Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 CrAccepted-AOC CHITHIRALANE KOCHARROAD SASTHAMANGALAM THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | L1 | Accepted-AOC L1 Bidder, Agreement Executed | |
| 2 | L2₹32.8 Cr+₹1.7 Cr (5.60%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder |
Tender Value
₹25.2 Cr
EMD Value
₹5 L
Closing Date
21 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Kerala Water Authority, P.H Circle, Kochi-11
KIIFB Augmentation of Water Supply Scheme to Angamaly Constituency Construction of 17 MLD WTP 25 LL OHSR clear water pumping main and allied works General Civil Work
2023_KWA_580766_2
RE-E-Tender No 35/2023-24/SE/PHC/CHN
Open Tender
Civil Works - Water Works
Item Rate
540 days
Angamally
Please refer Tender documents.
9 documents required · 9 mandatory
₹19,518
₹5 L
Kerala Water Authority, P.H Circle, Kochi-11
4 Apr 2025
8 Jun 2023
22 Jun 2023
8 Jun 2023
21 Jun 2023
8 Jun 2023
8 Jun 2023 - 12 Jun 2023
12 Jun 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Aerator-6.80m Dia. | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 44.58 | cum | - | - |
| 1.002 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 3.8 | cum | - | - |
| 1.003 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 3.8 | cum | - | - |
| 1.004 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.56 | cum | - | - |
| 1.005 | 5.37.1:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level | 12.21 | cum | - | - |
| 1.006 | 5.37.2:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work above plinth level upto floor V level | 38.18 | cum | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 54.68 | sqm | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 64.54 | sqm | - | - |
| 1.009 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 61.67 | sqm | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
recovered-award.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
T35NITmerged.pdf
Tender Notice • 3.19 MB
BOQ_857638.xls
BOQ Document • 0.64 MB
122604290.pdf
Tender Document • 0.69 MB
122604291.pdf
Tender Document • 0.07 MB
AdditionalPG.pdf
Tender Document • 1.54 MB
Lowquoted.pdf
Tender Document • 2.51 MB
122604293.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .