towards the Earnest Money Deposit.
c) The Earnest Money deposited by the unsuccessful Bidders will be refunded after
the finalization of tender. E.M.D. shall not bear any interest.
d) The Earnest Money deposited by the successful Bidder will be refunded on
receipt of Security Deposit and Performance Security.
e) If any party backs out after GMB has accepted his bid, it will be considered
default and in such case, necessary action against bidder will be taken by GMB
such as 1. Forfeiting of EMD 2.Black listing the agency for three years etc.
3.3 SECURITY DEPOSIT AND PERFORMANCE SECURITY:
a) The successful Bidder has to furnish a Security Deposit (SD) of sum equivalent
to 5 % of contract value plus GST on it in form of FDR and 5 % of contract value
plus GST on it in form of FDR/Bank guarantee as a Performance Security with
the Gujarat Maritime Board within 15 days of issuing AL. (Total SD 10 % of
contract value + GST )
b) If the security deposit is not furnished within 15 days on issuing acceptance
letter or such extended period as may be permitted by the Executive Engineer
(M) in writing, the earnest money is liable to be forfeited and the contract
c) In the event of the Bidder, after the issue of the communication of acceptance of
the offer by the GMB, failing/refusing to execute the agreement as hereinafter
provided, the Bidders shall be deemed to have abandoned the contract and such
an act shall amount to be construed as the bidder's calculated and willful breach
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
of contract, the cost and consequence of which shall be to the sole account of
the Bidder and upon such an event, the Board shall have full right to claim
damages in addition to the forfeiture of Earnest Money Deposit.
d) The GMB may at their option forfeit the Security Deposit if the bidder fails to
affect the supply or perform or observe the conditions of contract. The Board
will also be at liberty to deduct any sum that may be due to the GMB from the
Performance Security or from any sums of money due or that may become due
under any other contract to the bidder. This is without prejudice to the rights of
the Board under the terms of the contract.
e) The said Security deposit shall not in any way be construed as a limitation of the
bidder's responsibility or liability pertaining to his obligations and/or guarantees
under the contract and shall be without prejudice and in addition to any other
remedies available to the Board in terms of the contract and/or the laws of the
f) The Security Deposit shall be released after on completion of Performance
Guarantee period from the date of work completion.
3.4 TIME SCHEDULE:
The time allowed for the completion of the work “SR to Dredger U B Pavankumar for
Intermediate IRS survey at Bedi Port (3rd attempt)” is considered as under: Total
Time limit -03 (Three) months from the date of commencement of work issued by
3.5 RIGHT OF THE BOARD TO ACCEPT OR REJECT THE TENDER:
The Board does not bind itself to accept the lowest tender and reserves the right to
reject any or all tenders received without assigning any reason, whatsoever.
Tenders in which any of the particulars and prescribed information is inadequate or
incomplete in any respect and/or the prescribed conditions are not fulfilled are liable
to be rejected.
The Gujarat Maritime Board reserves the right to accept or reject any tender or drop
the entire tendering process without assigning any reasons thereof.
3.6 PRE CUM TECHNICAL QUALIFICATION:
The bidder will be qualified based on the information submitted online in the
prescribed Form (I) to (VI) attached with this bid regarding their experience,
financial position, technical capabilities etc. and hence all bidders are requested to
fill the information correctly strictly in prescribed Performa only with full knowledge
and supporting documents otherwise they will be treated as NON responsive Bid for
The information for financial data and project costs by the bidder should be
submitted in Indian Rupees only.
The competent authority of the Gujarat Maritime Board shall evaluate the pre-
qualification documents.
3.7 MINIMUM QUALIFICATION CRITERIA AND EVALUATION PROCEDURE
1. PQ cum technical bid will be evaluated on the basis of following main criteria as
per details provided by the bidders in requisite Performa i.e. PQ-TQ Form (I) to
(VI) along with prescribed application form given in this bid, without which
tender/application will not be considered for evaluation and opening of price bid.
On the basis of amount of experience for similar works, annual turnover and
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
solvency certificate. Bidders who fulfill the minimum criteria will be qualified for
opening of price bid.
2. Main criteria of evaluation:
A. General Criteria
B. Financial Criteria
C. Experience Criteria.
A. General Criteria :-
Submission of Tender FEE
Submission of EMD
Submission of GST certificate
Submission of PAN Card
Submission of PQ Form V History of Litigation
B. Financial Criteria
Bank Solvency Certificate: Bank Solvency certificate of Rs.8.11/- Lakhs or
above issued from any Nationalized/Schedule bank or govt. approved bank for
tendering purpose, issued on or after 1st January
Annual Turnover: Annual turnover of any one of the last five years immediate
preceding years, i.e. from 2020-21 to 2024-25 will be considered for evaluation. It
should be minimum Rs.40.52/-Lakhs or above and certified by C.A.
C. Experience Criteria:
Bidder should have experience successfully carried out *similar work during last
five years w.e.f 01.04.2020 till last date of online bid submission.
At least one similar work costing not less than Rs.16.21/- Lakhs
Performance certificates of above Experience, from concern organization should be
submitted along with tender.
Details of work executed in last 5 years shall be considered, along with work
order copy, and its work completion certificate. (Form No – V)
*Similar work means :- Experience of successfully completion of constructions of any
marine vessel or dry docking repairs of the any Flotilla Vessel like tugs , dredgers,
barges or any other floating vessel having under IRS Class or any other IACS Marine
Classification society during last 05 years .
Non submission or wrong submission of any of the above documents leading to
rejection of bid.
3.8 BID OPENING
1. The On-line tender PQ cum Technical Bid will be opened at 12.00 hrs. on
2. The Price bid will be opened on- Line of those Bidders who are pre cum
technically qualified. The date and time of opening of the Price Bid will be
notified to the qualified Bidders in advance of opening.
3. During the process of Bid evaluation GMB may call the bidders for discussion
/clarification and also can ask for requisite support documents.
4. Tenders submitted by Bidders shall remain valid for acceptance for a period of
120 days from the date of opening of the price bid. The Bidder will not be allowed
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
during the declared period of validity to revoke or cancel his tender or to vary
any term thereof.
5. If any Bidder withdraws his tender before the date of validity as declared, the
earnest money deposited by the Bidder, shall be outright forfeited. There shall be
considered as breach of contract and action against bidder shall be taken
according to norms.
6. The work will be awarded to the lowest techno-commercial offer after approval
obtained from the competent authority.
7. Only the authorized representatives of the bidders will be allowed to be present
during bid openings.
3.9 ADDENDA/CORRIGENDA:
The Executive Engineer (Mech.), Gandhinagar shall have the right to revise or to
amend the contract documents prior to the date of receipt and opening of the tender
aforesaid such revision or amendments or extensions, if any, shall be communicated
through notice in the newspaper, as may be considered necessary.
Addenda/Corrigenda to the tender documents may also be published On-Line by the
Executive Engineer (M), GMB Gandhinagar prior to the date of opening of the
tenders, to clarify or reflect modifications in the contract terms and conditions.
3.10 COLLECTION OF DATA - BIDDER'S RESPONSIBILITY:
1. The Bidder shall visit the site and acquaint himself fully with the site and local
conditions and no claims whatsoever will be entertained on the plea of ignorance
of difficulties for installation and operation of the system. Before submitting the
tender, the Bidder shall be deemed to have clearly understood and satisfied
himself regarding the work and services, all conditions liable to be encountered
during the execution thereof and that prices, rates and/or compensation quoted
in the offer are adequate and all-inclusive with respect to all factors,
circumstances and conditions likely to be incidental, both direct and indirect, to
the work and services.
2. The prices and amount quoted by the Bidder shall include all costs, including
escalation of labor, material, equipment, transport and/or storage charges,
insurance, inspection fees, increase in cost due to government and other
charges, direct and indirect, till the work is completed in accordance with the
scope of the contract and contract period. GST will be paid extra as actual on
submission of documentary evidence for payment made to GST Department.
3.11 AMBIGUITY:
In case of there be any ambiguity or doubt as to the meaning of any of the tender
clauses/conditions or, if any further information is required, the matter should
immediately be referred to the Executive Engineer (M), Gujarat Maritime Board,
Gandhinagar in writing, whose interpretation shall be final and binding.
3.12 SIGNING THE CONTRACT:
The successful Bidder shall be required to execute an agreement on stamp paper of the
required value within 15 days from the date of issue of the notice of Letter of Intent/AL
with submission of security deposit as per clause no 3.3. In the event of failure on the
part of the successful Bidder to execute the agreement within the above stipulated
period, or the period agreed by the Board, the Earnest Money deposited by him will be
forfeited and apart from that the Board being in such circumstances entitled to treat
the successful Bidder as in breach of contract and proceed accordingly. The agreement
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
shall be done by Executive Engineer (M), GMB, PIU – Jamnagar.
3.13 JURISDICTION: The contract is subject to the jurisdiction of the local courts of
Jamnagar (Gujarat).
3.14 All the documents contained in the tender shall form a part of agreement including
instructions, conditions, special conditions, Technical specifications document etc.
and any correspondence related to this Contract.
3.15 Letter of Application shall be submitted in proper format. Incomplete offers shall be
3.16 The bidder shall satisfy himself with regard to the nature of work to be carried out,
its scope, the conditions of the contract, etc. included in the bid document.
3.17 The cost associated with the preparation and submission of bid shall be borne by
the bidder and GMB shall in no case be responsible or liable for such costs.
3.18 The language for submission of bid should be in English. The enclosed schedules
should be filled in completely and all questions should be answered. If any
particular query is not relevant, it should be stated as "NOT APPLICABLE ".
Financial Data, Projects Costs, value of work etc. should be given in Indian rupees
3.19 For any clarification the Executive Engineer (Mech.) Gujarat Maritime Board, Office
Complex, Jamnagar-361750 or Office of Executive Engineer (Mech.), Gujarat
Maritime Board, 5th floor, Sagar Bhavan, GMB Office Complex, Sector – 10 A, Opp.
Air Force Station, CHH-Road, Gandhinagar- 382010 (Gujarat) India, may be
contacted by prior appointment on working day. For site visit and information
regarding relevant data will be also available at the above address.
3.20 If a proprietary firm makes the application, it shall be signed by the proprietor
above his full name and the full name of his firm with its current address.
3.21 If the application is made by a firm in partnership, it shall be signed by all the
partners of the firm, above their full names and current addresses or by a partner
holding the power of attorney of the firm by signing of the application in which case
a certified copy of the power of attorney shall accompany the application A certified
copy of the partnership dead, current address of the firm and the full names, and
current of all the partners of the firm shall also accompany the application.
3.22 If limited company or a limited corporation makes the application, a duly
authorized person holding the power of attorney for signing the application in
which case a certified copy of the power of attorney shall accompany the application
shall sign it. Such limited company or Corporation will be required to furnish
satisfactory evidence of its existence before the contract is awarded.
3.23 Information furnished must be sufficient to show that the Bidder is a capable in all
respects to successfully complete the envisaged contract works strictly on the basis
of the Bidder, having already carried out satisfactorily works of similar size, nature
and complexity.
3.24 While submitting the schedules, duly filled in, the Bidder shall enclose the latest
copies of brochures and technical documentation giving more information about
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
the firm and all the members.
3.25 The Gujarat Maritime Board reserves the right to reject any or all bids without
assigning any reasons and the Gujarat Maritime Board decision shall be final and
3.26 Detail of company profile shall be furnished in PQ Form-III (General information) of
3.27 No costs incurred by bidder in making this offer like providing clarification or
attending discussions, conferences or site visits will be reimbursed by the Gujarat
Maritime Board.
3.28 Details of the litigation, if any, during last three years shall be furnished as per
performa attached.
3.29 The tenders shall remain open for a period of 120 days from the date of opening of
the price bid and that the Bidder is not allowed to withdraw or modify the offer of
his own during this period. If any, Bidder withdraws his tender before the said
period or makes modifications of his tender, which are not acceptable to the Board
the Board shall, without prejudice to any right or remedy, be at liberty to forfeit in
full the EMD absolutely.
3.30 The PQ cum Technical Bid should contain all other documents (except the price
bid) viz; specifications, general conditions etc. and Bidder’s letter regarding
deviations to the general terms & conditions, if any. It should be very clearly
understood that the PQ cum Technical Bid should be restricted to only "Technical
matters and the tender amount of other price should not be discussed in the PQ
cum Technical Bid. Conditions in "PQ cum Technical Bid" should be specific so as
to evaluate them correctly and to arrive at the correct financial effect.
3.31 The rates should be filled only in Price bid of tender documents nowhere else rates
are to be mentioned. The price bid should contain only rate and amount of the
work. Any condition in the price bid shall be liable for rejection of offer of that
3.32 The bidders will understand clearly that the rates quoted are for complete works
and include all costs due to labor, plants & equipment, transportation, supervision
of GMB officials including lodging & boarding, various other services like water,
power, taxes, duties, materials and all matters and things necessary for satisfactory
completion of the work and no claim for additional payment beyond the
offered/accepted rates will be entertained and the bidder will not be entitle
subsequently to make any claim on the ground of misrepresentations or on the
ground that he was supplied with wrong information given by any person ( whether
the person is the employee of GMB or not ). Any failure on the part of Bidder to
obtain all necessary and correct information for the purposes of filling his Bid and
prices / rates therein shall not relieve him from any risks or liabilities arising out of
consequence upon the submission of the Bid.
3.33 Should there be any discrepancy or any doubt or obscurity as to the meaning of
any of these Bid documents or as to anything to be done or not to be done or as to
those instructions to be observed by the bidder, they may point out in writing such
queries to the Executive Engineer (M), GMB, Gandhinagar by letter / fax, as soon
as possible but not later than 02 days before pre-bid conference. In such case the
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
decision given by the competent authority shall be final and binding to the
3.34 GMB may issue any corrigendum in regards to any deviation in clause or the
outcome of pre bid conference by uploading the documents on tender web-sites.
3.35 No contract will be awarded except to the qualified and responsible bidders capable
of performing the classes of work contemplate.
3.36 No Bid shall be deemed fit for consideration unless, it is completed in all respect.
3.37 Liquidated damages for delay: If the Contractor fails to complete the work under
contract by the stipulated date, he shall pay liquidated damages of Rs.0.1 %
(percentage) of the contract value per day from the date of delaying the said work
upto the date of completion and handling over to the Government. and shall be
subject to the maximum amount of ten percentage (10%) of the estimated amount
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-4: PQ FORMS / ANNEXURES
QUALIFICATION DATA SHEET TO BE FILLED UP BY THE BIDDER.
The qualification questionnaire contains the following forms:
P.Q. FORM-I : Letter of Application
P.Q. FORM -II : Document Fees & EMD Details
P.Q. FORM III : General Details
P.Q. FORM-IV : Turnover
P.Q. FORM–V : Details of experience
P.Q. FORM -VI : History of Litigation on Rs.100 non judicial stamp paper
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
LETTER OF APPLICATION
Executive Engineer (Mech.),
Gujarat Maritime Board, 5th floor, Sagar Bhavan,
GMB Office Complex, Sector – 10 A,
Opp. Air Force Station, Chh-Road,
Gandhinagar- 382010 (Gujarat) India
Having examined the Bid documents including scope of works and time frame of the aforesaid
work, I/we hereby submit all necessary information and relevant documents as desired.
The application is made by us on behalf of................................ ………………………….duly
authorized to submit the offer.
The necessary evidence admissible in law in respects of authority assigned to us on behalf of
the firms for applying and for completion of the contract document is attached herewith.
It is certified that the information furnished in this document is correct & authentic.
I/We confirm that we have not been barred & blacklisted by any Government organization OR
Major Port Trust OR Minor Port Board in India for any such works in last Five Years.
I/We shall make available to the GMB any additional information it may find necessary or
require for this tender purpose.
I/We promise that we will abide by all rules & regulation as laid down by G.M.B. time to time
for execution of any contract as may arise during this contract period
I/We have examined and have no reservation to these tender documents with any addendum
I/We undersigned accept that GMB reserves the rights to reject any or all tender for this work
without assigning any reason.
Place: Signature of the applicant
(Name in bracket)
Encl: As per NIT
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PQ Form No.II: Document Fees & EMD Details
Document Fees Detail
D.D./Banker’s cheque No.& date
Bank Name & Address
Bank Name & Address
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PQ Form No. III: General Information
All individual firms applying for pre-qualification must complete the information in these
1. Name of firm:
2. Head office address:
3. Local office address (if any):
4. Telephone: Contact:
5. Facsimile: E-Mail & Website:
6. Place of incorporation / Year of incorporation /
registration: registration:
9. Main lines of business:
10. Details of office set up with Key
staff name, designation, & other
11. Other information ( if any)
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PQ Form No. IV: Turn over
All individual firms applying for pre-qualification must complete the information in these
Particular Year Value
Note: Copy of Chartered Accountant certificate shall be attached online with the Tender.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PQ FORM –V: Experience of similar works
Bidders should provide information showing their experience for similar works as
mentioned in the table below:
Actual experience during last 05 years till due date of bid for the proposed work as per
relevant clause of PQ bid shall be taken in to consideration.
A. Experience in Contracts of works completed:
Sr. Name Owner Address Contact Value of Detail Order Successfully
No of / with person contract (copy Completion
work Client phone / name & Attached) Certificate of
Fax No. Mobile no. Client
Note: The above information should be filled in the table and supporting documents in
soft copies should be submitted inclusive of work order and work completion
certificate/ etc. in e-tender.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PQ FORM – VI: History of Litigation
History of Litigation
(On 100 Rupees Non judicial Stamp paper with duly
We here by undertakes and confirms that our agency M/s
listed nor banned for tender participation or execution of the works by any Govt./PSU
Authority in last three year.
Yours faithfully,
(Name of Authorized signatory)
Sign and Seal of contractor
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-5: TECHNICAL DETAILS OF VESSEL
Dredger U B Pavankumar
Name of Vessel U B Pavankumar
IV registry No/ registry No. BP-1169
Type of Vessel Deck mounted dumb Grab Dredger
Place of Built Magdalla
Name of Builder Vipul Shipyard, Magdalla , Surat
Trading Warranting Inland water limits in the state of
Present Classification IRS
Length 25.0 Mtr
Dead Weight 165 T
Spud Dia 550 mm
Spud Length 12 Mtr
Spud Weight 2.5 Ton
Spud Operating Winches 3 Electrical Driven
Details of Excavator-
Make Tata Engines
Model TATA Hitachi Ex-400
Machine No. 4001-0100
Bucket Capacity 1.7 Cu Mtr
Engine Make Cummins Engines
Engine Model NT-855-C-FFC
Details of DG Set
Engine Make Greaves Ltd, Pune
Engine Model TD 2V6
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Alternator Details
Mfg By Devgen Set Sabs & Services, Silvassa
Sr No GALFB207m
Fire Fighting Pump
Pump Type Self-Priming Single Stage BB type
Make Florte Eng Pvt Ltd, Mumbai
Engine Make KOEL
Engine Model S.P.E.-2/1
Rotation Anti-clockwise
Pump Size: 50 X
Life Buoys 8 No- 2 with SI light
Life Jacket 8 No
DCP 5kg extinguisher 3 No
Water Co2 type 10 KG 1 No
CO2 type Extinguisher 4.5 1 No
Fire Hose with Nozzle 1 No
Signature of Contractor Executive Engineer (M),
PIU, GMB, Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-6: Scope of work:-
Dredger U B Pavankumar is dumb barge, which is working at Bedi port, Jamnagar. The
unit/vessel is maintained under IRS class. Hence, to maintain the vessel in good operating
condition & to maintain the Class (Docking survey to be carried out) & for hassle free dredging
operation, general repairing is required to be carried out.
The contractor has to carry out the said work at Bedi Port-Jamnagar. Contractor is strongly
advised to visit the site and acquainted himself with the site condition its surrounding etc. in
view of performing the scope of tender.
Items of work includes renewal of steel hull, pumps service & repairs, pipe line renewals &
repairs, anodes renewals, sand blasting, painting of hull, superstructures, fenders work,
electrical parts repairs, DG repairs. work etc. including all of items given in the here items of
works in schedule B. All the items of work must have to execute as per detailed specification
given in this bid in works specification.
The contractor has to procure the required material as mention in “Schedule-B” of this tender
document and should be got approved from IRS/EIC. All the items of work must have to
execute as per detailed Specification given in concern chapter of this tender document. The
entire work should be carried out as per Marine standard practice, IRS requirements & upto
satisfaction of IRS/EIC.
The entire work will have to be carried out under inspection of classification society i.e. IRS.
The work shall be considered to be completed, only after obtaining the class certificate from
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
CHAPTER-7: STANDARD BIDDING DOCUMENT
NAME OF WORK: -SR to Dredger U B Pavankumar for
Intermediate IRS survey at Bedi Port (3rd
Amount Put To Tender: - Rs. 40, 51,310/
Office of Executive Engineer (Mech.),
Gujarat Maritime Board, 5th floor, Sagar
GMB Office Complex, Sector – 10 A, Opp.
Air Force Station, CHH-Road,
Gandhinagar- 382010 (Gujarat) India
GOVERNMENT OF GUJARAT
GUJARAT MARITIME BOARD
PORT & TRANSPORT
This is a generic SBD to be used for Civil works. Each user/concern
department needs to examine and put up their particular bidding
requirement like; qualification criteria, contract Data etc., marked at
[#] while finalizing their own bidding process.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
INVITATION FOR BID (IFB) AS PER NIT.
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer (Mech.), GMB, Gandhinagar invites bids for the construction
of works detailed in the table. The bidders may submit bids for any or all of the
following works.
Sr. Name of Estimated Bid EMD In Period of
No. work Tender Document RS completion
value of Fee. (FDR)
2. Prospective/Interested bidder may download the Bid Documents from website
www.gmbtender.nprocure.com free of cost till the Time and Date as mentioned on
3. However, Bidder who is submitting the Bid Online will have to pay the Bid Document
Fee/ Tender Fee through Demand Draft only of any Schedule Bank payable at Jamnagar
and in favor of "Gujarat Maritime Board NON PLD, Gandhinagar A/c" Once the Bid is
received online/Offline, Bid Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee against
Bid Security / EMD shall be submitted in electronic format through online (by
scanning)while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security/ EMD has been received. Accordingly, the offer of only
those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD
have been received electronically. However, for the purpose of realization of Demand
Draft, and FDR / Bank Guarantee bidder shall send the same in original through
R.P.A.D. so as to reach to ‘Executive Engineer (Mech.), GMB, Gandhinagar' within
Days from the last day of bid submission. Penaltative action for not submitting
Demand Draft / FDR / Bank Guarantee in original to Executive Engineer / Tender
Inviting Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in
the online NIT at website https:// www.tender.nprocure.com in the presence of
the bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified,
the bids will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on………………………………at………………………..hrs.at the
Office of Superintending Engineer(Mech.) 5th Floor GMB office complex Opp of Air Force
Sector 10 A Gandhinagar to clarify the issues and to answer questions on any matter
that ........................................................ may be raised at that stage as stated inclause
9.2 of ‘instructions to Bidders’ of the bidding documents.
6. #Bid Security (EMD) is equal to 1%(+18% GSt) of Estimated Amount put to bid /
tender and should be rounded off to the next thousand rupees.
7. Other Information is as under:
a. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No
written or online request in this regard shall be granted.
b. Offers in physical form will not be accepted in any case.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
c. Demand Draft purchased by the other then bidder and issued after the last date
of submission of Bids, will not be considered or accepted.
d. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
e. Conditional tender shall not be accepted.
f. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
g. Any change in format or conditional Bank Guarantee will not be accepted and
the bidder will be considered non-responsive.
h. All the bidders are instructed to fill in information strictly in accordance with the
format given in the checklist /qualification document / tender document.
i. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
j. Blank/insufficient information shall be treated as nil information and shall result
in disqualification.
k. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be aground/reason for not giving required
information for this work /bid.
l. Information supplied for earlier projects shall not be considered while evaluation
of this bid. The Government will not ask for any other information, unless it is
found absolutely necessary by the competent authority.
m. If found necessary, the contractor will be intimated for negotiation,
#For the works costing up to 7.5 crore (ROAD),
crore(BUILDING&BRIDGE) kindly refer to SSR-10-201517-C dated03-02-
# For the works costing under 7.5 crore for Road Works and 7.0 crore for
Building and Bridge Works following documents shall be submitted in
electronic format only through online by scanning and the (i) Bid
Document Fee / Tender Fee (ii) Bid Security / EMD should be sent in
original to the Tender opening authority through RPAD, so as to reach
the Executive Engineer within 7 days from last day of submission of
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
ELIGIBILITY CRITERIA
EILIGIBILITY CRITERIA AS PER NIT & TQ /PQ relevant tender clause
given here above clause & criteria.
All the eligibility criteria shall be requires to submit as mention in tender documents.
i. Upload Scan copy of Tender Fee of Rs.AS PER NIT /- in the form of Demand Draft only
(Cash not acceptable) in favour of The PO GMB Jamnagar payable at Jamnagar from
any Nationalized / Scheduled Bank. (DD for Tender Fee must be purchased from the
account of Bidder)
ii. Upload scan copy of Earnest Money Deposit Rs.AS PER NIT /- in the form of FDR (with
a validity period of not less than 6 months) from Nationalized/ Scheduled Bank in favor
of Executive Engineer(Mech.), PIU Gandhinagar, payable at Gandhinagar (FDR for EMD
must be purchased from the account of Bidder).
iii. Upload Scan copy of GST Registration Certificate
iv. Upload Scan copy of Permanent Account Number issued by Income Tax Department
v. Upload Scan copy of Bank Solvency of Rs AS PER MENTION PQ/TQ issued on or after
01.01.2025 by Scheduled/Nationalized Bank or Government approved bank for
tendering purpose.
vi. Turn over of minimum Rs. 40.52 Lakhs AS PER MENTION PQ/TQ in any one year, over
the last five financial years i.e. (2020-2021 to 2024-2025) issued by Charter account.
vii. AFFIDAVIT for abandoned any work of Government
viii. Upload the scan copy of 3A certificate issued for completions of Government work or if
agency submit experience of private work then copy of work order, completions certificate
mentioning amount of work done, date of start and actual date of completions of work.
Bidder should have experience successfully carried out *similar work during last five
years w.e.f 01.04.2020 till last date of online bid submission.
At least one similar work costing not less than Rs. AS PER MENTION PQ/TQ /-.
*Similar work means:- Experience of successfully completion of Constructions of any
marine vessel or dry docking repairs of the any Flotilla Vessel like Tugs , dredgers,
barges or any other floating vessel having under IRS Class or any other IACS Marine
Classification society.
ix. Submission of Dry Dock details as per relevant annexure
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Section1: Instructions to Bidders
Table of Clauses
D. Submission of Bids
1. Scope of Bid 19. Sealing &Marking of Bids
2. Source of Funds 20. Deadline for Submission of
3. Eligible Bidders 21. Late Bids
4. Qualification of the 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding E. Bid Opening and Evaluation
7. Site Visit 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 26. Examination of Bid sand
Documents Determination of
9. Clarification of Bidding 27. Correction of Errors
10. Amendment of Bidding 28. Deleted
29. Evaluation and Comparison
Of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising F. Award of Contract
13. Bid Prices 31. Award Criteria
14. Currencies of Bid and 32. Employer’s Right to Accept
Payment Any Bid and to Reject any or
15. Bid Validity 33. Notification of Award and
Signing of Agreement
16. Bid Security 34. Performance Security
17. Alternative Proposals By 35. Advance Payment and Security
18. Format and Signing of Bid 36. Deleted
37. Corrector Fraudulent Practices
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction
of works (as defined in these documents and referred to as ‘the works”)
detailed in the table given in IFB. The bidders may submit bids for any or
all of the works detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the
intended completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and
their derivatives (bidder/tenderer, bid/tender, bidding/tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of
Gujarat Gujarat Maritime Board/ Govt. of India for centrally sponsored
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification
Information, a statement that the Bidder is neither associated, nor has
been associated, directly or indirectly, with the consultant or any other
entity that has prepared the design, specifications, and other documents
for the Project or being proposed as Project Manager for the Contract. A
firm that has been engaged by the Employer to provide consulting services
for the preparation or supervision of the works, and any of its affiliates,
shall not be eligible to bid.
4. Qualification of the Bidder:-
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification
Information, a preliminary description n of the proposed work method and
schedule, including drawings and charts, as necessary. The proposed
methodology should include a program of construction backed with
equipment planning and deployment duly supported with broad
calculations and quality assurance procedures proposed to be adopted
justifying their capability of execution and completion of work as per
technical specifications, with in stipulated period of completion.
#4.5 QUALIFICATIONCRITERIA: (Please refer Chapeter-1: NIT and Chapter-3:
INSTRUCTIONS TO BIDDERS) (Applicable for the works which require Post
4.5.1 Qualification will be based on Applicant’s meeting all the following
minimum pass/ fail criteria regarding the Applicant’s general and
particular experience, personnel and equipment capabilities and financial
positions, as demonstrated by the applicant’s responses in the forms
attached to the letter of application ( specified requirement for joint
ventures are given under para 4.6 below ) Subcontractors experience and
resources shall not be taken in to account in determining the applicants
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
compliance with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate
having experience and resources sufficient to meet the aggregate of the
qualification criteria for each contract given in paragraphs 4.5.4, 4.5.5 and
4.5.9 below Chapter-3, Instructions to bidders, clause 3.7 and 3.8.
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed
and the financial figure to a common base value for works completed in
Year Financial Year Multiplying factor
Base year of inviting 2024-2025
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in
foreign currency the above enhanced multiplying factors will not be
applied. Instead, the current market exchange rate (State Bank of India BC
Selling rate as on the last date of submission of the bid) will be applied for
the purpose of conversion of the amount in foreign currency into India
4.5.3 General Experience. :-As per Bid PRE CUM TECHNICAL QUALIFICATION
(CHPATER 3, CLAUSE 3.6 and 3.7).
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum Annual financial turnover of Rs. in any one
year, over the last five years issued by Charter account
(b) Experience in successfully completing or substantially completing at
least one contract similar nature of work at least 40 percent of the
value of proposed contract within the last five years.
The works may have been executed by the applicant as prime
contractor or asa member of a joint venture or as a nominated sub-
contractor. As subcontractor, he should have acquired the experience
of execution of all major items of works under the proposed contract.
In case a project has been executed by a joint venture, weight towards
experience of the project would be given to each joint venture in
proportion to their financial participation in the joint venture.
Substantially completed works means those works which are at least
90 % completed as on the date of submission (i.e. gross value of work
done up to the last date of submission is 90 % or more of the original
contract price) and continuing satisfactorily.
For these, a certificate from the employers shall be submitted along
with the application incorporating clearly the name of the work,
contract value, billing amount, date of commencement of works,
satisfactory performance of the contractor and any other relevant
4.5.4 Personnel Capabilities. Availability for his work of personnel with adequate
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
experience as required; as per Appendix.
4.5.5 Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested
major equipment to attain the completion of works in accordance with the
prescribed construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish
with their bid, a detailed construction planning and methodology
supported with layout and necessary drawings and calculations to allow
the employer to review their proposals. The numbers, types and capacities
of each plant/equipment shall be shown in the proposals along with the
cycle time for each operation for the given production capacity to match
the requirements.
4.5.6 Financial Position
The Applicant should give undertaking that he has access to, or has
available, liquid assets (aggregate of working capital, cash in hand and
uncommitted bank guarantees) and / or credit facilities up to 25 percent of
the value of the contract / contracts applied.
4.5.7 The audited balance sheets for the last five years should be submitted,
which must demonstrate the soundness of the applicant’s financial
position, showing long – term profitability including an estimated financial
projection for the next two years If necessary, the employer will make
inquiries with the applicant’s bankers.
4.5.8 Litigation History
The Applicant should provide accurate information on any litigation or
arbitration resulting from contracts completed or under execution by him
over the last five years. A consistent history of awards against the
Applicant or any partner of a joint venture may result in failure of the
4.5.8 Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have: Made misleading or false representation in the
forms, statements submitted, and / or Record of poor performance such as
abandoning the work, rescinding of contract for which the reasons are
attributable to the non – performance of the contractor; consistent history
of litigation awarded against the applicant or financial failure due to
bankruptcy. The rescinding of contract of a joint venture on account of
reasons other than non – performance, such as Most Experienced partner of
joint venture pulling out, court directions leading to breaking up of a joint
venture before the start of work, which are not attributable to the poor
performance of the contractor will, however, not affect the qualification of
the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 Others) (Applicable
only for estimated project cost of 50 Crore and above)
4..6.1 Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given
Inpara & 4.5.6 above. The joint venture must collectively satisfy the
criteria of para4.5.3 & 4.5.6above.The experience of the other joint
venture partners shall be considered if it is not less than 30 percent of
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
the qualifying criteria in para4.5.3&4.5.6 above.
(ii) Individually each member must satisfy the requirements of para 4.5.7 &
(b) Bid shall be signed so as to legally bind all partners, jointly and severally,
and shall be submitted with a copy of the joint venture agreement
providing the joint and several liabilities with respect to the contract.
4.6.2 Qualification of a joint venture does not necessarily qualify any of its
partners individually or as a partner in any other joint venture. In case
dissolution of a joint venture, each one of the constituent firms may
qualify if they meet all the qualification requirements, subject to the
written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will bequalified
only if their available bid capacity at the expected time of bidding is more
than the total estimated cost of the works. The available bid capacity will
be calculated asunder:
Assessed Available Bid Capacity=(A*N*2-B),where
A = Maximum value of work executed in any one year during the last five
years(updated to the price level of the year indicated in appendix)
taking in to account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing
works to be completed during the next 2 (Two)Months(period of
completion of work for which bids are invited );and
N = Number of years prescribed for completion of the works for which the
bids areinvited.
Note :- In Case of joint venture, the available bid capacity will be
applied foreach partner to the extent of his proposed
participation in theexecution of the work.
4.8 Even though the bidders meet the above qualifying criteria, they are
subject to be disqualified if they have:
- Made misleading or false representation in the forms, statements
Attachmentsthesubmittedinproofthequalificationrequirements;an
- Record of poor performance such as abandoning the works, not
properly completing the contract, inordinate delay in completion,
litigation history, or financial failures etc.; and/or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational
justification to the employer.
5. One bid per bidder
5.1 Each bidder shall submit only one bid for one package. A bidder who
submits or participates in more than one bid (other than as a subcontractor
or in cases of alternatives that have been permitted or requested) will cause
all the proposals with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and
submission of his Bid, and the Employer will in no case be responsible and
liable for those costs.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
7.1 The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit
and examine the Site of work and its surrounding and obtain all information
that may be necessary for preparing the Bid and entering into a contract for
construction of the Works.
The costs of visiting the site shall be at the Bidder’s own expense.
B: BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and
addenda issued in accordance with Clause10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information ,and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2 Volumes I, II, III and IV are available online and documents to be
furnished by the bidder in compliance to section 2 will be prepared by him
and furnished as Volume- V in two parts (refer clause12).
8.3 The bidder is expected to examine carefully all instructions, conditions of
contract, contract data, forms, terms, and technical specifications, bill of
quantities, forms, Annexes and drawings in the Bid Document. Failure to
comply with the requirements of Bid Documents shall be at the bidder’s
own risk. Pursuant to clause 26 hereof, bids which are not substantially
responsive to the requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents
may notify the Employer in writing or through E-mail at the Employer’s
address indicated in the invitation to bid. The Employer will respond to
any request for clarification which he received earlier than 15 days prior to
the deadline for submission of bids. Employer’s response will be published
on website including a description of the enquiry but without identifying
9.2 Pre-bid meeting
9.2.1 The bidder or his official representative is invited to attend a pre-bid
meeting which will take place at the address, venue, time and date as
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
indicated in the appendix.
9.2.2 The purpose of the meeting will be to clarify issues and to answer
questions on any matter that may be raised at that stage.
9.2.3 The bidder shall be required to submit any questions in writing or e-mail
to reach the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without
identifying the source of enquiry) and the responses given will be
published without delay on the tender website i.e.
www.tender.nprocure.com. any modification of the bidding documents
listed in sub-Clause 8.1 which may become necessary as a result of the
pre-bid meeting shall be made by the Employer exclusively through the
issue of an Addendum pursuant to Clause 10 and not through the
minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for
disqualification of a bidder.
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the
bidding documents by issuing addenda.
10.2 Any addendum thus issued shall be part of the bidding documents. The
Employer will assume no responsibility for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum
into account in preparing their bids, the Employer may, at his discretion,
extend as necessary the deadline for submission of bids, in accordance
with Sub-Clause 20.2 below.
C: PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1 The bid be submitted by the bidder as Volume-V of the bid document (refer
Clause 8.1) shall be in two separate parts:
Part-I shall be named “Technical Bid” and shall comprise (As per Chapeter-1:
NIT and Chapter-3: INSTRUCTIONS TO BIDDERS)
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2 The Bidder shall submit the details/information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Invitation for Bids (IFB)
1 Instruction to Bidders Volume-I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume-I
9 Drawings Volume-IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1,
based on the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and online item total (both in
figures and words) for all items of the Works described in the Bill of
Quantities along with total bid price other in figures and words). Items for
which no rate or price is entered by the bidder will not be paid for by the
Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor
under the contract, or for any other cause shall be included in the rates,
prices and total Bid Price submitted by the Bidder. (GST will be paid
13.5 The rates and prices quoted by the bidder are subject to adjustment
during the performance of the Contract in accordance with the provisions
of Clause 47of the Condition of Contract (Irrespective of the time limit
and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the
dead line date for bid submission specified in Clause20.
15.2 In exceptional circumstances, prior to expiry of the original time limit, the
Employer may request that the bidders may extend the period of validity
for a specified period. A bidder may refuse the request without forfeiting
his bid security. A bidder agreeing to the request will not be required or
permitted to modify his bid, but will be required to extend the validity of
his security for a period of the extension, and in compliance with Clause-
16 in all respects.
#16. Bid Security: As per qualification criteria given tender (As per Chapeter-1: NIT
and Chapter-3: INSTRUCTIONS TO BIDDERS).
16.1 The Bidder shall furnish, as part of his Bid, a Bid security in the amount as
shown in column 4 of the table of IFB for this particular work. This Bid security
shall be in favor of Employer as named in Appendix and may be in one of the
following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format
given in Volume III. (Bank Guarantee is applicable only for Bid
Estimated Amount of 01 Crore and above) and Bank Guarantee
of Schedule and Private Banks shall be considered as per GoG
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Finance Department’s Circular No. FD/MSM/e-
file/4/2024/0057/D.M.O. Date 21/04/2024 or as per their latest
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a
foreign Bank approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1)
Road & Building Department or (2) Narmada Water Resources,
Water Supply and KalpsarDepartment of Govt of Gujarat.
Exemption Certificate is applicable only when Registration
Certificate of Appropriate Class and Category of Approved
Contractors is required as eligible criteria of bidder.
16.2 Bank guarantees (and other instruments having fixed validity) issued as
surety for the bid shall be valid for 45 days beyond the validity of the bid
i.e. total validity of 120+45 = 165Days
16.3 Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the
Employer as non-responsive.
16.4 The Bid Security of unsuccessful bidders will be returned within 28 days of
the end of the bid validity period specified in Sub-Clause15.1
16.5 The Bid Security of the successful bidder will be discharged when the
bidder has signed the Agreement and furnished the required Performance
16.6 The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period
of Bid validity.
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He
will be intimated maximum three times within the validity period for
negotiation, If contractor does not respond in time, his Bid Security
(EMD) will be forfeited and his tender will be rejected. Punitive
action will be taken on such contractors. (As per GoG R&B Dept’s
17. Alternative Proposals by Bidders.
17.1 Bidders shall submit offers that fully comply with the requirements of the
bidding documents, including the conditions of contract (including
mobilization advance or time for completion), basic technical design as
indicated in the drawing and specifications. Conditional offers or alternative
offers will not be considered further in the process of tender evaluation.
18. Format and Signing of Bid
The Bidder shall prepare documents comprising the bid as described in
Clause-12 of these Instructions to bidder as the “Technical Bid“ and
“Financial Bid” in separate parts to be uploaded.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
D: SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1 Complete Bids must be received online by the Employer at the tender
website specified above not later than the date indicated in appendix.
20.2 The Employer may extend the deadline for submission of bids by issuing
an amendment in accordance with Clause-10, in which case all right and
obligation of the Employer and the bidders previously subject to the
original dead line will then be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1 Bidders may modify or withdraw their bids online before the deadline
prescribed in Clause 20 or pursuant to Clause
23.3 No bid shall be modified or withdrawn after the deadline for submission of Bid.
23.4 Withdrawal or modification of a bid between the deadline for submission
of bids and the expiration of the original period of bid validity specified in
Clause 15.1 above or as extended pursuant to Clause-15.2 may result in
the forfeiture of the Bid security pursuant to Clause16.
E: BID OPENING AND EVALUATION
23.1 The Employer will open all the Bids received including modifications made
pursuant to Clause 22, in the presence of the Bidders or their representatives
who choose to attend at time, date and the place specified in Appendix in the
manner specified in Clauses 20 and 23.3, In the event of the specified date of
Bid opening being declared holiday for the Employer, the Bids will be opened at
the appointed time and location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished
does not conform to the amount and validity period as specified in the invitation
for bid (ref. Column 4 and paragraph 3), and has not been furnished in the form
specified in Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished
in part-I of the bid pursuant to Clause-12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the
clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification
the Evaluation Committee will finalize the list of responsive bidders
whose financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
responsive in accordance with Clause 23.4(iv) will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid
prices, the total amount of each bid, any discount and such other details as the
prices, the total amount of each bid, any discount and such other details as the
Employer may consider appropriate, will be announced by the Employer at the
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid
prices, the total amount of each bid, any discount, and such other details as
prices, the total amount of each bid, any discount, and such other details as
the Employer may consider appropriate, will be announced by the Employer at
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of estimated amount of Bids from highest to
23.9 The Employer shall prepare minutes of the Bid opening, including the
information disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and
comparison of Bids and recommendations for the award of a contract shall not
be disclosed to Bidders or any other persons not officially concerned with such
process until the award to the successful Bidder has been announced. Any
effort by Bidder to influence the Employer’s processing of Bids or award
decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer
may, at his discretion, ask any Bidder for clarification of his Bid, including
breakdowns of unit rates. The request for clarification and the response shall be
in writing or by e- mail, but no change in the price or substances of the Bid
shall be sought, offered, or permitted except as required to confirm the
correction of arithmetic errors discovered by the Employer in the evaluation of
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to
bring additional information to the notice of the Employer, it should do so in
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid
evaluation, bid comparison or contract award decision may result in the
rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine
whether each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b)
has been properly signed; (c) is accompanied by the required securities and; (d)
is substantially responsive to the requirements of the Bidding document. During
the detailed evaluation of the “Financial Bid”, the responsiveness of the bids will
be further determined with respect to the remaining bid conditions, i.e., priced
bill of quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
or reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits
in any substantial way, inconsistent with the Bidding documents, the
Employer’s rights or the Bidder’s obligations under the Contract; or(c) whose
rectification would affect unfairly the competitive position of other Bidders
presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the
requirements of the Bidding documents or otherwise result in unsolicited
benefits for the Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will
not be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the
price analyses, the Employer may require that the amount of the performance
security set forth in Clause 34 be increased at the expense of the successful
/bidder to a level sufficient to protect the Employer against financial loss in the
event of default of the successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are
unrealistically priced low and which cannot be substantiated satisfactorily by
the bidder may be rejected as non-responsive.
F: AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose
Bid has been determined. (Bidder who qualified in Pre-qualification criteria and
qualified bidders whose price bid stage opened and bidder who quoted lowest
price in Bill of Quantity will be eligible for award of contract)
(i) to be substantially responsive to the Bidding documents and who has
offered the lowest evaluated Bid Price; and
(ii) To be within the available bid capacity adjusted to account for his bid
price which is the lowest evaluation in any of the packages opened earlier
than the one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
evaluated bid. The contract will in such cases be awarded to the next lowest
bidder at his evaluation bid price.
32. Employer’s Right to accept any Bid and to reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject
any Bid, and to cancel the Bidding process and reject all Bids, at any time prior
to the award of contract, without thereby incurring any liability to the affected
bidder or Bidder or any obligation to inform the affected Bidder or Bidders of the
grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer
will pay the Contractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract
(hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject
only to the furnishing of a performance security in accordance with the
provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful
Bidder, within 28 days following the notification of award along with the Letter
of Acceptance. Within 21 days of receipt, the successful Bidder will sign the
Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security:- A
(As per details given in chapter-3, Bid Instruction to Bidder 3.3)
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee
from a Bank in the form set forth in Section 8 (the “Performance Security”)
for an amount equal to 5% (five percent) of its Contract Price. In case ofbids
mentionedbelow,thesuccessfulBidder,alongwiththePerformanceSecurity,shal
l also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10%
but up to 20% of the Estimated Project Cost, then the Additional
Performance Security shall be calculated @ 20% of the difference in
the (i) Estimated Project Cost (as mentioned in Bid Document) -
Minus 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20%
of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 30% of the difference in the (i)
Estimated Project Cost (as mentioned in Bid Document) - Minus 10%
of the Estimated Project Cost and (ii) Contract Price offered by the
selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
(B) The Performance Security shall be valid beyond 60 (sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid
beyond 28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of
a Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India
and acceptable to the Employer. As per GoG Finance Department’s Circular
No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their
latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
34.1 shall constitute sufficient grounds for cancellation of the award and
forfeiture of the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as
stipulated in the Conditions of Contract, subject to maximum amount, as
stated in the Contract Data.
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in
completing for the contract in question and will declare the firm ineligible,
either indefinitely or for a stated period of time, to be awarded a contract with
National Highways Authority of India/ State PWD and any other agencies, if it
at any time determines that the firm has engaged in corrupt or fraudulent
practices in completing for the contractor, orin execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause
59.2 of the Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is Executive Engineer (M), [Cl.1.1]
Gujarat Maritime Board, Jamnagar
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3(a)]
4. Value of Work is Rs. /- AS per NIT
6. The cost of electric work is Rs.
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities is Rs. [Cl.4.5.6]
9. Price level of the financial year…………… [Cl.4.5.2]
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
10. Thepre-bidmeetingwilltakeplaceat…………. [Cl.9.2.1]
11. The technical Bid will be opened at the office of the
Executive Engineer (M), Gujarat Maritime Board,
Jamnagar on dt........................... at
12. Address of the Employer: Executive Engineer (M), PIU, 1st
Floor Gujarat Maritime Board office , Near Chopati Grounf
14. The bid should be submitted latest by As stated on [Cl.20.1&20.2]
15. The bid will be opened at Executive Engineer (M), PIU, 1st [Cl.23.1]
Floor Gujarat Maritime Board office , Near Chopati Grounf
Jamnagar Port. As stated on online NIT
16. The Bank Draft in favor of PO GMB Jamnagar
18. Escalation factors (for the cost of works executed and [Cl.4.5.2]
financial figure to a common base
value) for works completed
Year FinancialYear Multiplyingfactor
Baseyearofinvitingtender 20242025
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[ReferenceCL.4.5.5]
The contractors shall also give a list of machineries in his possession and
which they propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machiner Value
List of Key Personnel to be deployed on Contract Work (Reference Cl.
#Employment of a qualified site Engineer by the Contractor.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
The Contractor shall employ full-time technically qualified staff during the
execution of this work as under: -
1. Two graduate Civil Engineer sand three diploma Civil Engineers when cost of
the work to be executed is more than Rs.50lakhs.
2. One graduate &two Diploma, Civil Engineers when the cost of the work to be
executed is more than Rs.15 lakhs but less than Rs.50lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than
Rs.15 lakhs but more than Rs.5lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to
be executed is less than Rs. 5 lakhs. The Engineer so employed for the
Government work must have sufficient experience to handle the work
independently. Such an Engineer shall have to stay at the site of work and
he shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate
Engineer, Employment of a separate Engineer will not be necessary provided
that the Engineer partner himself attends the execution of the work on the
Within 15 days of issue of work-order the Contractor will have to furnish to
the Deputy Executive Engineer-in-charge of the work the Name,
Qualifications, copy of marksheet, Colour Photograph and the appointment
order issued such engineers engaged for this contract work. If 15 days after
issue of work order such designated Site Engineers do not resume or do not
remain present onsite of work, the recovery at the rate of Rs. per month
per Engineer will be made from the bills/deposit/dues of the contractor.
Such recovery shall be non-refundable.
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-2: QUALIFICATION INFORMATION
(As per Chapeter-1: NIT and Chapter-3: INSTRUCTIONS TO
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of
Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2023-2024
Work performed in the last five years 2022-2023
(inRs. Lakhs) 2021-2022
1.1.1 Work performed as prime contractor, work performed in the past as a nominated
sub-contractorwillalsobeconsideredthesub-contractinvolvedexecutionofallmain
items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar
nature over the last five years** and in current year before the submission of the
Proje Name Descripti Contra Value of Dat Stipulat Actual Remark
ct of the on of ct contract eof ed date of explainin
Nam Employ work No. (Rs. wor period of completio g reasons
e er Crore) k completi n* for delay
*Attachcertificate(s) from the Engineer(s)in-charge
**Immediately preceding thefinancial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract involved
execution of all main items of work described in the bid document, provided, further that
all other qualification criteria are called (in the same name and style) in the last five
years** and in current year before the submission of the bid.
Year Nam Name of Quantity of work performed (Cum/MT) Remarks*
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
e the Cement Masonry Earth Bitumino (indicate
ofthe Employe Concrete Work us Work contractRe
work r (Including s f)
1.4 Information on Bid Capacity (works for which bids have been submitted and
works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contra Name Value Stipulate Value of Anticipate
of works & ct &Addres Contra d Period of Works* d of
State No. s of ct (Rs. Completio remainin completion
Employe Cr) n g to be
*Attachcertificate(s) from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works
(Ref.Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement AvailabilityProposals Remarks
Equipmen NO Capacity Owned/ Nos/. Age/ (from
t Leasedtobe Capacit Condition whom to
procured y s be
1.6 Qualifications and experience of key personnel required for administration and execution
of the contract.Attach biographical data. Refer also to Sub Clause 9.1 of the Conditions of
Position Name Qualification Year of Year of
Experienc experiencein
e (General) the proposed
Project Manager
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Proposed sub-contract and firms involved
Sectionsofthe ValueofSub- Sub-Contractor Experiencein
works Contractor (Name& similarwork
Attachcopiesofcertificatesonpossessionofvalidlicenseforexecutingwater supply/
sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss
statements, auditors’ reports (in case of companies/corporations), etc. List them
below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers
who may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Employer Cause Amount Remarks
Party of Involved showing
(ies) Dispute Present Status
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the
instruction to Bidders. (Name of Consultant engaged for project
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Proposed work method and schedule. The Bidder should attach
descriptions, drawings and charts as necessary to comply with the
requirements of the Bidding documents. (Refer ITB Clause4.1)
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-3: CONDITIONS OF CONTRACT
Conditions of Contract: Table of Contents
A General D. Cost Control
1 Definitions 37 Bill of Quantities
2 Interpretation 38 Changes in the Quantities
3 Language and Law 39 Variations
4 Engineer’s Decisions 40 Payments for Variations
5 Delegations 41 Cash Flow Forecasts
6 Communications 42 Payment Certificates
7 Sub-Contractors 43 Payments
8 Other Contractors 44 Compensations Events
9 Personnel 45 Tax
10 Employer’s & Contractor Risk 46 Currencies
11 Employers Risks 47 Price Adjustment
12 Contractor’s Risk 48 Retention
13 Insurance 49 Liquidated damages
14 Site Investigations Reports 50 Bonus
15 Queries about the Contract 51 Advance Payment
16 Contractors to Construct the 52 Securities
17 The Works to be Completed By 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 54 Cost of Repair
20 Discoveries E. Finishing the Contract
21 Possession of the Site 55 Completion
22 Access to the Site 56 Taking Over
23 Instructions 57 Final Account
24 Disputes 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 59 Terminations
60 Payment up on Terminations
B. Time Control 61 Property
27 Programme 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted F. Special Conditions of
30 Delays Ordered by The 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Terms which are defined in the Contract Data are not also defined in the
Conditions of Contract but keep their defined meaning.
Bill of Quantities i.e. Schedule-B means the priced and completed Bill of
Quantities forming part of the Bid
Compensation Events are those defined in Clause44 here under
The Completion Date is the date of completion of the Works as certified
by the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of
Defects Liability Period. It consists of the documents listed in Clause
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body who's Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by
the Contractor to the Employer and includes Technical and Financial
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data
and calculated from the Completion Date.
The Employer (GUJARAT MARITIME BOARD) is the party who will
employ the Contractor to carry out the Works.
The Engineer (EIC – ENGINEER IN CHAGRE) is the person named in the
Contract Data (or any other competent person appointed and notified to
the contractor to act in replacement of the Engineer) who is responsible
for supervising the Contractor, administering the Contract, certifying
payments due to the Contractor, issuing and valuing Variations to the
Contract, awarding extensions of time, and valuing the Compensations
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified
in the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and
subsurface conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shall commence execution of the works. It does not necessarily coincide with
any of the Site Possession Dates.
A Sub contractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work
Temporary Works are works designed, constructed, installed, and removed by
the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
And turn over to the Employer, as defined in the Contract Data.
2. Interpretation
In interpreting these Conditions of Contract, singular also means plural,
male also means female or neuter and the other way around. Heading have
no significance. Words have their normal meaning under the language of
the Contract unless specifically defined. The Engineer will provide
instructions clarifying queries about Conditions of Contract.
If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references
to the Completion Date and Intended Completion date for the whole works)
The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid.
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated
in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
Communications between parties which are referred to in the conditions
are effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
The Contract or May subcontract any portion of work, up to a limits
pacified in contract data, with the approval of the engineer but may not
assign the Contract without the approval of the Employer in writing. Sub-
contracting shall not alter the Contractor’s obligations. Sub-contracting of
supply or specific items of work is not allowed.
The sub-contractor must be registered in appropriate class and category for
the part of work to be sub contracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other
contractors, public authorities, utilities and the Employer between the
dates given in the Schedule of other Contractor. The Contractors shall as
refer to in the Contract Data, also provide facilities and services for them as
described in the Schedule. The employer may modify the schedule of other
contractors and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of
Key Personnel as referred to in the Contract Data to carry out the functions
stated in the Schedule or other personnel approved by the Engineer. The
Engineer will approve any proposed replacement of key personnel only if
their qualifications, abilities, and relevant experience are substantially
equal to or better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor
shall ensure that the person leaves the Site within seven days and has no
further connection with the work in the Contract.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as
they directly affect the execution of the Works, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or
military or usurped power, civil war, riot commotion or disorder (unless
restricted to the Contractor’s employees), and contamination from any
nuclear fuel or nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury
and death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment's
(c) Loss of or damages of property(expect the works, Plant, Materials and
Equipment) in connection with the Contract ;and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor
to the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor
should have provided and recover the premiums the Employer has paid
from payments otherwise due to the Contractor or, if no payment is due,
the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
The engineer will clarify queries on the Contract Data
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with
the specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date
and shall carry out the Works in accordance with the programme
submitted by the Contractor, as updated with the approval of the Engineer,
and complete them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the
temporary or permanent work are subject to prior approval by the Engineer
before their use.
19.1 The Contractor shall be responsible for the safety & welfare of worker all
activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value
unexpectedly discovered on the site is the property of the Employer. The
contractor is to notify the engineer of such discoveries and carry out the
Engineer’s instructions for dealing with them.
21. Possession of the Site:-
21.1 The Employer shall give possession of all parts of the site to the Contractor.
If possession of a part is not given by the date stated in the Contract Data
the Employer is deemed to have delayed the start of the relevant activities
and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site
is not handed over to the Contractor, then contractor/ Employer may fore-
close the contract. Contractor/Employer has to foreclose the work within
30 days after lapse of 25%-time limit and after 30 days foreclosure option
will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any
place where materials or plants are being manufactured/ fabricated/
assembled for the works.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required by
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer (Higher Authority)within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any party
can refer the matter for conciliationwithin15 days from the decision given
by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Superintending Engineer, both the parties have to refer to
the Chief Engineer concern for the conciliate on process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer ,both the parties have to
refer to the #Secretary, Roads &Building Department, Government of
Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal.
If the Contractor fails to refer a claim / dispute to the Higher Authority
within 14 days of the notification of the Engineer's decision, the Contractor
shall not be entitled to any additional payment/claim if he doesn’t follow
the above sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure
stated in the Special Conditions of Contract.
B: TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to
the Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along
with monthly cash flow forecast.
27.2 An update of the Programme shall be a Programme showing the actual
progress achieved on each activity and the effect of the progress achieved
on the timing of the remaining work including any changes to the sequence
of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
Programme at intervals no longer than the period stated in the Contract
data. If the Contractor does not submit an updated Programme within this
period, the Engineer may withhold the amount stated in the Contract data
from the next payment after the date on which the overdue Programme has
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
been submitted.
27.4 The Engineer’s approval of the Programme shall not alter the Contractor’s
obligations. The Contractor may revise the Programme and submit it to the
Engineer again at any time. A revised Programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the
Intended Completion Date within 35 days of the Contractor asking the
Engineer for a decision upon the effect of a compensation event or
Variation and submitting full supporting information. If the Contractor has
failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing
the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21days communicate to
the engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the
extension and the contractor may refer the matter under Clause24.1
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or Progress of
any activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of
specific likely future events or circumstances that may adversely affect the
quality of the work, increase the Contract price or delay the execution of
works. The Engineer may require the contractor to provide an estimate of
the expected effect of the future event or circumstance on the contract price
and completion date. The estimate is to be provided by the Contractor as
soon as reason by possible.
32.2 The Contractor shall cooperate with the Engineer in making and
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
considering proposals for how the effect of such an event or circumstance
can be avoided or reduced by anyone involved in the work and in carrying
out any resulting instruction of the Engineer.
C: QUALITY CONTROL
#33. Identifying Defects/ Defect liability period
33.1 Defect liability period: The contractor shall be responsible to make good
and remedy at his own expense any defect which may develop or may be
noticed before the period mentioned hereunder from the certified date of
completion. The Engineer in charge shall give the contractor a notice in
writing about the defects and the contractor shall make good the same
within 15 days of receipt of the notice. In the case of failure on the part of
the contractor, the Engineer- in-charge may rectify or remove or re-execute
the work at the risk & cost of the contractor. The Engineer-in-charge shall
be entitled to appropriate the whole or any part of the amount of security
deposit towards the expenses, if any, Incurred by him in rectification,
removal or re-execution. The Defects Liability period shall be asunder….
(a) For all works costing up to Rs.50,000 (amount put to tender), the period
shall be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount
put tender), the period shall be 12 (Twelve) months from the certified date
of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be4 years or
elapse of 4 monsoon period following date of possession of building taken
over by user agency following the certified date of completion, whichever is
For the purpose of deciding the monsoon period, the 30th September shall
be treated as the last date.
Modified vide R &B D Circular No.PAC-11-102008-2076-N dated
31/8/2009, PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No. TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from
the certified date of completion. During this period the contractor shall visit
the site every six months along with the concerned Section Officer / Deputy
Executive Engineer and will examine the work already carried out in this
contract like road work, jungle cutting, side shoulders, side gutter, road
furniture, patta etc. and will prepare Km. wise inspection report duly
signed by all concerned and any defect observed shall be done within
days by the contractor at his risk and cost as per the direction of Engineer
in charge. The contractor needs to do videography of these visits and
require to submit at the time of release of FMG. If B.T. the surface during
the maintenance period of 4 years is worn out then agency shall have to
provide renewal coating as per tender item as directed by the Engineer-in-
charge. The amount equivalent to 5% of each running bill shall be withheld
and will be released after the free maintenance guarantee period (i.e.
years) is over.
However, this amount shall be released against fixed deposit or bank
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under
no circumstances shall exceed the allowable limit set forth in the relevant
clause for the material inquestion.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard
stones, sign boards etc. are completed in all respect by the contractor. After
completion of the miscellaneous items, the above said 2% withheld amount
shall bereleased.
(Govt. of Gujarat's G.R.No.:TNC-10-2013-3(Part-3)/C,Dtd.13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as
per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work
costing more than Rs. 5.00Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000/- shall be withheld.
The qualified quality Engineer shall be deployed exclusively for this
contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount
equivalent to Rs.20,000 per month shall be recovered till the actual
deployment of quality engineer. The amount so recovered towards the
deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill ispaid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own
risk and cost, the existing lane(s) of the road so that the traffic worthiness
and safety thereof are at no time materially inferior as compared to their
condition 10 (ten) days prior to the date of the Agreement, and shall
undertake the necessary repair and maintenance works for this purpose;
provided that theContractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient
progress of works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible for
ensuring safe operation of the road.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
33.3 The Engineer shall check the Contractor’s work and notify the Contractor
of any defects that are found. Such checking shall not affect the
Contractor’s responsibilities the Engineer may instruct the Contractor to
search for a Defect and to uncover and test any work that the Engineer
considers may have a Defect.
34.1 If the engineer instructs the Contractor to carry out a test not specified in
the Specification to check whether any work has a Defect and the test
shows that it does, the Contractor shall pay for the test and any samples. If
there is no defect the test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of
actual charges.
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the
engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the
end of the defects Liability Period, which begins at Completion and is
defined in the contract data. The Defects Liability Period shall be extended
for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
Defect with in the length of time specified by the Engineer’s notice.
36. Uncorrected Defects:-
If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D: COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The
Contractor is paid for the quantity of the work done at the rate in the Bill of
Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications, drawings, designs and instructions that may appear
to him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed
by the Engineer and such alteration shall not invalidate the contract and
any additional work which the contractor may be directed to do in the
manner above specified as part of the work shall be carried out by the
contractor on the same conditions in all respects on which he agreed to do
the main work and at the same rate as are specified in the tender for the
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmed produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no
rate is specified in this contract, then such class of work shall be carried
(i) At the rate derived from the item within the contract which is
comparable to the one involving additional or altered class of work;
where there are more than one comparable items, the item of the
contract which is nearest in comparison with regard to class or classes
of the work involved shall be selected and the decision of the
Superintending Engineer as to the nearest comparable item shall be
final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of
works shall be carried out at the rate entered in the Schedule of Rates
of the division for the year in which the tender was received, increased
or decreased by the percentage by which the tender amount is more or
less as compared to the amount arrived at the rates in the “Schedule of
Rates” of the Division in the year in which the tender was received. If
the Schedule of rates of the Division does not contain all the items, the
percentage increase or decrease of the tender shall be calculated
considering such items which were included in the “Scheduled Rates”
of the division for the year and for materials consumed on such item
the rate to be charged would be the basic rate taken into account for
fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such
class of work shall be carried out at the rate decided by the competent
authorities on the basis of detailed rate analysis after hearing the
contractor before a Committee of two Superintending Engineers
stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the
“Schedule of Rates” of the Division is ordered to be carried out before the
rate is agreed upon, then the contractor shall within seven days of the date
of receipt by him of the order to carry out the work, inform the Engineer-in-
charge of the rate, which it is his intention to charge for such class of work
and if the Engineer in charge does not agree to this rates, he shall by notice
in writing be at liberty to cancel his order to carry out such class of work
and arrange to carry it out in such manner as he may consider it advisable,
provided always that if the contractor shall commence work or incur any
expenditure in regard thereof before the rates shall have been determined
as lastly herein before mentioned, then in such cases he shall only be
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
entitled to be paid in respect of the work carried out or expenditure
incurred by him prior to the date of the determination of the rate as
aforesaid according to such rate or rates as shall be fixed by the Engineer-
in-charge. In the event of the dispute, the decision of the Superintending
Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted
by the competent authority, the alternation above referred to shall be
within the scope of such designs, drawings and specifications appended to
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to
the cost of the original work and the certificate of the Engineer-in-charge as
to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified
42.2 The Engineer shall check the Contractor’s monthly statement within
days and certify the amount to be paid to the Contractor after taking in to
account any credit or debit for the month in question in respect of
materials for the works in the relevant amounts and under conditions set
forth in sub-clause 32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in
the light of later information.
43.1 Payments shall be adjusted for deductions for advance payments,
retention, other recoveries in terms of the contract and taxes at source, as
applicable under the law. The Employer shall pay the Contractor the
amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the
contract to the Contractor will be made by the Employer. Hence, it is the
responsibility of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will
approve EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes
prevailing on due date of bid submission except GST. However, any
subsequent changes in the tax structure by Government after due date of
bid submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation
may arise due to change in tax structure, same will be recovered from the
GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price
of labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date
or extensions granted by the Engineer and shall not apply to the work
carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month. It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed
to include amounts to cover the contingency of such other rise or fall in
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has
passed and the Engineer has certified that all Defects notified by the
Engineer to the Contractor before the end of this period have been
48.3 On completion of the whole works, the contractor may substitute retention Money
with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer
shall consider the said request of the Contractor provided that the refund
here under shall be made in tranches of not less than 1% (One Percent) of
the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the
format of Bank Guarantee for Performance Guarantee enclosed with SBD
and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an
option to submit a fresh irrevocable and unconditional Bank Guarantee for
an amount equal to 5% of the total value of work executed substantially in
the format of Bank Guarantee for Performance Guarantee enclosed with
SBD and valid up to 60 days beyond the Defect Liability Period and yet
refund the Retention Money Bank Guarantee submitted for refund of
Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate
per day stated in the Contract Data for each day that the Completion Date
is later than the Intended Completion Date (for the whole works or the
milestone as stated in the contract data). The total amount of liquidated
milestone as stated in the contract data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The
Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the Contractor’s
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated
damages by the Contractor by adjusting the next payment certificate. The
Contractor shall not be entitled for any interest on the over payment
calculated from the date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated
in the tender, then the contractor shall pay to the employer the relevant
sum stated in the Contract Data as Liquidated damages for such default
and not as penalty for everyday or part of day which shall elapse between
relevant time for completion and the date stated in the taking over
certificate of the whole of the works on the relevant section, subject to the
limit stated in the contract data.
The employer may, without prejudice to any other method of
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
recovery deduct the amount of such damages from any monies due or to
become due to the contractor. The payment or deduction of such damages
shall not relieve the contractor from his obligation to complete the works on
from any other of his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the
Works or of a Section, the liquidated damages for delay in completion of the
remainder of the Works or of that Section shall, for any period of delay after
the date stated in such Taking-Over-Certificate, and in the absence of
alternative provisions in the Contract, be reduced in the proportion which
the value of the part so certified bears to the value of the whole of the
Works or Section, as applicable. The provisions of this Sub-clause shall
only apply to the rate of liquidated damages and shall not affect the limit
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall
pay to the contractor a sum stated in Contract Data as bonus for every
completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all
items of works as stipulated in the contract, including variations ordered
by the Engineer and the time prescribed in Clause17.
Bonus shall be paid only to works amounting to above INR 5 crore with
time limit of the works is equal or more than 6 months. The bonus would
be paid asunder
% of Time % of Initial Contract Price
Saved entitled for Bonus
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the
Contract Date by the date stated in the Contract Date, against provision by
the Contactor of an Unconditional Bank Guarantee in a form and by a
bank acceptable to the Employer in amounts and currencies equal to be at
least 110% of the advance payment. The guarantee shall remain effective
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
until the advance payment has been repaid, but the amount of the
guarantee shall be progressively reduced by the amounts repaid by the
Contractor. The Mobilization advance would be deemed as interest bearing
advance at an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall
be taken of the advance payment or its repayment in assessing valuations
of work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced
bids) shall be provided to the Employer no later than the date specified in
the Letter of Acceptance and shall be issued in an amount and form and by
a bank or surety acceptable to the Employer, and denominated in Indian
Rupees. The performance Security shall be valid until a date 60 days from
the date of expiry of Defects Liability Period and the additional security for
unbalanced bids shall be valid until a date 28 days from the date of issue
of the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E: FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of
Completion of the works and the Engineer will do so upon deciding that the
work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of
the Engineer issuing a certificate of Completion.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final
total amount that the Contractor considers payable as full and final
settlement of all claims under the Contract for items before the end of the
Defects Liability Period. The Engineer shall issue a Defect Liability
Certificate and certify any final payment that is due to the Contractor
within 56 days of receiving the Contractor's account if it is correct and
complete. If it is not, the Engineer shall issue within 56 days a schedule
that states the scope of the corrections or additions that are necessary. If
the Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of
excesses and savings in final account is observed, the Engineer/Employer
shall be at liberty to restrict the final payment of BOQ items to the lowest
amount evaluated of the bids considering the final quantities and the rates
quoted including the rebates if any. Payment of variation items shall
however be made at the rates approved by the Employer, within 90 days
from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the
58.2 If the Contractor does not supply the Drawings and/or manuals by the
dates stated in the Contract data, or they do not receive the Engineer’s
approval, the Engineer shall withhold the amount stated in the Contract
Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is shown
on the current Programme and the stoppage has not been authorized by
2. The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it within
a reasonable period of time determined by the Engineer;
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of days
for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract
execution. “Fraudulent practice” means a misrepresentation off acts in
order to influence a procurement process or the execution of a contract to
the detriment of the borrower, and includes collusive practice among
Bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits
of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above,
the Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract
by the Contractor, the Engineer shall issue a Certificate for the value of the
work done less advance payment s received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due
to deducted at source as per applicable law and less the percentage to
apply to the work not completed as indicated in the Contract data.
Additional Liquidated Damages shall not apply. If the total amount due to
Additional Liquidated Damages shall not apply. If the total amount due to
the Employer exceeds any payment due to the Contractor the difference
shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue
a certificate for the value of the work done, the cost of balance material
brought by the contractor and available at site, the reasonable cost of
removal of equipment, repatriation of the Contractor’s personnel employed
solely on the works, and the Contractor’s cost of protecting and securing
the Works and less advance payment received up to the date of the
certificate, less other recoveries due in terms of the contract and less taxes
due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipment, Temporary Works and Works
are deemed to be property of the Employer, if the Contract is terminated
because of a Contractor’s default.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after
receiving this certificate and shall be paid for all work carried out before
receiving it and for any work carried out afterwards to which commitment
F: SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract,
make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the
Engineer may prescribe, showing the staff and the numbers of the several
classes of labour from time to time employed by the Contractor on the site
and such other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and
rules made thereunder, regulations, notification and bye laws of the State
or central Government or local authority and any other labour law
(including rules), regulations, bye laws that may be passed or notifications
that may be issued under any labour law in future either by the State or
the Central Government or the local authority. Salient features of some of
the major labour laws that are applicable to the construction industry are
given below. The Contractor shall keep the Employer indemnified in case
any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made
there under, regulations or notifications including amendments. If the
Employer is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for observance of the provisions
stipulated in the notifications/bye laws/Acts/Rules/regulations including
amendments, if any, on the part of the Contractor, the Engineer/employer
shall have the right to deduct any money due to the Contractor including
his amount of performance security. The Employer/Engineer shall also
have the right to recover from the Contractor any sum required or
estimated to be required for making good the loss or damage suffered by
The employees of the Contractor and the Sub-Contractor in no case
shall be treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS
A) Workmen Compensation Act 1923:- The Act provides for compensation in
case of injury by accident arising out of and during the course of
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
B) Payment of Gratuity Act. 1972:- Gratuity is payable to an employee
under the Act on satisfaction of certain conditions on separation if an
employee has completed 5 years service or more on death, the rate of
days wages for every completed year of service. The Act is applicable to all
establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act
Provides for monthly contributions by the employer plus workers @ 10% or
8.33% The benefits payable under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for
certain welfare measures to be provided by the Contractor to contract
labour and in case the Contractor fails to provide, the same are required to
be provided, by the Principal Employer by Law. The principal Employer is
required to take Certificate of Registration and the Contractor is required to
take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or
more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less
than the Minimum Wages fixed by appropriate Government as per
provisions of the Act, if the employment is a scheduled employment.
Construction of Building, Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages
are to be paid, when it will be paid and what deductions can be made from
the wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not
making discrimination against female employees in the matter of transfer,
training and promotions etc.
I) Payments of Bonus Act 1965:- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of
wages to employees drawing Rs. 3500/- per month or less. The bonus to be
paid to employees getting Rs, 2500/- per month or above Rs. 3500/- per
month shall be worked out by taking wages as Rs.2500/-per month only.
The Act does not apply to certain establishments. The newly set-up
establishments are exempted for five years in certain circumstances. Some
of the State Governments have reduced the employment size from 20 to
for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike
or lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to
all establishments employing 100 or more workmen (employment size
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
reduced by some of the State and Central Government to 50). The Act
provides for laying down rules governing the conditions of employment by
the Employer on matters provided in the Act and get the same certified by
the designated Authority.
L) Trade Unions Act 1926:-The Act lays the procedure for registration of
trade unions of workmen and employers. The Trade Unions registered
under the Act have given certain immunities from civil and criminal
M) Child Labour (Prohibition & Regulation Act 1986 :-The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labouris prohibited in
Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment &
Conditions of service) Act 1979:- The Act is applicable to an
establishment which employs5 or more inter-state migrant workmen
through an intermediary (who has recruited workmen in one state for
employment in the establishment situated in another state). The inter-state
migrant workmen, is an establishment to which this Act become
sapplicable, are required to be provided certain facilities such as housing,
medical aid, traveling expenses from home up to the establishment and
O) The Building and Other Construction workers (Regulation of
employment and Conditions of Service) Act 1996 and the Cess Act of
1996:- All the establishments who carry on any building or other
constructions work and employ 10 or more workers are covered under this
All such establishments are required to pay cess at the rate not exceeding
2% of the cost of construction as may be modified by the government. The
Employer of the establishment is required to provide safety measures at the
Building or construction work and other welfare measures, such as
canteens, First Aid facilities, Ambulance, Housing accommodations for
workers near the workplace etc. The Employer to whom the Act applies has
to obtain a registration certificate from the Registering Officers appointed
by the Government.
P) Factories Act 1948 :-The Act lays down the procedure for approval of
plans before setting up a factory, health and safety provisions, welfare
provisions, working hours, annual earned leave and rendering information
regarding accidents or dangerous occurrences to designated authorities. It
is applicable to premises employing 10 persons or more with aid of power
or 20 or more persons without the aid of power engaged in the
manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made the re of from
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,1974
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reduction of pollution as
in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCC Clause24)
The procedure for arbitration will be as follows:-
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer (Higher Authority) within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any party
can refer the matter for conciliation within 15 days from the decision given
by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the #Superintending Engineer, both the parties have to refer to
the #Chief Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Superintending Engineer, both parties have to refer
to the #Secretary, Roads & Building Department, Government of Gujarat
for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contractor fails to refer a claim /dispute to the
Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional
payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-4: CONTRACT DATA
Clause Reference With respect To section
Item marked“N/A”do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Executive Engineer(Mech.), Gujarat Maritime Board, PIU-
Jamnagar / Gandhinagar
Address: Office Of The Executive Engineer,(Mech.), 1st Floor,
GMB office complex, near ST Bus Stand, Behind Chapatti
Ground Jamnagar-360575
Name of authorized Representative(will be intimated later)
2. The Engineer is………………………
Name of Authorized Representative:…………………………
3. The Defects Liability Period is 01(One)year from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the [CL.1.1]
Notice to proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
03 (Three) Months after start of work with the following
Mile stone dates: [CL.2.2&49.1]
Physical works to be completed Period from the start
date Milestone1i.e. ….. % …. days.
Milestone2i.e. …..% …days.
Milestone3i.e. …..% …..days.
Milestone4i.e. …..% ….days.
6. The Site is located at to be proposed by the bidder. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Dredger repairing work with items as per [CL.1.1]
B.O.Q. The works shall, interlay, include the following, as
Specified or as directed:
Site clearance; setting – out and layout; widening of existing
carriageway and strengthening including camber corrections;
construction of new road/ Parallel service road; bituminous
pavements remodeling/construction of Junctions,
intersections, bus bays, lay-bays; supplying and placing of
drainage Channels, flumes, guard posts and guard other
related items; construction/extension of cross drainage works,
bridge, approaches and other related stones; protective works
for roads/bridge; all aspects of quality assurance of various
components of the works; rectification of The defects in the
completed works during the Defects Liability Period;
submission of “As- built’’ drawings and any other related
documents; and other item of work as may be required to be
carried out for completing the work in accordance with the
drawings and the provisions of the contract and to
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments
and bearing; pre stressed / reinforced cement concrete
superstructure; wearing coat, hand railings, expansion joints,
approach slabs, drainages spouts/down take pipes, arrangements for
fixing light posts, water mains, utilities etc; provision of suitably
designed protective works; providing wing/return walls; provision of
road markings, road signs etc.; all aspects of quality assurance;
clearing the site and handing over the works on completion;
rectification of the defects during the Defects Liability Period and
submission of “As-built” drawings and other related
documents; and other items of work as may be required to be carried
out for completing the works in accordance with the drawings and the
provisions of the contract and to Insure safety [CL.1.1]
(C) Other Items
Any Other Items as required to fulfill all contractual obligations as per the [CL.2.3(9)]
Bid documents. [
10. The following documents also form part of the Contract:
As per clause 2-3
11. The law which applies to the Contract is The law of Union of India
12. The language of the Contract documents is English
13. Limit of sub contracting 25% of the Initial Contract Price
14. The Schedule of Other Contractors
15. The Schedule of Key Personnel As per Annex–II to Section I
16. The minimum insurance cover for physical property, injury and death is Rs [CL13]
5 lakhs per occurrence with the number of occurrences limited to four.
After each occurrence, the contractor will pay an additional premium
necessary to make insurance valid for four occurrences always.
17. Site Investigation report
18. The Site Possession dates shall be Dated……………………..
19. The period for submission of Programme for approval of the engineer [CL.27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be.............days.
21. The amount to be withheld for late submission of an updated (i
Programme shall be Rs ........ lakhs
22. The following events shall also be Compensation Events Substantially
adverse ground conditions encountered during the Course of execution
of work not provided for in the bidding document.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional [CL.44]
mobilization by the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc.
not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
Military authority.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
23. The currency of the Contract is Indian Rupees [CL.46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm),
such that the gross % weight of the components shall remain
R= value of work as defined in Clause47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due
to labour shall be paid in accordance with the following
VL= Increase or decrease in the cost of work during the
month under consideration due to changes in rates
for local labour
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li= The consumer price index for industrial workers for the
State for the month under consideration as published
by the Labour Bureau, Ministry of Labour,
Government of India.
Pl= Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the
cost of cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in
rates for cement.
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic
Department for Promotion of Industry and
Internal Trade, Ministry of Commerce &
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Ci= The all India average wholesale price index for
Ordinary Portland Cement for the month
under consideration as published by Office of
the Economic Adviser, Department for
Promotion of Industry and Internal Trade,
Ministry of Commerce &Industry.
Pc= Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel
procured by the contractor shall be paid in accordance with the
following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel-Long
Products Re bars) on 28 days preceding the date of opening of
Bids as published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel -
Long Products Re bars) for the month under consideration as
published by Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of
Commerce &Industry.
Ps=Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel-
Long products Re bars has been chosen to represent the
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid
in accordance with the following formula
Vb=Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi= The official retail price of bitumen of IOC depot at the nearest
centre for the 15th day of the month under consideration.
Pb=Percentage of bitumen component of the work
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to
the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of
IOC at the nearest centre for the 15th day of the month of the under
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil
has been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi= The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and
parts has been chosen to represent the Plant and Machinery
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the
contractor shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than
cement, steel, bitumen and POL.
M0= The All Indian wholesale price index (all commodities) on 28days
preceding the scheduled date of opening of technical Bids, as published
by the Office of the Economic Adviser, Department for Promotion
of Industry and Internal Trade, Ministry of Commerce &Industry.
Mi= The All India wholesale price index (all commodities) for the month
under consideration as published by the Office of the Economic
Adviser, Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pm= Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the entire
Sr. No Description Of Material Percentage
6 Plant & Machinery Spares Pp %
7 Other Materials–Pm %
25. The proportion of payments retained (retention money) shall be 6%
{CL.48} from each bill subject to a maximum of 5% of final contract
26. Amount of Liquidated damages for For Whole of work {CL.49}
Delay in Completion of work (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
(wherever specified In item 6 of
Contract data) (1/2000)th of
initial contract price for #5 km
Section, rounded off to the
nearest thousand per day.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
27. Maximum limit of liquidated damages 10 percent of the Initial {CL.49}
For delay incompletion work Contract Price rounded off to
The nearest thousand. L.D. AS per
chapter 3 clause 3.37.
28. Amount of Bonus for early completion Amount of bonus for early
Completion of work shall
be given as per CL.50 of
29. Maximum limit of bonus for early 5 percent of the Contract
{CL.50} Completion of work Price
30. The amount of the advance payment are: {CL. 51 &52}
#Nature of Advances Amount(Rs.)
i Mobilization10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The
contractor may furnish four
bank guarantees of 2.5 % of
each valid for the full
ii Equipment 90% for new and 50% of After equipment is brought to
depreciated value for old site (provided the Engineer is
equipment. Total satisfied That the equipment is
amount will be subject required for performance of the
to a maximum of 5% of contract) and on submission of
the Contract Price unconditional Bank Guarantee
amount of advance
iii Secured Deleted
(The advance payment will be paid to the Contractor no later than 28 days
after fulfillment of the above conditions).
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
31. Repayment of advance payment for mobilization and equipment {CL.51.3}
The advance loan shall be repaid with percentage deduction from the
interim payments certified by the Engineer under the Contract.
Deduction shall commence in the next Interim Payment Certificate
following that in which the total of all such payments to the Contractor
has reached not less than 20 percent of the Contract Price or 6 (six)
months from the date of payment of first installment of advance,
whichever period concludes earlier, and shall be made at the rate of
percent (collectively for both Mobilization Advance and Equipment
Advance) of the amounts of all Interim Payment Certificate until such
time as the loan has been repaid, always provided that the loan shall be
completely repaid prior to the expiry of the original time for completion
pursuant to Clause 17 and28.
33. The securities shall be for the following minimum amounts
equivalent {CL.52} As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs.
…………….. (to be decided after evaluation of the bid) as additional
security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer
shall be an unconditional Bank Guarantee of the type as presented in
Section 8 of the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL.58}
35. The date by which “as– built” drawings (in scale as directed) in
sets{CL. 58}are required within 28 days of the issue of certificate of
completion of the whole or section of the work, as the case maybe.
36. Theamounttobewithheldforfailingtosupply“asbuilt”drawings{CL.58}by
The Date required is Rs ..... Lacs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl
The Employer’s additional cost for completing the Works shall be 20 percent.
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-5: TECHNICAL SPECIFICATION
As Per Separate Sheet Attached under CHAPTER-9
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-6: FORM OF BID
Description of the Works:
1. We offer to execute the Works described above and remedy any defects
therein in conformity with the conditions of Contract, specification,
drawings, Bill of Quantities and Addenda for the sum (s)of
2. We undertake, if our Bid is accepted, to commence the Works as soon as
is reasonably possible after the receipt of the Engineer’s notice to
commence, and to complete the whole of the Works in the Contact within
the time stated in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date
fixed for receiving the same, and it shall remain binding upon it and may
be accepted at any time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid,
together with your written acceptance thereof, shall constitute a binding
contract between us.
5. We understand that you are not bound to accept the lowest or any tender
you may receive.
-------duly authorized to sign bids for and on behalf of------------------------------
(in block capitals or typed)
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-7: BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities ,where applicable, and otherwise at
such rates and prices as the Engineer may fix within the terms of the
3. The rates and prices tendered in the priced Bill of Quantities shall, except in
so far as it is otherwise provided under the Contract, include all
constructional plant, layout, supervision, materials, erection, maintenance,
insurance, profit, taxes and duties, together with all general risks, liabilities
and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered by
other rates and prices entered in the Bill of Quantities (in case of Item rate
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer,
required blasting, or the use of metal wedges and sledgehammers, or the use
of compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150 kw with a single rear mounted heavy
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and In
reference to book of figures
specifications)
AS PER SEPARATE ATTACHED SHEET UNDER CHAPTER-8
I/We am/are willing to carry out the work at…............ %above/below percent (Should be
Written in figures and words) of the estimated rate mentioned above. The Amount of
my/our tender works out as under.
Estimated amount put to tender Estimated amount put to
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Deduct………% below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
specification and In In
reference to book of figures Words
specifications)
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any)%(in
figure)……………………………… (in
(C)Net Tendered Amount (A-B)(in figure) ………………………………
1 TheContractorshallexhibitaboardwithdetailedspecificationanddetailsofworkas
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of
4 InallR.C.C.ItemsinRateAnalysisStandardCementConsumptionhasbeentakenasper
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated
in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
Of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
SECTION-8: SECURITIES AND OTHER FORMS
BID SECURITY (BANKGUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter
called the “The Bidder”) has submitted his bid Dated ------------------------
(Date) for the construction of (Name of Contractor hereinafter called
KNOW ALL PEOPLE by these presents that We-------------------------------------------
(nameof Bank)of ------------------------------------------- (name of country)having our
Registered office at-------------------------------------------------------(herein after
“the bank”)are bound unto--------------------------------------------(name of Employer)
(herein after called “The Employer”)in the sum of--------------------------------------*
For which payment well and truly to be made to the said Employer the
Bankitself ,his successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this----------------------day of
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder withdraws his bid during the period of
Bid validity specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the
Employer during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in
accordance with the Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security ,in accordance
with the Instructions to Bidders ;or
C. Does not accept the correction of the Bid Price pursuant to
Clause27 (Correction of Errors)
We undertake to pay to the Employer up to the above amount
upon receipt of his first written demand, without the employer having
to substantiate his demand, provided that in his demand the Employer
will note that the amount claimed by him is due to him owing to the
occurrence of one or any of the three conditions, specifying the
occurred conditions or conditions.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
This Guarantee will remain in force up to and including the date ------------ **
days after the deadline for submission of Bids as such the dead line is
stated in the Instructions to Bidders or as it may be extended by the
Employer, notice of which extension (s) to the Bank is hereby waived.
Any demand in respect of this guarantee should reach the Bank not
later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and
figures denominated in Indian Rupees. This figure should be the
same as shown in Clause 16.1(Bid Security) of the Instructions to
**45 days after the end of the validity period of the Bid. Date should
be inserted by the Employer before the Bidding documents are
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
PERFORMANCE SECURITY
Name: The Executive Engineer (Mech.), PIU, Jamnagar
4th floor, Saru section road,
Jamnagar- 361 006 (Gujarat) India.
contractor)(hereaftercalled“theContractor”)hasundertaken,inpursuanceof
---------(name of Contract and brief description of Works) (hereinafter called
“The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that
the Contractor shall furnish you with a Bank Guarantee by a recognized bank
for the sum specified therein as security for compliance with his obligation in
accordance with the Contract.
ANDWHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and
responsible to you on behalf of the Contractor, up to a total of--------------------
(amount of guarantee)* ---------------------------- (in words),such sum being payable in
types and proportions of currencies in which the Contract prices is payable,
and we undertake to pay you ,upon your first written demand and without
cavil or argument ,any sum or sums with in the limits of---------------------------
(amountofguarantee)asaforesaidwithoutyourneedingtoproveortoshowgrounds
or reasons for your demand for the sum specified therein.
Weherebywaivethenecessityofyourdemandingthesaiddebtfromthecontractor
before presenting is with the demand.
We further agree that no change or addition to or other modification of the
terms of the Contract to of the Works to be performed there under or of any of
the Contract documents which may be made between your and the Contractor
shall in any way release us from any liability under this guarantee, and we
here by waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of
the Defect Liabilities period.
Signature and Seal of the guarantor------------------------
*An amount shall be inserted by the Guarantor, representing the percentage
the Contract price specified in the Contract denominated in Indian Rupees.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
ADDITIONAL PERFORMANCE SECURITY
[Clause34.1.(A)]
Name: The Executive Engineer (Mech.), PIU, Jamnagar
4th floor, Saru section road,
Jamnagar- 361 006 (Gujarat) India
contractor)(hereaftercalled“TheContractor”)hasundertaken,inpursuanceof
---------(Name of Contract and brief description of Works) (hereinafter called “The
AND WHEREAS it has been stipulated by you in the said Contract
that the Contractor shall furnish you with a Bank Guarantee by a
recognized bank for the sum specified therein as security for compliance
with his obligation in accordance with the Contract.
AND WHERE AS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and
responsible to you on behalf of the Contractor, upto a total of-----------------
(amount guarantee)--------------------------------(inwords),such sum being
payable in types and proportions of currencies in which the Contract
prices is payable, and we undertake to pay you ,upon your first written
demand and without cavil or argument ,any sum or sums with in the
(amountofguarantee)asaforesaidwithoutyourneedingtoproveortoshowgroun
ds or reasons for your demand for the sum specified therein.
Weherebywaivethenecessityofyourdemandingthesaiddebtfromthecontractor
before presenting is with the demand
We further agree that no change or addition to or other modification of the
terms of the Contract to of the Works to be performed there under or of
any of the Contract documents which may be made between your and the
Contractor shall in any way release us from any liability under this
guarantee, and we here by waive notice of any such charge, addition or
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor---------------------
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
BANK GUARANTEEF OR ADVANCE PAYMENT
InaccordancewiththeprovisionsoftheConditionsofContract,sub-clause
51.1(“Advance Payment”)of the above mentioned Contract,-----------------------------
------------------- (name and address of Contractor)(herein after called
“the Contractor”)shall deposit with
(name of Employer) a bank guarantee his proper and
faithful performance under the said Clause of the Contract in an amount
of (amount of Guarantee)*-
We, the ----------------------------- (bank of financial institution),as instructed
by the Contractor, agree unconditionally and irrevocably to guarantee as
primary obligator and not as Surety merely, the payment to-------------------
--------------------- (name of Employer) on his first demand without
whatsoever right of obligation on our partand without his first claim to the
Contractor ,in the amount not exceeding---
-------------------- (amount of guarantee)*words) -------------
We further agree that no change or addition to or other modifications of the
terms of the Contractor or Works to be performed there under or of any of
the Contract documents which may be made between --------------------------
------- (name of Employer) and the Contractor, shall in any way release us
from any liability under this guarantee, and we hereby waive notice of any
such change, addition or modifications.
This guarantee shall remain valid and in full effect from the date of
the advance payment under the Contract until ----------------------------------
---- (name of employer) receives full repayment of the same amount from
the contractor.
Signature and Seal
Bank/Financial Institution Address
*AnamountshallbeinsertedbythatBankorFinancialInstitutionrepresentingth
e amount of the Advance Payment, and denominated in Indian Rupees.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Letter of Acceptance
(Letter head paper of the Employer)
(Name and address of the Contractor)
This is to notify you that your Bid dated for execution of
the (Name of the contract and identification number,as
given in the Instructions to Bidders)for the Contract Price of Rupees ( )
(amount in words and figures) as corrected and modifiedinaccordance with the
Instructions to Bidders* is hereby accepted by our agency.
You are requested to furnish performance security, in the form
detailed in para34.1 of ITB for an amount equivalent to Rs.___ within
days of the receipt of this letter of acceptance up to beyond 60 days from
the date of expiry of defects Liability period i.e.upto and the
Additional Performance Security for an amount equivalent to Rs. shall
be valid beyond 28 (twenty-eight) days of Project Completion Datei.e.upto
and sign the contract, failing which action
as stated in Para 34.3 of ITB will be taken.
Yours Faithfully
Signatory Name of
* Delete “Corrected and” or and modified if only one of these actions applies.
Delete as corrected and modified in accordance with the Instructions to
Bidders, if corrections or modifications have not been affected.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Issue of Notice to proceed with the work
(Letter head of the Employer)
(Name and address of the Contractor)
Pursuant to your furnishing there quisite security in ITB
Clause34.1 and signing of the Contract for the work of
At a bid Price ofRs.
You are here by instructed to proceed with the execution of the said
works in accordance with the contract documents.
Yours faithfully
(Signature, name and title of signatory
authorized To sign on behalf of Employer)
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
This agreement, made on the day of between
_ (name and address of Employer) (Hereinafter called
“the Employer) and (name and a
Where as the Employer is desirous that the Contractor execute
Name and identification number of contract (hereinafter called “the
works”) and the
employerhasacceptedtheBidbytheContractorfortheexecutionandcompletion
of such works and the remedying of any defects therein, at a cost of Rs.
NOWTHISAGREEMENTWITNESSETHASFOLLOWS
1. In this Agreement, words and expression shall have the same meanings
respectivelyassignedtothemintheconditionsofcontracthereinafterreferred
to and they shall be deemed to form and be read construed as part of
this Agreement.
2. In Consideration of the payment to be made by the Employer to the
contractor as hereinafter mentioned, the Contractor hereby covenants
with the Employer to executive and complete the works and remedy any
defects therein in conformity in all aspects with the provisions of the
3. The employer hereby covenants to pay the Contractor in consideration
of the execution and completion of the works and the remedying the
defects wherein contract price or such other sum as may become
payable under the provisions of the Contract at the times and in the
manner prescribed by the contract.
4. TheFollowingdocumentsshallbedeemedtoformandbereadyandconstrued
as part of this Agreementviz
i) Letter of Acceptance
ii ) Notice to proceed with the
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
iii) Contractor’sBid
iv) Conditions of contract :Generaland
v) Contract Data
vi) Additional conditions
viii) Bill of Quantities and
ix) Any other documents listed in the
Data as forming part of the Contract.
In witness where of the parties there to have caused this Agreement
to be executed the day and year first before written
The Common seal of------------- Was hereunto affixed in the presence of:
Signed, sealed and Delivered by the said
In the presence of
Binding signature of Employer
Binding Signature of Contractor
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
(For Investment)
I, the undersigned do hereby undertake that our firm M/s
to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
(For BID Validity)
I ,the undersigned do hereby undertake that our firm M/s……………………………………
……………..………………………………..agree to a bid e by this bid for a period .......... days
For date fixed for receiving the same and it shall be binding on us and may be
accepted at any time before the expiration of that period.
(Signed by an Authorized
officer of the firm)
Title of officer
Signature of Contractor
Executive Engineer (M),
GMB, PIU-Jamnagar
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
TENDER FORM FOR ELECTRICAL WORK
Roads & Building Department
Government of Gujarat
Division : _________ “As per NIT”___________
ELECTRICAL WORK
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Tender document contain Pages 1 to 55 Page No
C Instructions to tenderers
Form of tender for electrical work (induplicate) with
schedule of time limit
E General Conditions
F Data Sheet for E-tendering
G General Condition of contract for electrical works
J Specification for electric works
K List of approved Electrical Products
(i) Amount put to tender Rs.
(ii) Tender fee Rs.
(iii) Earnest Money Rs………………………..
Security Deposit Rs…………………… Performance Bond
Last Date of Receipt of Tenders by R.P.A.D. Dt. ____/____/_________
Downloading of tender documents From date ____/____/________
Divisional Account/D.A.O.
Executive Engineer
(Only in case of Tender above Ten lakhs)
1. Name of Work … ……………………As per
2. Estimated Cost … ……………………As per
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
3. Earnest Money 1% ……………………As per
4. Validity period of tender offered … (90/120*) days from the stipulated
date of receiving tender if tenders are
invited off line and no modification
shall be allowed after handing over
the to postal authorities. In case of on
line tenders, the validity period shall
be counted from the date of opening
on line tenders, in case of single cover
system tenders and from the date of
opening technical bid in case of two
cover system tenders
5. Security Deposit -
(i) In the form of small
Savings or Narmada Bonds or
FDR of schedule bank
(of minimum one year time limit) 2.5% …………………..As per
(ii) To be deducted from bills (Security 2.5% …………………..As per
Deposit) NIT……………………….
(Deduction at rate of 5% from
each Running Bill shall
be made till stipulated
maximum amount is
(iii) Performance bond of schedule Bank 5% …………………..As per
(In case of tender estimating Rs. NIT……………………….
30 lacs or more)
Total 10% …………………..As per
6. Time limit … …………………..As per NIT…………..
* Strike out whichever is not applicable
* Vide R & GD G. R. No. TNC – 1088 – 1B/1 (13) / C dated 4-5-1993 & revised vide G.R. No. TNC-
(Part 2)-C dated 20-11-13
Deposit furnished in the form of interest bearing document as per Item .4 (i) can further be
extended for renewal if so desired and communicated by the Contractor in writing before one month
from the date expiry date. Similarly Security Deposit deducted as the Item No.4(ii) can also be converted
into interest bearing fixed term securities of schedule and Nationalised Bank. If so desired and
communicated by the contractor in writing. The security Deposit will be released against Bank
Guarantee as provided in Clause 3.8 of General Condition of Contract.
Should this tender be accepted, I/We hereby agree to abide by and fulfil all the terms and
Provisions of the conditions of the contract annexed here to so far as applicable and in default thereof
to forefeit and pay to Government in office the sums of money mentioned in the said conditions.
(Receipt No. ___________ dated _______________ from the Government Treasury or Sub-Treasury at
_____________ in respect of sum Rs.* _________________________________ is forwarded herewith
representing the earnest money + (a) the full of value of which is to be absolutely forfeited to
Government should I/We not deposit the full amount of security deposit specified in the above
memorandum in accordance with Clause-I of the said conditions, otherwise the said sum of above Rs.
______________________________shall be refunded).
Place : *Digital signature of contractor
**Signature of the contractor
(witness)*** (At the time of execution of contract document)
*Digital signature of contractor before submission of tender.
**Signature of contractor at the time of execution of contract document.
***Signature of witness to Contractor’s signature at the time of execution of Contract document
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
The above tender is hereby accepted by me on behalf of the Government of Gujarat
Signature of The Executive Engineer,
Note: The normal rate of Security Deposit is 5 percent for works upto Rs. 30 lacs and further 5 % as
performance bond for works above Rs. 30 lacs. Out of 5 % of Security Deposit 50 % is Payable at the
time of acceptance of tender and the balance by deduction from progress bills.
Instructions to Tenderers
1. Tenders, sealed and marked 0n the outside for
“will be received by undersigned
Upto the day of
In the form of “Tender for Electrical Works” hereto annexed
2. The tendererd shall state precisely in his tender the type and description of the materials,
plant and stores he proposes to use for the work. If he proposes to use materials, plant or
stores of other than Indian manufacture he must clearly state this in his tender, together
with the name, manufacturer and of the country of origin of the same.
3. The office with whom cash deposits are to be made, or to whom securities are to be
endorsed accordance with clause 3 of General Condition of Contract for Electrical Works, is
4. The work must be carried out in accordance with the General Condition of Contract for
Electrical Works. and the general specification for electrical works in Government building.
5. Plans may be seen, in the office of the Ex.
6. The Governor of Gujarat does no undertake to accept the lowest or any tender.
Executive Engineer.
SR to Dredger U B Pavankumar for Intermediate IRS survey at Bedi Port (3rd attempt)".
Form of Tender for Electrical Works
1. I/We do hereby tender to execute the whole of the work Described in the accompanying tender for
the several sums, and in the case of measured works, at the several rates, set forth in the tender
hereto attached and signed by me/us and should this tender be accepted. I/We further undertake to
complete the work within the time stated below reckoned form the date of acceptance of tender,
2. I/We do agree and bind myself/ourselves to abide by and fulfil the general conditions of contract
and the Special Conditions of Contract annexed to the Specification or in default thereof to pay to
the purchaser, as reasonable compensation for such breach of such conditions, the sums of money
mentioned in the said condition.
3. I/We further agree to make good at my/our own expense all defect in the installation which appear
within twelve months from the date bringing the installation into beneficial use when such defects
are due to defective workmanship or material executed or supplied by me/us.
4. I/We hereby declare that my/our near relative are not working in this Division or in its sub-division
as an Ex. Engineer, Deputy Executive Engineer, Additional Assistant Engineer, Overseer, Divisional
Accountant, Store Keeper, Manager of Atithi/Vishram Gruha and in the circle as a Superintending
Engineer in additional for Panchayat Works not working nor having posting as Chairman of P.W.
Committee or as incumbent in Jilla Panchayat at today.
The above tender is hereby accepted by me for and on behalf of the Governor of Gujarat.
Executive Engineer,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender for SR to UB Pavan Kumar(3rd Attempt).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .