| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC SAL SABEEL MANZIL H MANNA THALIPARAMBA PO KANNUR 670141 | THALIPARAMBA | KANNUR | KERALA | 670141 | ₹25.4 L | L1 | Accepted-AOC Lowest bid |
| 2 | L2₹26.8 LRejected-Finance | ₹26.8 L | L2 | Rejected-Finance Highest bid |
| Sl No | Description | Qty | Unit | ABDUL MAJEED K L1 | MUHAMMED SHAMEEM OPK L2 |
|---|---|---|---|---|---|
| 1.00Tarring | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 687 | sqm | 14.7 ₹10,098.90 | 15 ₹10,305 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 103.05 | cum | 3,449.92 ₹3.6 L | 3,500 ₹3.6 L |
| 1.00 | 5.1.1a:Prime Coat :- Low porosity <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 687 | sqm | 75.89 ₹52,136.43 | 80 ₹54,960 |
| 1.00 | 5.2.2a:Tack Coat <br>Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 687 | sqm | 16.39 ₹11,259.93 | 17 ₹11,679 |
| 2.00Retaring | |||||
| 2.00 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 474.65 | sqm | 295.49 ₹1.4 L | 300 ₹1.4 L |
| 2.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 203.05 | sqm | 382.21 ₹77,607.74 | 400 ₹81,220 |
| 2.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 3,816.45 | sqm | 13.73 ₹52,399.86 | 15 ₹57,246.75 |
| 2.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 4,503.45 | sqm | 275.36 ₹12.4 L | 300 ₹13.5 L |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
23 Oct 2025, 6:00 pmClosed
AE
Valanchery Muncipality
Annual Plan 2025 2026 Valanchery Municipality Project No 226 26 Thazhangadi Chungam Road Maintenance in Division 22 24
2025_LSGD_811074_2
08 2025 26 AE LID EW VLRY VIII PHASE
Open Tender
Civil Works - Roads
180 days
Valanchery
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
4 Feb 2026
17 Oct 2025
25 Oct 2025
17 Oct 2025
23 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1354204.xls
BOQ • 0.31 MB
pa.pdf
Tender Documents • 0.19 MB
viewsbd.pdf
Tender Documents • 2.03 MB
Download all tender documents and submit your bid