| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹13.2 Cr+₹50.1 L (3.79%)Accepted-AOC | 2 | Accepted-AOC L2 | |
| 2 | 1₹13.2 CrRejected-Finance | 1 | Rejected-Finance L1. L1 bidder expressed his unwillingness vide letter referred No 5 to
execute the work | |
| 3 | 3₹13.9 Cr+₹65.3 L (4.94%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹14.3 Cr+₹1.0 Cr (7.92%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹14.7 Cr
EMD Value
₹5 L
Closing Date
23 Jan 2023, 3:00 pmClosed
SUPERINTENDING ENGINEER
PH CIRCLE, KWA, MALAPPURAM
JJM Improvements of CARWSS to Moorkkanad and Adjoining Panchayaths -Package -IX - Enhancing the Existing distribution line and Laying distribution line to non covered area in Makkaraparamba GP
2023_KWA_548409_1
SE/PHC/MPM/78/2022-23
Open Tender
Civil Works - Water Works
Item Rate
300 days
Makkaraparamba
Refer tender documents
8 documents required · 8 mandatory
₹16,540
₹5 L
PH CIRCLE, KWA, MALAPPURAM
20 Apr 2023
10 Jan 2023
24 Jan 2023
10 Jan 2023
23 Jan 2023
17 Jan 2023
10 Jan 2023 - 16 Jan 2023
16 Jan 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix -I A - Working Charge- Supplying and Laying of Distribution system | |||||
| 1.001 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | 559.02 | - |
| 1.002 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. | - | cum | 811.79 | - |
| 1.003 | 100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | - | cum | 1,349.98 | - |
| 1.004 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 1 | cum | 1,566.04 | ₹1,565.88 |
| 1.005 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | - | metre | 28.15 | - |
| 1.006 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | - | metre | 96.75 | - |
| 1.007 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | 30.63 | - |
| 1.008 | OD114553/2022-2023:Dismantling manually/by mechanical means and disposal of materials within 50meters lead asper
direction of Engineer in charge - Bituminous road | - | sqm | 88.42 | - |
| 1.009 | 100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead. | - | cum | 357.39 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
mergednit1111111.pdf
Tender Notice • 3.75 MB
BOQ_803042.xls
BOQ Document • 0.34 MB
112403993.pdf
Tender Document • 0.69 MB
112403994.pdf
Tender Document • 0.40 MB
scope1.pdf
Tender Document • 1.22 MB
q1toq8new.pdf
Tender Document • 0.26 MB
112403996.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .