| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | ₹20.0 L | L1 | Accepted-AOC Labour contract coperative society(Association of person) |
| 2 | L2₹19.8 LRejected-Finance | ₹19.8 L | L2 | Rejected-Finance Higher rate |
| 3 | L3₹19.8 LRejected-Finance | ₹19.8 L | L3 | Rejected-Finance Higher rate |
| 4 | L4₹39.4 LRejected-Finance | ₹39.4 L | L4 | Rejected-Finance Higher rate |
| Sl No | Description | Qty | Unit | Surya Constructions L4 | BLCCS LTD L3 | SKC L2 | biju punnoose L1 |
|---|---|---|---|---|---|---|---|
| 1.00shoulder protection works | |||||||
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 122.7 | cum | 700 ₹85,890 | 47 ₹5,766.90 | 49 ₹6,012.30 | 95 ₹11,656.50 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 184.05 | cum | 12,000 ₹22.1 L | 6,900 ₹12.7 L | 6,900 ₹12.7 L | 6,740 ₹12.4 L |
| 1.00 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 61.35 | cum | 15,000 ₹9.2 L | 8,379 ₹5.1 L | 8,400 ₹5.2 L | 8,490 ₹5.2 L |
| 1.00 | OD275790/2022-2023:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical
post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level,
all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367
and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section
150 x 75 x 5 mm, 330 mm long complete as per clause 811.3 | 54 | metre | 12,500 ₹6.8 L | 3,765 ₹2.0 L | 3,500 ₹1.9 L | 3,706 ₹2.0 L |
| 1.00 | 3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 44 | cum | 1,200 ₹52,800 | 86 ₹3,784 | 90 ₹3,960 | 85 ₹3,740 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Roads Division, Kollam.
GENERAL Shoulder protection Construction of Irish drain and protective works in Mulavana Kaithacode road between CH 1 200 and 2 780 General Civil Work
2026_PWD_831751_2
85/EE/ET/2025-26
Open Tender
Civil Works - Roads
60 days
Kollam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
16 May 2026
11 Feb 2026
20 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
shoulder protection works
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
OD275790/2022-2023:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD.pdf
Tender Documents • 1.64 MB
NIT.pdf
Tender Documents • 0.04 MB
BOQ_1405869.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid