Loading…
Loading…
Tender Value
₹27.6 L
EMD Value
₹27,650
Closing Date
15 Jun 2026, 5:30 pm
Executive Engineer, PRI Division, Narsapur
Narsapur
Construction of Village Health Clinic building at Ayodyalanka Village of Achanta Mandal - Est Cost Rs.36.00 Lakhs
941928
Nit No.06 - Tender Notice No.03/TO/2026-27 Dated:-26.05.2026 of the Executive Engineer,PRI Division Narasapur(5th Call)
OPEN - NCB
Buildings
WEST GODAVARI
6 documents required · 6 mandatory
₹979
₹27,650
1 Jun 2026
1 Jun 2026
1 Jun 2026
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including contract profit 13.615%
Cost and supply of sand for filling from approved source including cost and conveyance to work site. including contract profit 13.615%
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Foundations including contract profit 13.615%
Augoring and boring of holes in site and under reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with augoring and boring equipment as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of different diameter , inclding VRCC M- 30 design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work including contract profit 13.615%.375mm Dia D/U/R Piles 3.75mts Depth
Piles of 250mm dia-3.00m Depth Sur piles
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 & 10mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.materials including all operational, incidental , centering, shuttering and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for pile caps. including contract profit 13.615%
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc including all operational, incidental , centering, shuttering and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for Plinth beam. including contract profit 13.615%
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20&12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering usingSteel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc. including all operational, incidental , centering, shutteringand labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for Columns. including contract profit 13.615%
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc.including all operational, incidental , centering, shuttering and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for Lintel. including contract profit 13.615%
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. including all operational, incidental , centering, shuttering and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for Sunshades of 0.075m thick at support and 0.05m thick at free end. including contract profit 13.615%
V.RCC M- 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20 & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. including all operational, incidental , centering, shuttering and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work, for Roof Level Beams. including contract profit 13.615%
VRCC 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20&12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc. including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,Seigniorage charges for finished item of work. including contract profit 13.615% for Roof slab 125mm thick.
VRCC 30 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20&12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc. including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges ,Seigniorage charges for finished item of work. including contract profit 13.615% for staircase slab 150mm thick
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyance charges of all materials excluding seigniorage charges and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work. including contract profit 13.615%
Brick Masonry in CM (1:8) with Bricks traditional size 23 x 11 x 7 cms 2nd Class for basement including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete . including contract profit 13.615%
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd cl bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509. including contract profit 13.615%
Ornamental Plastering with CM (1:3) 8mm thick including cost and conveyance of all materials and all labour charges etc., complete for ceilings. including contract profit 13.615%
Plastering with CM (1:5) 12mm thick in single coat including cost and conveyance of all materials and all labour charges etc., complete for superstructure INTERNAL WALLS. including contract profit 13.615%
Plastering with CM (1:5) 12mm thick in single coat including cost and conveyance of all materials and all labour charges etc., complete for superstructure out side walls. including contract profit 13.615%
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. including contract profit 13.615%
Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. including contract profit 13.615%
Flooring with Ceramic tiles, set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. including contract profit 13.615%
Dadooing to walls with coloured glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:3), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, fine sand (screened), water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete excluding seigniorage charges for finished item of work (APSS No.701 & 707). including contract profit 13.615%
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls. including contract profit 13.615%
Painting to new walls with 2 coats of plastic emulsion paint over a priamry coat of white cement of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for External walls. including contract profit 13.615%
Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work. including contract profit 13.615%
Supply and fixing of Sal wood fully Panelled Door of size 1.20 x 2.10 met. with double shutters including cost and conveyance of all materials and labour charges and fixing all necessary fittings like Z-Hold fasts, Hinges, tower bolts, Aldrops etc. complete as per specifications. including contract profit 13.615%
Supply and fixing of Sal wood fully Panelled Door of size 1.00 x 2.10 met. with double shutters including cost and conveyance of all materials and labour charges and fixing all necessary fittings like Z-Hold fasts, Hinges, tower bolts, Aldrops etc. complete as per specifications. including contract profit 13.615%
Supply and fixing of Flush Door shutter of size 0.90 x 2.10mt with block board type with commercial ply onboth faces30 mm thick with frame made of well seasoned sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges as per specifications (APSS NO.1001 & 1002) . including contract profit 13.615%
Providing and fixing 28 -30 MM thick solid Wood Polymer single extruded door shutter with 3mm top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame (BMT-N.92). including contract profit 13.615%
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat of 32MM. Door Frame section of 45x75 MM . The two Vertical members are to be joined together with the horizontal member using 8x50 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.(BMT-N.83.A). including contract profit 13.615%
Providing and fixing factory made UPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multi-chamberedframe with in-built roller track and sash extruded profiles duly reinforcedwith 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads and uPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (whitepowder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at allcorners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality,Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm). including contract profit 13.615%
Providing MS Grills of 8mm to 40mm diameters, cutting, bending & forming grills for reinforcement work as per approved designs and drawings including Cost and Conveyance of bars from approved sources to site of work with all taxes complete for finished item of works. including contract profit 13.615%
Cost and supply of RCC jallies 50 mm thick for ventilators including cost and conveyance of all materials and labour charges etc., complete for finished item of work. including contract profit 13.615%
Painting with Synthatic Enamil Paint Two coats over a Primary coat of white lead including cost and conveyance of all mateirals etc complete
Supply and Fixing of 20mm dia (1.95-2.10 mm thick) P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned TW box including all labour charges etc., complete. Make : Sudhakar/ Maco Plast / Modi
Supply and run of 1 of 1.5 Sqmm FR / FRLS PVC insulated 1100V grade as per IS:694/1990 specification for copper cable in existing pipe for earth continuity including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge.
Supplying & run of 2 of 2.5 Sqmm 36/0.3mmFR PVC insulated flexible copper cable in Existing pipe for mains including cost of all materials, all taxes, conveyance to site and all labour charges for all operations etc., complete as directed by Engineer in Charge
Supply and 2 runs of 4.0 sq mm PVC insulated flexible copper cable and 1 run of 2.5 sq.mm flexible PVC insulated copper cable for earthing in the existing conduit pipe for power point including labour charges for 16A sockets.
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., comp Make : Finolex / RR Kabel / KEI
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes : Anchor Penta cherry/ Gold Medal Olive /Million Zoom
Supply and errecting of Fan hook of 12/15 mm dia MS Rod /Gruted in RCC slab with making the slab is original.including all charges complete
Providing independent earthling by excavating a trench to a depth of 1.52 M in all soils, as per size specified in the Data, using 32mm dia 'B' class GI pipe of 1.83 Mtrs length with necessary accessories like copper plate of 200mm size 16 gauge, weighing 1 Kg duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.including 14% over head charges and contractors profit but excluding VAT ans Seigniorage charges
Earthwork in excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges , seigniorage charges for finished item of work including contract profit 13.615%
Cost and supply of sand for filling from approved source including cost and conveyance to work site
Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Foundations
Brick masonry 230 mm thick for panel walls in superstructure with CM (1:6) proportion using II nd class bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/sqcm including cost and conveyance of all materialslike cement ,fine sand(unscreened) ,bricks, water etc., to site , including seignorage charges ,sales and other taxes on all materials and all operational ,incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary,lift charges,curing etc., complete for finished item of work complete.excluding GST and Seigniorage charges
Plastering with CM (1:5) 12 mm thick including cost and conveyance of all materials like cement, finesand(screened), water, etc., to site, cost of seigniorage charges and all other taxes on all materials, and operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) for internal even faces of walls including but excluding GST and Seigniorage charges
VRCC M30 Grade design mix using 20&10 mm HG Chips including cost and conveyance of all materials and labour charges complete for 125 mm thick slab for Septic tank
Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. including 13.615% over head charges and contractors profit but excluding GST ans Seigniorage charges
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
Nit No.17 Schedule.xls
TENDER_DOCUMENT • 0.08 MB
SBD.doc
TENDER_DOCUMENT • 0.64 MB
Download all tender documents and submit your bid