| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L1 | Accepted-AOC Lowest , Agreement executed | |
| 2 | L2₹5.5 L+₹34,440 (6.67%)Rejected-AOC | L2 | Rejected-AOC Third lowest | |
| 3 | L3₹6.4 L+₹1.2 L (23.2%)Rejected-AOC | L3 | Rejected-AOC second lowest | |
| 4 | L4₹6.6 L+₹1.5 L (28.6%)Rejected-Finance | L4 | Rejected-Finance 4th lowest | |
| 5 | L5₹6.9 L+₹1.8 L (34.1%)Rejected-Finance | L5 | Rejected-Finance 5th lowest |
Tender Value
₹7.4 L
EMD Value
₹18,500
Closing Date
24 Jun 2020, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Minor Irrigation Sub Division, Aluva
Desilting of thodu
2020_Irrig_365689_1
AEE/MISDN/ALY/ 21/ET/2020-21/S
Open Tender
Civil Works - Others
Item Rate
30 days
Paravur Muncipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,950
Yes
online
₹18,500
Yes
14 Jan 2021
17 Jun 2020
25 Jun 2020
17 Jun 2020
24 Jun 2020
17 Jun 2020
17 Jun 2020 - 24 Jun 2020
Amount
Scheme 1- from ch.0m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 2 - from ch.720 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 3- from ch.1440m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 4 - from ch.2160m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 5 - from ch.2880 m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
Scheme 6 - from ch.3600m
Earthwork excavation in all classes of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sq.m. on plan) including depositing the excavated soil in a place and disposal of excavated soil from there with all leads and lifts etc. complete as directed by departmental Officers at site ( disposing the excavated soil away from the site at contractor's own conveyance after testing the excavated soil and ascertaining the cost which will be deducted from the bill.)
T A JOSEPH
CIJU JOHN
E V POLLY
TBAS CONSTRUCTIONS
Bidder Name
DAISY JOSE
E V POLLY
T A JOSEPH
CIJU JOHN
TBAS CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_516572.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .